Original source · versioned page text
Planning Report 60669
Attached to the e-mail Reconfiguration of a Lot (1 Lot into 4 Lots) - RAL17/0504.
Performance outcomes Acceptable outcomes Response
or strategic airports and aviation facilities, in
accordance with a statutory land use plan or
master plan, where there is a demonstrated
net benefit for the state or region and no
feasible alternative exists; or
3. coastal protection work or work necessary to
protect coastal resources or coastal
processes.
Table 8.2.3: Operational work which is not assessed by local government
Performance outcomes Acceptable outcomes Response
PO23 Works are located and designed such that AO23.1 Tidal work is designed and located in Not applicable.
they continue to operate safely during and accordance with the Guideline: Building and
following a defined storm tide event. engineering standards for tidal works,
Department of Environment and Heritage
Protection, 2017.
State Development Assessment Provisions – version 2.0
State code 8: Coastal development and tidal works Page 8 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.