Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

20220218 22 Grant SWMP · MCU22/0172

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                             1 METER MAX.               STAR PICKETS

                                             PROVIDE WASH WATER FOR                                                                                     DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                 WITH GRATE
                                             TRUCKS EXITING SITE
GRID 100mm HIGH AND




                                                                                                                                                                                                                                                                                                                                   500 - 600mm
                                             MIN LENG                                                                                                   WIRE OR STEEL MESH
SPACED AT 300mm CTS                                                                                                                                     (14 GAUGE x 150mm                                                                                                    WRAP FILTER
                                                      T   H 10m                                                                                         OPENINGS) WHERE GEOTEXTILE                                                                                           CLOTH OVER GRATE
                                                                         BERM 300 HIGH MIN
  CONSTRUCTION SITE                                                                                                                                     IS NOT SELF-SUPPORTING
                                                                                                                                                        WOVEN GEOTEXTILE                                                                                                                                                                                                     1.5m STAR
                                                                               EXISTING ROADWAY                                                                                                                                                                                                                                                                              PICKETS
                                                                                                                                                                                                                                                                                                                                                                             AT MAX. 2.5m CENTRES

  GEOTEXTILE FABRIC                                                                                                                                STAR PICKET                                                                                                                                                                                                            SELF-SUPPORTING
                                                                                                                                                   FITTED WITH                                                                                                                                                                                                            GEOTEXTILE
                                             50-75mm GRAVEL BED                                                                                    SAFETY CAP                                                                                                                                                                                                                        OW
                                             MIN 200mm THICK                                                                                                                                                                                                                                                                                                          DIRECTION OF FL
                 RUNOFF FROM PAD DIRECTED                                                           SANDBAGS                                 WOVEN GEOTEXTILE
                 TO SEDIMENT TRAP
                                                                                                                                                      RUNOFF                                                                               WRAP FILTER
                                                                                                                                                                                                                   RUNOFF                                                                                                                                                    ON SOIL, 150mm x 100mm
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                        WATER WITH                                                                           CLOTH OVER GRATE




                                                                                                                            FLOW
                                                                                                                                                                                                                   WATER WITH                                                                                                                                                TRENCH WITH
                                   SCALE: N.T.S.                                                    WATERWAY                                          SEDIMENT
                                                                                                                                                                                                                   SEDIMENT                                                                                                                                                  COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                             AND ON ROCK, SET INTO
                                                                                                                                                                                                                                                                                                                                                                             SURFACE CONCRETE




                                                                                                                                                                                                                                                                                                                                   600mm MIN.
                                                                                                    EXCAVATION
                                                                                                                                                                                                                                                          FILTERED                                                                                       SECTION DETAIL
                                                                                                                                                                             FILTERED
                                                                                                                                                                              WATER                                                                        WATER
                                                                                                                                                     GEOTEXTILE
                                                                                                    EARTH BANK                                       EMBEDDED 150mm




                                                                                                                                                                                                                                                                                                              MIN. 1.5m
                                                                                                                                                     INTO GROUND                                                                                                                                                                                                 20m MAX.
                                                                                                                                             FOR DROP INLETS AT NON-SAG POINTS,                                          GEOTEXTILE INLET FILTER TYPE B                                                                                                                         FLOW
                                                                                                                                             SANDBAGS, EARTH BANK OR EXCAVATION                                                                 SCALE N.T.S
                                                                                                                                             USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                           STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                           MAX. 2.5m SPACINGS
                                                                                                      GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                          TYPICAL
                                                                                                      1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                      2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                            PLAN

                                                                                                      3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                           OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                      4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                                                                                                                                                                                                                                                                                                                 DISTURBED             DIRECTION           1.5m STAR PICKETS
                                                                                                           ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                                                                                                                                                                                                                                                                                                                 AREA                  OF FLOW             AT MAX. 2.5m
                                                                                                                 GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                                 CENTRES
                                                                                                                                    SCALE N.T.S

