Attachment C - SCG Engineers Response
Issue 8 – Acid Sulphate Soils
As the Civil and Structural Engineers for the project we can confirm a Geotechnical Engineer has been engaged
to conduct acid sulphate soils (ASS) investigation and an ASS Management Plan in the case ASS are
encountered. The current turnaround timeframes are greater than 6 weeks. We kindly ask Noosa Council if this
can be conditioned prior to conducting a pre-start meeting.
Yours faithfully
Checked by
TOM HARRINGTON SEAN RICHARDSON– RPEQ 5835
For and on behalf of For and on behalf of
SCG CONSULTING ENGINEERS SCG CONSULTING ENGINEERS
Enc SCG Consulting Engineers Drawings – 31026-CS1.1, OW1.1 thru OW7.1, SW1.1 & C1.1A
SCG Consulting Engineers Page 2 of 2 SCG Ref: 31026(L1)