20220218 22 Grant SWMP · MCU22/0172
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Delorme Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.016 0.018 0.002 13%
50% 0.018 0.020 0.002 11%
0.2 EY 0.027 0.030 0.003 11%
10% 0.035 0.036 0.001 3%
5% 0.040 0.041 0.001 3%
2% 0.047 0.047 0.000 0%
1% 0.051 0.051 0.000 0%
As expected, the site has increased the total peak flows from the site, however the overall increase is minor with a
maximum of 3L/s increase under 2100 climate conditions. This level of increase is unlikely to result in significant
impact or nuisance to the downstream network and is therefore negligible. No attenuation is proposed for the
development.
Project number 20220218 Page 8 of 14
File 20220218 22 Grant SWMP.docx, 2022-09-15 Revision 1
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20220218 22 Grant SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.