08/1546 - Additional information as requested - Dwelling & retaining Walls [As Published] · 132008.1546
U
Professional
Cicenced Building Centifier, NOA927431
Mcenced Builden NO 32253
Date 14.7.2009
Sunshine Coast Regional Council
Noosa Office
PO Box 141
Noosa Qld 4565
Attn Helen Lowrie.
Submission of additional information as requested in Information
request from council, your ref 2008/1546
Type of Work: Dwelling and retaining walls
Site Address: 16 Whale Dve Sunshine Beach
Property Description: Lot 23 RP 865301
Further to your email request | have attached 4 sets of plans in relation to the
information request by council dated 16 February 2009.
Please forward this information to the new planner allocated for this assessment, as |
understand that Glen the previous planner is on leave.
As all the information has been provided | now request council to proceed with the
assessment and the finalisation of this matter.
Yours faithfully
Peter Lusio
BUILDING CERTIFIER, Accreditation # A927431
45 JUL 2009
SGRG
Tewantin
Suite 14, 21 Nicklin Way, Buddina Q 4575
Phone: 54440430 + Fax: 54440429 - Mob: 0416260416
[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 31 pages
Page 2
os | Sunshine Coast Regional Council Qid 4560 ABN 37 876 973 913 Officer: Locked Bag 72 Sunshine Coast Mail Centre 0p*3q0 T 07 5475 7272 * O7 5475 7277 £ [email protected] Glen Conforti Direct Telephone: 5449 5379 Response Address: Email: 16 February 2009 Kawana Building Approvals 14/21 Nicklin Way BUDDINA QLD 4575 Dear Sir/Madam We www.sunshinecoast.qld.gov.au PO Box 141, Tewantin QLD 4565 [email protected] Our Reference: 2008/1546 . Your Reference: Information Request Integrated Planning Act 1997 | refer to your application and wish to advise that we require further information to satisfactorily assess the proposal. Please provide 2 copies of ail information to be supplied, including an A3 set of plans and a CD copy. [t:. -APPLICATION:DETAILS.. | Application No: 2008/1546 Proposal: 08/1546 Detached House Street address: Real property description: Planning Scheme: Noosa Plan 16 Whale Drive SUNSHINE BEACH LOT: 23 RP: 865301 12: INFORMATION REQUIRED The information requested is set out below: Water and Sewer 4. A Council sewer traverses the southern boundary of the development site. The sewer is not shown on the plans submitted. The following information is required ; a. An accurate (surveyed) location of the sewer line in relation to the property boundary b. Cc. Caloundra Office 1 Omrah Avenue Caloundra Qld 4551 T 07 5420 8200 F 07 5420 8900 to be shown on the site plan A long-section of the sewer showing depth from existing surface levels to invert of the sewer pipe Amended plans showing buildings and structures, including retaining walls greater than 1 metre high and their footings, located a distance away from the sewer equal to the depth of the sewer or a minimum of 1.5 metres whichever is the greater. Maroochydore Office 11 - 13 Ocean Street Maroochydore Qid 4558 T 07 5475 8501 F 07 5441 8338 Nambour Office Cnr Currie and Bury Streets Nambour Qld 4560 T 07 5475 8501 F 07 5441 8338 Tewantin Office 9 Pelican Street Tewantin Qld 4565 T 07 5449 5200 F 07 5447 1062
Page 3
Land Development 2. There is uncertainty whether the proposed fence along the easement may be located within the zone of influence of the stormwater pipe. The plans indicate the approximate stormwater line location only. An accurate location in the form of a long section and cross section of the stormwater line invert in relation to existing and finished surface levels is required to ensure Structures will not be located within the zone of influence of the stormwater infrastructure. For the purposes of this request, the zone of influence is identified as the area within a 45-degree angle measured from the invert of the stormwater line to the finished surface level. 3. Land Development officers are concerned that stormwater overflow will pond in the courtyard encompassed by the block fence at the southeast and western corners of the property. Please provide a preliminary drainage plan to demonstrate that water will not pond in the courtyard areas. 4. Land Development officers are concerned that slumping of excavated areas may occur during and post construction, Please provide a site-specific geo-technical report prepared by a registered professional engineer (RPEQ) that identifies methods of stabilising all excavated areas during and post construction. Under the provisions of the Integrated Planning Act 1997, you have three options available in response to this Information Request. You may give the assessment manager (in this instance Council) and each referral agency (if any): 1. all of the information requested; or 2. part of the information requested together with a letter asking the assessment manager and each referral agency .to proceed with the assessment of the application; or 3. a letter: (i) stating that you do not intend to supply any of the information requested; and (ii) asking the assessment manager and each referral agency to proceed with the assessment of the application. Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to respond to any information request within 12 months of the request or otherwise, the application lapses. A response to the above is required to be submitted, prior to further assessment of the application. If any further matters arise as part of assessment of this application, you will be advised accordingly. Council prefers that all the information requested be submitted as one package. A preliminary assessment only of the application has been undertaken and during the formal decision stage, or as a result of public exhibition, other matters may arise. You are requested to advise your client directly regarding this request. Information on the status of development applications may be viewed using PD Online, which is accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qid.gov.au . Using the "Quick Links" on the left hand side of the screen, users may select "PD Online” by clicking on it, which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users may click on "agree" if they agree and can enter either the development application number, or the address of the property to start viewing information on it on the application. Should you have any further queries in relation to the above, please do not hesitate to contact me on the above number. , celle ED
Page 4
Yours faithfully, ph of Glen Conforti TECHNICAL OFFICER - LAND USE
Page 5
. Brisbane Gold Coast Sunshine Coast
Unit 6 / 648 Boundary Rd Unit 1 / 81 Casua Dve Shop 5 / 1 Lakeshore Ave
Richlands Qtd 4077 Varsity Lakes Qld 4227 North Buderim Qid 4556
Tel: (07) 3363 8181 Tel: (07) 5522 1995 Tel: (07) 5445 4200
CONSULTING Fax: (07) 3375 9299 Fax: (07) 5522 1776 Fax: (07) 5445 3566
ENGINEERS
“STA Consulting Engineers leads the way in engineering solutions from concept to completion”
03/06/2009 STRO217-20090603-HW-1
Bob Hedges
P.O. Box 6354
St. Lucia, QLD 4703
Dear Bob,
RE: No. 23 Whale Drive Sunshine Beach
STA Consulting Engineers were requested to provide an engineering solution to excavations that will be carried
out to build retaining walls on the above mentioned site. These retaining walls are running parallel to adjoining
blocks of land which currently exist.
These excavations need to be protected so as to prevent a soil slip that that may undermine properties existing
on adjoining block of land along the boundaries. The most critical excavations are along the South Eastern
boundary adjoining the block of land that consists of an existing dwelling and a council easement. A storm
water and sewer line is located within this easement. These services are clearly shown in the site plan by Axis
Surveys (Job No. 07-04677, Order No. AX58423, Dated 21/11/2007 page 1 of 1).However, excavations along
the boundaries of adjoining vacant blocks may be carried out with out this temporary system as the material can
be backfilled once the retaining walls are built.
STA Consulting Engineers have proposed a temporary retaining system as a solution to this problem. The
design and construction procedure required to build this temporary retaining system is shown in STA Structural
Drawings (Job No.STR — 0217, DRG No.S01, Sheet 1 of 1, Rev. P).
This letter should be read in conjunction with Axis Surveyors and STA Consulting Engineers drawings to
facilitate better understanding of the proposed system. The copies of all relevant drawings have been forwarded
to the client.
The design considerations were based on the existing ground conditions as seen through photographs that were
provided to us by the client on cuts made into the soil so as to check its stability as it exists in its natural state
and also the geotechnical report (Job No. 91485 Amended, Dated 20/10/2008) prepared by STA Consulting
Engineers. ,
STA Consulting Engineers require that the existing services within the easement be located accurately in
addition to the survey drawings provided prior to commencement of work as previous experience has shown
that these services may not necessarily be located as shown on the survey drawings. If the locations of the
services differ significantly from those shown in the survey plan please contact STA Consulting Engineers for a
review of the design drawings.
We hope this will be sufficient for you to go ahead with your project. If you need any assistance please contact
our Office at your earliest convenience.
