Original source · versioned page text
2016-13 NOOSA CHOCOLATE ISSUE Q revised CURRENT PART 1
Attached to the e-mail MCU16/0098 - Revised drawings for Noosa Chocolate Factory.
Original PDF page 1, section 3. The text section number identifies this passage in the reader.
5
293° 55
StormLw5.37
6
98
2 .70
.
5.
56
5.
57' 1
281
5" 18.652
5.
EMAIL: [email protected]
18
Lid R L 4.48
69
5.
7
85
6.
NORTH
6.
98° 54' 10"
USIL R
5.
1174
98
QBSA LICENCE No. 65942
03
L 4.42
01
008 6
5.
98
USIL R
5
52
4.07 Water plotted from DBYD records 6.0m WIDE
.6
DSIL RL Drawn by SB Checked by DJ
4
5
Telstra plotted from DBYD records INDUSTRIAL
5. 59
.8
5. 5.9
56
6
A DRIVEWAY CROSSOVER Electrical Box/Green Boy
5.
98 9
5.
Client NOOSA CHOCOLATE FACTORY
4.5.8 4
5.
5.
5.
5.
89
11 4
5
79
450
97
92
91
4. .85
4.
2100 LOT 9 VENTURE DRIVE,
1
5.
Concrete Footpath Supplied on 22/08/2016
14
NOOSAVILLE, QLD
5
65
Ela eum (1) U/G Elec Plotted from Detail Works Plan anhole
Sewer M
5.
STREET
5.
84
5.
5
SO104679 REV D
5.
.13
5.
90
Lid RL 6
.
86
94
97
85
73
5.
TREE 4.89 Drawing Description
USIL RLL 4.86
L
5.
TBM
5 .8
5..528 .6
R
4.8 52
5.
5
94
58.2 8
+
Screw in
5.
DSIL R
79
Back of Barrier Kerb
5.
5.
5.
5.
5.93
8
SITE / FLOOR PLAN
81
1
83
86
90
93
Kerb anhole
2
Sewer M
RL 5.60
AHD
L 5.84
Lid R L 4.14
USIL RL 4.11
ater Gra
Stormw5.68
te VENTURE DRIVE Scale As indicated Date 08.03.16
Project No. 2016-13 Sheet No. 01 OF 11
DSIL R Lid RL 4.58 Ban int (1) Ban int (1)
USIL RL SKETCH DWGS Issue Q
STREET STREET
TREE TREE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.