Council archive · source document
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383
INTEGRATED PLANNING ACT 1997
Part M, Version 2.2, 27 March 2006
Removal of quarry material (if 6. For works involving the removal of quarry material below high water mark, provide details of the
applicable} resource allocation permit number: (i.e. sand or gravel removed and placed above mean high water spring tide)
Advice for completing Q6 Y :
An approval is required for taking quarry material Sand Pumping Permit Number IPDC00057004E 114
(e.g. stone, gravel, sand, rock, clay, mud, sift or
soil} that is the property of the State. Refer to
the EPA Guideline Allocation of quarry material
on the EPA Website
Calculation of application fee 7. The works are for:
The fee for works other than in connection with &X] (i) coastal management purposes involving beach nourishment, dune fencing, revegetation
the construction of an articial waterway of dunal areas with endemic native plants, stinger enclosures or a purpose directly related
depends on the type of work. There is no fee &e p » SUING purpc ally f
for certain works, For works other than a private| to the provision of a lifesaver or rescue service by a volunteer community organisation;
purpose, the fee is calculated in terms of the oO ee . lating t id .
value of the completed works” (ii) a private purpose relating to a residence;
Refer to EPA Information Sheet “Fees and oO (iii) other than (i) or (ii) above
royalties payable under the Coastal Act".
8. Estimated value of the completed works: | $4 509 000
9. Feelodged: | $6 734
mers or consultant's details (f 410. { Name (in full): Alan Sheridan & — Lex Nankervis
Contact details: Noosa Council (54 495 222) & Slurry Systems Marine(0413 007 387)
Portable Long Service Leave levy (if |11. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
licable|
applicable) ; NO - 012, 13 & 14 do not apply
Prior to issuing a development permit for the
works, the assessment manager Is required by Oo YES - complete Q12
law to "sigh an approved form, issued by -
Qleave, which signifies that the PLSL levy under] 12, Has the PLSL levy been paid?
the Building and Construction industry (Portable . | . .
Long Service Leave) Act 1997 has been paid. O NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to LI YES - complete Q13 & 14
http://www. qleave.qid.gov.au
13. Amount paid:
14. Receipt number:
PLEASE NOTE:
PART M of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form.
The assessment manager may refuse fo accept an application that, at the time of lodgement, fails to provide all applicable information requested by
Part A and any other relevant part of Form 1.
@ OFFICE USE ONLY {applicable to assessment manager)
DATE RECEIVED
| 4027 / See Q8 on Part A of
COSTCODE Form 1 to determine the
| {Applicable to EPA only) district cost centre
REFERENCE NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.