‘Yours fait
STA “Alliane
NES } RDE& SIS
_ Harsha Weerasin, {|r » Deb Banda
énior Engineer — Stritet ral Principle Geotechnical Engineer
http-Avww staconsulting com. au
Brisbane- Rockhampton: Sunshine Coast + Gofd Coast - Toowoomba
Page 6
Compliance Certificate for building Design or
Specification 15
NOTE
This is to be used for the purposes of section 10 of the Building Act 1975 andfor section 46 of the
Building Regulation 2006.
RESTRICTION: A building certifler (class B) can only give a compliance certificate about whether
building work complies with the BCA or a provision of the QDC. A building certifier (Class B) can
not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description
This section need only be completed if
details of street address and property
description are applicable.
EG. In the case of (standardigeneric)
pool design/shell manufacture and/or
patio and carport systems this section
may not be applicable.
The description must identify all land the
subject of the application,
The bot & plan details (eg. SP / RP) are
shown on tile documents or a rates notice.
If the plan ts not registered by title, provide
previous lot and plan details.
2, Description of components certified
Cleary describe the extent of work covered by
this certificate, e.g. all structural aspects of the
steal roof beams.
Street address {nclude no., street, suburb /Iocality & postcode)
Whale Drive
Sunshine Beach Postcode 4567
Lot & plan details (attach list if necessary) _
[3
In which local government area is the land situated?
Sunshine Coast Regional
Temporary Retaining Wall System
3. Basis of certification
Detail the basis for giving the certificate and the
extent to which tests, specifications, rules,
standards, codes of practice and other
publications, ware relied upon.
AS 1170.0, AS 1170.1, AS 1720, AS 4100, AS 4678.
v- LOCAL GOVERNMENT USE ONLY
!
|
Dare cere
Hop
: : Approved torr 18
i Referonee Numbers | | ee ean
Page 7
“ a
Form 15 continued
4, Reference documentation
Clearly dentify any relevant documentation,
€.g. numbered structural engineering plans.
As per A3 architectural drawings by received on 18/05/09 and
structural drawings by STA Consulting Engineers, Job No.STR-0217, Sheet No. 1
5. Building certifier reference number
Building certifier reference number
[
6. Competent person details
A competent person for building work, means a
person who is assessed by the building certifier
for the work as competent to practise in an
aspect of the building and specification design,
of the building work because of the individual's
skit, experience and qualifications in the
Name {in full)
| Harsha Weerasinghe
Company name (if applicable)
[ STA Consulting Engineers
Contact person
| David Thomson
aspect. The competent person must also be Phone no. business hours Mobile no. Fax no.
registered or licensed under a law applying in (07) 3363 8181 | | : | (07) 3375 9299
the State to practice the aspect. -
. . Email address
Ifno relevant law requires the individual to be . - "
licensed or registred tobe abla to give the | [email protected]
help, the certifier must assess the individual as
having appropriate experience, qualifications or Postal address
skills to be able to give the help. Unit 6, 848 Boundary Road
Ifthe chief executive issues any guidelines for Richlands, QLO Postcode 4077
assessing @ competent person, the building
certifer must use the guidelines when Licence or registration number (if applicable)
assessing the person.
RPEQ8372~._
zZ .
7. Signature of competent person Date i é
This certificate must be signed by the individual TAL ap
assessed by the building certifier as competent. I J 86 | > 1 i
| The Building Act 1975 is administered by the ' Queensland Government
Department of Infrastructure and Planning a a tenn een
Department of [nfrostructure and Planning
Page 8
Foundation Design Report
Date: 24th June, 2009
Project Job Number: 91485 Amended
Site Address : Lot 23 Whale Drive, Sunshine Beach
Local Authority : Sunshine Coast Regional
Site Classification
(at time of Soil Testy: l@88P
The site classification Is based upon drainage and tree issues being addressed by the installation of adequate on site drainage
measures and the installation of root barriers as outlined in Section 2.0 of the STA Alliance Reference Guides.
The "P* classification is due to tow bearing capacities encountered in the soil profile. This report does not cover slope stability. If this is required, i is
commended that an independent test be carted aut by a qualified Geotechnical Engineer specialising in this area.
