Council archive · source document
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requtation.
Refer to Chapter 2, part SA and schedule 10 of
the integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Untess you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management {QUM).
IDAS Assessment Checklist, Version 20, 2 Apnit 2007
20. The application involves (tick applicable bowes) -
[A @ a material change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
1 (i) anurban activity -
(sin an area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inanarea not included in a structure plan where -
» the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
OO (i) intensive animal husbandry; or
CO (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the investigation Area for -
O (i) anurban activity and not specified in section 2.10(2);
- & (i) residential development involving a rural residential purpose and not -
specified in section 2.12(2); or
OO (iii) intensive animal husbandry
C1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
RX] (iii) none of the above
Fisheries matters
For more information refer to schedule 2of the IP
Requiation.
Unless you answered “none of the above" to
Q21, lhe application requires assessment by the
Cepariment of Primary Industries and Fisheries
(DPI8F).
If an agency olher than DPI&F is the assessment
manager for the application, OPI&F is a
concurrence agency for the apptication in
ralation to items (i) - (iv) and an advice agency
in retation to item {v}.
21. The application involves: {tick the applicable box/es)
Ci() anassessable material change of use for aquaculture - complete Part O; of Form 1;
CA (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1,
Diiii
assessable operational work completely or partly within a declared fish habitat area-
campiete Part O2 of Form 1;
C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
Ow)
declared fish habitat area;
none of the above.
development assessable under the IPA, schedule 8, part 1, on land that adjoins a
fal (vi)
Page7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.