Original source · versioned page text
Planning Report No. 61500
Attached to the e-mail Applicant advises of Referral - RAL19/0008.
point in both directions, as demonstrated by the Sight Distance Assessment
prepared by TOD Consulting Engineers and attached at Appendix D.
4.1.3 Stormwater Management
As demonstrated by the topographical contours shown on the Plan of
Development, Plan No. 61500 prepared by Murray & Associated (Qld) Pty Ltd
and attached at Appendix C of this report, the natural fall of the land results
in stormwater flows running to the vegetated portion of the site. Due to the
large lot size of the rural settlement allotments, stormwater is able to be
contained and naturally filtered wholly within each lot. The volume of
stormwater generated by the proposed subdivision is minimal and will not
adversely impact on adjoining properties.
4.1.4 Waste Management
Adequate room is available along the verge of Black Mountain Road to
facilitate the placement of waste bins. On-street waste collection is the
current method servicing the subject site and surrounding properties and
ensures that waste vehicles do not need to enter the site and conduct turning
manoeuvres.
4.1.5 Services
As mentioned under Section 3.1.7 of this report, the subject site is located
within a rural area and is provided with the following infrastructure services: -
A reticulated supply of electricity;
A reticulated supply of telecommunications;
On-site water supply; and
On-site effluent disposal treatment systems.
Electricity and telecommunication services will be extended to proposed Lot 2,
and the future dwelling will be serviced by on-site water and on-site effluent
disposal.
9
Planning Report 61500 Murray & Associates (Qld) Pty Ltd March 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.