Site Details P Building Design Detal Proposed Site Preparation Details
{at time of soittest) (supplied by our client) (stipulated by our client)
Vegetation: Scrub Multi Storey
Slope: Very Steep Face Brick, Block and Cladding Cut / Fill
Drainage: Good Concrete and Timber Floor
Site preparation
The construction pad is to be cleared of vegetation and loose material. The pad is to be prepared in accordance with the propased site preparation details
a8 indicated to Soiltest Australia Engineering Services Pty Ltd (Le. Cut/fil, total cut etc.) If any trees are removed from the buikting pad area, the voids
created by their removal, must be excavated, backfilled and compacted with suitable material.
| Founding Materia!
; Edge Beam and Slab : Natural Medium Dense Silty Sand
fl Pad Footings for Posts & Point Loads : Natural Medium Dense Silty Sand
\ Minimum Depth of Pad Footings :
‘Where the depth to suitable founding material is significant, excavated or drilled piers can be adopted, Where the length of drilled footing piers exceeds.
1500mm, they are to be reinforced with 4/N12 bars tied to an R6 spiral @ 150mm pitch or equivalent & fied into the Edge Beam Footing cage.
Ahemativety an equivalent pre-fabricated steel cage may be adopted. Footing depth may ba reduced where refusal on shallow rock is encountered,
providing bracing and tie-down requirements are not adversely affected. When the required bracing and tie-down requirements are not attained rock
anchors must be utilised, Note; Pad faoting depth and/or diameter is also subject to bracing and tie-cown requirements,
———Shatlow Rock, Boulders and Rock Qutcrops
The depth of the edge beam may be reduced where refusal on shallow rock, on a rock boulder or partially over a small rock outcrop is encountered.
‘Where this depth is less than 400mm, top steel, comer bars and starter bars may be deleted. Note; Before the beam depth becomes less than 400mm,
top steel is to be lapped 500mm with the bottom steel. ft is also required that a minimum edge beam depth of 200mm must be maintained at all times. It
is also recommended that the wafls are articulated at the ster! and end of the rock outcrop.
Masonry Articulation
All masonry walls, except retaining wafls, require full height (footings to eaves) asticutation @ 5 metre spacings (maximum) regardiess of comers, Refer
Technical Note 61 produced by the Cement and Concrete Association for details,
ortification of Soils and Desi te} - Obfigations iider and Home Owner/Occupier
The performance of the footings and stab or both is largely depended upon # responsible approach by the builder and owner/occupier towards vegetation
and site drainage.
THE DESIGN DOCUMENTATION REFERENCE GUIDE VERSION 6002 2.1.
4. Is part of this Foundation Design Report and this Foundation Design Report cannot be relied on without it;
2. Must be read and understood by the butder,
3. Contains requirements and recommendations, and ail requirements and recommendations must be complied with by the builder;
THE HOME OWNER’S REFERENCE GUIDE VERSION 6002 1.1.
1. {8 part of this Foundation Design Report for the use af the homeownerfoccupler;
2. Must be read and understand whera appropriate by the homeawnerfoccupier,
3. Contains requirements end recommendations, and all requirements and recommendations must be complied with by the homeawner/occupier,
‘Where there is ANY FAILURE of the builder or homeowner/occupier to comply with the above obligations then the RESPONSIBILITY for ANY FAILURE
fests with the builder or homeowner/occupler.
