Original source · versioned page text
Planning Report 60669
Attached to the e-mail Reconfiguration of a Lot (1 Lot into 4 Lots) - RAL17/0504.
Performance outcomes Acceptable outcomes Response
mitigation measures are undertaken, the
development results in an acceptable
significant residual impact on a matter of
state environmental significance.
Statutory note: (3) only applies to development on
Brisbane core port land within the area identified as
E1 Conservation/Buffer, E2 Open Space or
Buffer/Investigation in the Brisbane Port LUP precinct
plan. For the Brisbane Port LUP, see
www.portbris.com.au.
Note: Guidance for determining if the development
will have a significant residual impact on the matter of
state environmental significance is provided in the
Significant Residual Impact Guideline, Department of
State Development, Infrastructure and Planning,
2014. Where the significant residual impact is
considered an acceptable impact on the matter of
state environmental significance and an offset is
considered appropriate, the offset should be delivered
in accordance with the Environmental Offsets Act
2004.
Table 8.2.2: All operational work
Performance outcomes Acceptable outcomes Response
Private marine development
PO17 Private marine development does not No acceptable outcome is prescribed. Not applicable.
require the construction of coastal protection
work, shoreline or riverbank hardening or
dredging for marine access purposes.
Disposal of solid waste or dredged material from artificial waterways
PO18 Solid waste from land and dredged No acceptable outcome is prescribed. Not applicable.
material from artificial waterways is not disposed
State Development Assessment Provisions – version 2.0
State code 8: Coastal development and tidal works Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.