INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land owner's consent {if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an
application must contain, or be supported by, the Name Signature Date
written consent of the land owner/s, if the application
involves:
{i} a material change of use;
(i) reconfiguration of a lot; ;
(ii) work on land below high-water mark & not within a (ii)
canal as defined under the Coastal Protectionand| = |e ee eee
Management Act 1995;0r -
(iv) work on rait corridar land defined under the (ii)
Transport Infrastructure Act 1994. Lee eee diene ee eee eee
Section 3.8.1(2}{a) of the IPA provides that .
landowner’s consent is not required for a mobile or (iv)
temporayERA, 2 a ee ne eee eee eee +--+ ----------- 4------ - ~~ -- ee ee eee eee eee eee eee ee eee eee
For more information refer to Guide 4. (v) -
Resource entitlement (if applicable} 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement de given for applications that
involve a prescribed State resource. oO NO - go to 024 &) YES - go to Q22
Section 3.2.1{10}(a}(li) of the IPA prescribes that an . ee . .
application hei of te to be propery made 22. This application is accompanied by evidence: (tick applicable box)
west sence oe resource enblement (1 (i) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23(vi)
vice for completing Q: om ° ~ . . , .
Refer to schedule 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource ~ go
required by the State in support of the lodging of this es 7
development application. to Q23
C1 (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
hice for com i Jaton 23. Evidence of the resource entitlement:
12 information in {i) - (v) is mandatory if evidence is . , . . i :.
reauited under 022 (i) or (i) above. (i) Resource entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
material under tne Water Act 2000.
Seclion 3.2, 1(5A) allows the resource manager to limit
the lime the evidence may be used, Q23 (vi) must be (iii) Position of delegated officer
completed if the evidence is time limited. Co
(iv) Signature of delegated officer
(v) Date
(vi) pe date of evidence (if applicable)
Assessment triggers 24, Is the IDAS Assessment Checklist completed and attached to this application?
hhocampbton Pn a Butereen oni tt &] Yes (INO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by details to
‘support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact

 

 

 

Plan / Drawing / Report Number Title Date
. - Noosa Main Beach Permanent
(i) Environmental Management Plan Sand Recycling EMP 2008
Definitive Design Manual for
(ii) Design Manual Noosa Beach Nourishment Sept. 2007

Permanent Sand Recycle
System

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's)

: FEE ($} DATE

RECEIVED

REFERENCE |

RECEIVING OFFICER'S
NUMBERIS |

NAME/S

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.