Gee
fan
a
B,Sc., (Civil) RPEQ #4425
Design Company SIA Builder
STA CONSULTING ENGINEERS 4
Suite 1, 848 Boundary Rd, Richlands, Qld, 4077 CONSULTING Bob & Sheryl Hedges
ACN 129 441890 Fax (07) 33759299 Ph.3363 8181 ENGINEERS PO Box 6354, St Lucia Qk 4067
TEST SITE@1 TEST SITE@-2
TYSAND
(Grey)
Motst & Loose
(Grey)
Organics Encountered (Tree Roots)
(Grey)
Moist & Loose to Medium Dense
ENO (Hand Auger)
Dynamic Cone Penetrometer
Allowable Bearing Capacity (kPa)
Pocket Penetrometer Strength (kPa)
Unable to Penetrate
Slope Direction
Test Methods: AS1289 3.1.2 (liquid Fimit), 3.4,1(near shrinkage), 7.1. 1{shrink-swell)
Builders Client
NIA
Client Order Number: N/A
Page 9
Laboratory Test Results
TEST SITE @3 TEST SITE @4
* °
Pomarsm fee |
{Orange/Grey)
a
{OrangetGrey)
tOrangeiGrey) Y's Range
Moist & Medium Dense
Wolste tedaum Dense Dynamic Cone Penetrometer
Allowable Bearing Capacity (kP3)
PP: Pocket Penetrometer Strength (kPa)
UL.P: Unable to Penatrate
— > Slope Direction
Test Methods: AS 1289 3.1.2 (liquid bmi), 3.4. (linear shrinkage), 7.1. {(shrink-swell
{Orange/Grey)
Molst & Medium Dense
Site Sketch (Not to Scafe)
{Orange/Grey}
Moist & Medium Dense
END {Power Auger)
Easement
Dynamic Cona Penetrometér
Allowable Bearing Capacity (kPa)
Pocket Penetromater Strength (kPa)
Unable to Panatrate
Slope Direction
‘Sewar Manhole
Test Methods: AS1289 3.1.2 (liquid fimit), 3,4. (linear shrinkage), 7.1. 1(shrink-swell)
LOT 23 WHALE DRIVE SUNSHINE BEACH
Design Company Builder Builders Client
STA CONSULTING ENGINEERS Bob & Sheryl Hedges NIA
it indary Rd, Richlands, Qid, 4077 ° “ .
SN 1 Be ant 890 Fax (07) 33759280 Ph 3363 8181 ENGINGERS PO Box 6354, StLucia Qld 4067 Client Order Number: N/A
Page 10
Note : It is the builders responsibility to
accurately locate and mark the position
of the existing sewer line prior to any
excavetian.
Where conditions on site differ from
those Indicated in this report, Solttest
Australia Engineering Services Pty Ltd
is ta be notified prior to construction
‘The foundations have been designed
to place no additional surcharge on
the existing sewer line.
Soiltest Australia Engineering Services
Pty Lid takes no responsibitity for
the accuracy of the supplied
@s-constructed information,
Footing piers to be founded
200mm below the zane of
inftuence of the existing sewer
& stormwater Ene,
(refer structural detats by
STA Consuting Engineers
feb 0 91485);
Piers to be founded 300mm below the
zone of influence of the propoced rll
Ealliiit
Ut
po UE
Retaining Wat
Footing
below ha zone of intuarce
of the propased poo!
(roter detat page
sa
SLAB PIERS
1200x1200 Piece OF Stab
Fabric, 38 Top Cover
;
FooTma PIERS,
Bhaded areas of the edge besm indicate where bulk of died plere will
probably be required. Piers must be located at camers of the edge beam
where applicable, including “L" intersechons and hay-windows.,
Slab Mesh, 35 Bottom
Cover In FB Areas
4
poe Sor
pe 2.0m pte 2.0m ——b}
Design Company
STA CONSULTING ENGINEERS
Suite 1, 848 Boundary Rd, Richlands, Qld, 4077
ACN 129 441890 Fax (07) 33759299 Ph.3363 8184
Builder
Bob & Shery Hedges
“ENGINEERS. PO Box 6354, St Lucia Qiks 4087
ENGINGERS
Block Retaining
Footing plese required here
to be founded 300mm below
the Invert tevel of existing