                  TIMBER SPACER                     KERB-SIDE
                  TO SUIT                           INLET




                                                                                                                                                                                                                                                                                                                                                 UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                 AREAS

                                                    GRAVEL-FILLED WIRE
                                                    MESH OR GEOTEXTILE
                                                    "SAUSAGE"
                            OVERFLOW         TIMBER SPACER
  RUNOFF                                                                                                           GRADIENT OF
  WATER WITH                                 TO SUIT                                                                                                 CAN BE CONSTRUCTED       ALL BATTER
                                                                                                                   DRAIN 1% TO 5%
  SEDIMENT                                                                                                                                           WITH OR WITHOUT          GRADES 2(H):1(V)
                                                                                                                                                     CHANNEL                                                                                                                                                  SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                              MAX.                                                                             STABILISE STOCKPILE SURFACE
                                                                                                                   DIRECTION O                                                                                                                                                                                1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                                    F FLOW                                                                 EARTH BANK                                        2:1                                                  TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE




                                                                                                                                                                                   300mm MIN.
    SEDIMENT                                                                                                                                                                                                                                       AX.)            SLO                                            DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                              E (M                    PE
                                                                                                                                                                                                                  FLOW                  LOP                                (MA                                    CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      GRAVEL-FILLED WIRE                           FILTERED WATER                                                                                                                                                               2   :1 S                                      X.)
                                                                                                                                                                                                                                                                                                                  CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                          STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                         2m MIN
                                                                                                                        150mm MIN




      "SAUSAGE"
      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                               NOTE: ONLY TO BE USED AS TEMPORARY                                                                                      SEDIMENT FENCE                                     2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                        BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                      THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                   IS 80 METRES.
                                                                                                                                                                                                             STOCKPILE CONSTRUCTION NOTES:                                                                    3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                      DIVERSION DRAIN CONSTRUCTION NOTES:
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                 1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                      THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                 1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                    VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                          FITTED WITH SAFETY CAPS.
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                         2.      AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                             2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                  4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                                                                                                                                                                                                                                 ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                   3.      ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                                   3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                      WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                           IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
           BLOCKS.                                                                                                                                                                                                  THAN 2 METRES IN HEIGHT.                                                                              GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                   4.      BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                       SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                               4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                           CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                    FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                             5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                               LESS THAN 0.10.
                                                                                                                   5.      ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                  6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                         5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                                      THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                   6.      COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                    STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                           CONSTRUCTION.
                     MESH & GRAVEL INLET FILTER                                                                                              DIVERSION DRAIN                                                                                       STOCKPILES                                                                                       SEDIMENT FENCE
                                   SCALE N.T.S                                                                                                     SCALE N.T.S                                                                                            SCALE N.T.S                                                                                        SCALE: N.T.S.




                                                                                                                        CLIENT DETAILS:                                                         PROJECT ADDRESS:                                                                    APPROVED BY:                          PROJECT NAME:

                                                                                                                                                                                                                                                                                                                          PROPOSED RESIDENTIAL DUPLEX
                                                                                                                                     INTEGRA PARTNERSHIPS                                                                                                                                                                 TITLE:                                                        STATUS:

                                                                                                                                                                                                           22 GRANT STREET                                                                                                EROSION AND SEDIMENT                                          FOR APPROVAL - NOT FOR
     © ABN 89 647 469 707
                                                                                                                                                                                                         NOOSA HEADS, QLD, 4567                                                           NATHAN WAGSTAFF                 CONTROL DETAILS                                               CONSTRUCTION
      75 NOOSA DRIVE                                                                                                                                                                                                                                                                         RPEQ: 20693
                                                                                                                        SCALE:
   NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                       CPEng
       +61 7 5211 1003                       REV    DATE              DESCRIPTION             DWN    CHK     APP
                                                                                                                                              NOT TO SCALE                                                                                                                                 DATE: 23/09/2022
                                                                                                                                                                                                                                                                                                                          DRAWING NUMBER:                                               PROJECT NUMBER:        SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                SIZE:
   RECORCONSULTING.COM                                                       REVISIONS
                                                                                                                                             DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                          031                                                           20220218               A1 01

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20220218 22 Grant SWMP.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.