20220218 22 Grant SWMP · MCU22/0172

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

GENERAL NOTES                                                                             COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.                  EARTHWORKS NOTES                                                                 ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                                                                                          CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND                                                                                                     PRACTICAL TO RESTRICT DUST MOVEMENT.
1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                           STOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED.                         1.  FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
                                                                                                                                                                         INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS                         THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.             18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                       RECOMMENDED THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED                    WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
     CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                        HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                               TO CONFIRM THE SOIL CONDITIONS PRIOR TO EARTHWORKS
     SETOUT THE WORKS.                                                                                                                                                                                                                            20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
                                                                                  19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT                                COMMENCING.
                                                                                                                                                                                                                                                      REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                           AUTHORITY: ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN                     2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF                     GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
     SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                        FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO                          100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED                           UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED
     CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                        ALLOW FOR ALL COSTS ASSOCIATED WITH IMPLEMENTATION OF THE                          OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF                          AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M
     GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED                         TMP.                                                                               LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN                     IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
     STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                                                                                                         STRUCTURAL FILL.
                                                                                  20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                                                                                                          ENGINEER.
3.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE                       AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN                            3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR                  21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE
     OF THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION                     ACCORDANCE WITH OPW APPROVALS BY COUNCIL.                                          SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING                          ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE
     AND LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL                                                                                                               SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE                     OF A SPECIALIST SHORING CONTRACTOR.
     RECTIFY AT THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS                      21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                          MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                      BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                                                                                                  22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
     INCURRED BY RECOR.                                                                                                                                              4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES                              SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                                                                      THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                      SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY
4.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                    RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                                                                                            CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
     SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY                                                                                                         COMPACTION EQUIPMENT. CARE MUST BE TAKEN TO ENSURE THERE ARE                 STRUCTURAL ENGINEER.
     IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                      22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION                          NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE
                                                                                                                                                                                                                                                  23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT
     COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF                    DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                       COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND
                                                                                                                                                                                                                                                      ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON
     THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND                                                                                                             AS1289.
                                                                                  23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                                                                                                     THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM
     LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY                     ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN                       5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE                        FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
     WORKS. ANY DISCREPANCIES SHALL BE REPORTED TO THE                                AND CONSTRUCTION CODE (2013).                                                      REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN                      SATISFACTION.
     SUPERINTENDENT. CONTRACTOR TO LOCATE AND PROTECT SERVICES                                                                                                           AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN
                                                                                                                                                                                                                                                  24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS
     AS REQUIRED DURING PROPOSED WORKS.                                                                                                                                  WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY
                                                                                                                                                                                                                                                      INCLUSIVE OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING
                                                                                  STANDARD SIGNS AND LINE MARKING NOTES                                                  HEAVY MOBILE PLANT ON THE SITE.
                                                                                                                                                                                                                                                      DRAWINGS FOR BUILDING SLAB THICKNESSES AND HYDRAULIC
5.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                                                                                      6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND
     SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS                    1. GENERAL                                                                                                                                                          DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF
                                                                                                                                                                         COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED                     REQUIRED BULK EARTHWORKS SURFACE.
     SHOWN ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING                        1.1.  ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH                      AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM
     SERVICES CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS.                              THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC                                                                                                       25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
                                                                                                                                                                         LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED
     CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR                         CONTROL DEVICES (CURRENT EDITION).                                                                                                                           GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                                                                                                                                                                         MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM
     AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.                  2. SIGNS                                                                                                                                                            FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO
                                                                                                                                                                         PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO
                                                                                    2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS                                                                                                UNDERTAKE THE PRELOADING OPERATIONS.
6.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS                                                                                                         COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL
                                                                                         NOTED OTHERWISE.                                                                HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF          26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
     SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS,
     FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND                     2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                      LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
     ROAD PAVEMENTS.                                                                     EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                   7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE               INSPECTIONS:
                                                                                         POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM                        CONTENT FOR STANDARD COMPACTION.
7.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                                                                                                                                                                                  THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
                                                                                         FACE OF KERB.                                                               8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
     AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR                                                                                                                                                                                           BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS
     REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE                             2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                         PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                         TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS                     RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN            TO PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
     SATISFACTION OF INFRASTRUCTURE OWNER/MANAGER /                                                                                                                                                                                               INSPECTIONS. SHOULD THE
     AUTHORITY/COUNCIL.                                                                  TO BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                          CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                                                                         HEADLIGHT.                                                                      STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH             CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
8.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                     3. SIGN SUPPORTS                                                                       CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.                        RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED
     WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                                                                                                                                                                    TO THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
                                                                                    3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS                     9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR
9.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN                             WHERE THEY ARE IN A PAVED SURFACE.                                              CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.                        RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE
     CLOSE PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR                            4. LINEMARKING                                                                     10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2'            CONTRACTOR.
     INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO                       4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                      SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF            a.   PRESTART
     PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY OF                      4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                          AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL
     EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE                                                                                                        PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS             b.   EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF
     USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS                                                                                                               HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND                     SEDIMENT AND EROSION CONTROL MEASURES UNSUITABLE GROUND
     REQUIRED.                                                                    JOINTING NOTES                                                                         SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE           c.   SIDE AND CUT OFF DRAINS
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                                                                                                             TO THE REQUIRED BEARING CAPACITY UNDER THE
                                                                                  1.      ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                                                                                                  d.   STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
    THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE                                                                                                        PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.
    WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.                                         REQUIREMENTS OF AS3727.1:2016.                                             11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED               e.   STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                  2.      SAW CUT JOINTS MUST BE:                                                        TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                                                                                                                                                                                         f.   STORMWATER STRUCTURE BASE SLABS
                                                                                              BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS.
                                                                                                                                                                         AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN
    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                              2.1.                                                                                                                                                       g.   SEWER RETICULATION
                                                                                                      4     3                                                            LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR                         2.2.
                                                                                          CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                             12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO                 h.   WATER RETICULATION
    TO NOTE COUNCILS ADAC REQUIREMENTS.
                                                                                       2.3.
                                                                                          PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE                           TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH                                                                                                                                                                                          i.   PAVEMENT SUBGRADE
                                                                                          POURS.                                                                         300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL
    RELEVANT APPROVALS.                                                           3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT                      EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL                       j.   PAVEMENT REINFORCING
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                         TO ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                      ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                  k.   PAVEMENT PRIOR TO SEALING (PRESEAL)
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                      4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                      13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
                                                                                      CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES                          ACCORDANCE WITH LANDSCAPE DRAWINGS.                                      l.   RETAINING WALL FOOTING REINFORCING
    CONSTRUCTION.
                                                                                      IN THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                              14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                      m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR
                                                                                  5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES                    15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED                  n.   STEEL REINFORCEMENT OF CONCRETE STRUCTURES
    DEMOLITION WORKS COMMENCING ON SITE.
                                                                                      ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB                      MANAGEMENT PLANS.
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,                          SURFACE.                                                                       16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE               o.   PRACTICAL COMPLETION
    ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE                 6. DOWEL BARS ARE TO BE                                                                INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE           p.   ON MAINTENANCE
    U.N.O.                                                                         6.1.   FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                     ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                                                  q.   OFF MAINTENANCE
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                             400MM CENTRES                                                              17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO                               6.2.   FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                     OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT              r.   ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
    COMMENCEMENT OF ANY WORKS ON SITE.                                                    300MM CENTRES                                                                  AUSTRALIAN STANDARDS AND LEGISLATION.                                         DEVELOPMENT APPROVAL)
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS                         6.3.   FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                 18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON                   s.   ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
    IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN.                                300MM CENTRES                                                                  UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT                   RELEVANT TO THEIR CERTIFICATION SCHEME
    CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE                                                                                                                   LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS




                                                                                                                   CLIENT DETAILS:                                        PROJECT ADDRESS:                                   APPROVED BY:                  PROJECT NAME:

                                                                                                                                                                                                                                                           PROPOSED RESIDENTIAL DUPLEX
                                                                                                                              INTEGRA PARTNERSHIPS                                                                                                         TITLE:                               STATUS:

                                                                                                                                                                                     22 GRANT STREET                                                       GENERAL NOTES                        FOR APPROVAL - NOT FOR
                 © ABN 89 647 469 707
                                                                                                                                                                                   NOOSA HEADS, QLD, 4567                          NATHAN WAGSTAFF                                              CONSTRUCTION
                  75 NOOSA DRIVE                                                                                                                                                                                                      RPEQ: 20693
                                                                                                                   SCALE:
               NOOSA HEADS, QLD 4567                                                                                                                                                                                                    CPEng
                   +61 7 5211 1003               REV   DATE             DESCRIPTION             DWN    CHK   APP
                                                                                                                                               N.T.S                                                                                DATE: 23/09/2022
                                                                                                                                                                                                                                                           DRAWING NUMBER:                      PROJECT NUMBER:          SHEET REV:
                                                                                                                                                                                                                                                                                                                          SIZE:
               RECORCONSULTING.COM                                          REVISIONS
                                                                                                                                     DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                           002                                   20220218                A1 01

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20220218 22 Grant SWMP.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.