sewer tine,
{tefet cetaining well detail)
Footing Piers Required Here
to be founded 300mm below
the zone of influence of the
Minimum Depth
of Piers 2000mm
{under Edge Beam)
Footing Piers
Required Here
Footing piers required here
to be founded 300mm below:
the Invert level ot extsting:
sewer tine,
(refer retaining wat detal)
Builders Client
N/A
Client Order Number: N/A
Page 11
Slab Thickening : : Starter [email protected] ce . Stair Detail A ‘Slab Fabric N12 Vertical Bae at 0055 per AS27955 kan so, Bedding Sand Step Down Thickening ‘Slab Fabric N12 Corner Bars Stair Detail B Doweted 200m Minkrum 412 frintorcement Cover 4mm Requite a tap of 500mm Boltors ‘Slab Fabele minimasta Boren Top Cover ‘round outside comers of footing teinforcement Steel Reinforcement Product Code Steel Strength | Slab Fabric sia2 | 800 Grade | Edge Beam & Thickening Reinforcement 3L12TM 500 Grade | Reinforcement Bars & Starter Bars N12 Bar 500 Grade Concrete Strength 20MPa Note* Footing & Slab Edge must be vibrated. * Trench Mesh and steel reinforcement must have a minimum 500mm lap. * All bottom stee! must have 40mm bottom cover. Design Company SIA Builder ; es Builders Client STA CONSULTING ENGINEERS Bob & Sheryl Hedges NA Suite 1, 848 Boundary Rd, Richlands, Qld, 4077 CONSULTING 5 ACN 130 444 890. Fax (07) 33759299 Ph.3363 8184 ENGINEERS PO Box 6354, St Lucia Qld 4067 Client Order Number, NIA
Page 12
YIN JAQUINN J8pIO WALID
VIN
quay suapjing
* CL OCENYd GBEzESZeE (40) xe4 E71 EET GOL NOV
290% PID = IS "ySE9 xOa Od aoONVIVIY eeghee Ti0P “PI “spUEKENY PY ATEPUROG BYE‘) AUNS
sadpan Vasus = dea Vis GL Aid SASIAUAS ONITINIONA VIWYLSNV 1S21710S
depuing fuedwos ub\seq
“em 24 puiyag
0S uapiaG Japun Jo “Byj06 5] je.apeW |p) Sz9yM Fem JO OPIS JOYIO ayy UO BLyoaidia}em Yersu; “Buyepuas
180 40 5]1UN 490}9 s9n0 juLed Buyeos o1q:xay @ GSN ‘ Buyjamp jo LEd sgayisee 10) poured sj yem BuIUIEION Hy °Z
“em Gujuyeras
PeOVO;UOUUN Jos SoDEds WNUK WE Pua seouds LUNIXEW Wp, 718 JUIO[ JQ;UCS ;eoRJAR @ aay Pinoys
PoMoUIEN Ayry [jem 1YH}ERS @ ‘Buyamp ayy Jo Wed wo} Jou Soop YL eM BuIUHROL YO0IKq UIE 04°
= juyOr JoszuoD
‘aBeujeip ooepns spiaad 03 saps @ 01 opeiB pus sedweD -yUaa J0 I108
$9.10K9) o1geoueduyjwas @ YIP [x2Bq OY) JO eDepNs do} ay) HO [was O} dIGusIApI ypneg yor Buisn usu *s
"Wayshs OBeLIEIp UIE a4} 0} pa}IeUUCD 8q PROYS [jem HY PUA Wa}Sks BBeUIEIP ay. “>
“Sosy IUFoRd O43 Su AranissasGoud pajiansur aq Pinoys warsks #Beup aL *f
“"Baue payypeg ay) Jo. @sn pasadaid oy UO spuadap Lonsedwco
10 powjaw pus sauBsp ay, “deep wuogz us) GoW 10U SJ9X9} UI pa}DedWOD pue pare!d sQpMOYSIPeH Z
“BuynosB Joye skop ua} 1sBay We NUN eM oy) pUIYaG paoKId aq JOU ANOUS IHPeR —“L
- eBeuyesg pue |1y49eg
“Ainjayed posn ‘sojeiqya jouad
Aouanboy ysiy & yiys Jo (Sieg pauUojap Jay} JO Sueq GuRJOjUIoJ fEdILZ9A ULEW asn jou Op) JeqQ pune UjEId
@ MM Burppou Aq 09 Ae LoyDedWiod yo] JOU Bue EpjOA jay; OS ALJENasoy) PaPEdwWed oq Pinoys nab ey, “p
“ANI 1} Siam WnWpewW eu6 o} pue VoWPQOLIEI
890 §| SILL ‘JOU 40 PaTUOJUIaL JOYIOLMA “ynosdl YW pally 8 PFIOYS SIC YY “Ee
“youd paxjwekpeas se uonesyoeds sues sy? o} Jexiu apped adfy Wrup
Bunn @ U1 AluBrosowt paqui aq prious pasn y NoUB paxwl oxs “pesn aq PNOUS EeEL OOLESY Ul UaA/O
uOReIyHeds AjqeVOM 0} jNosB paxiw-Apeal ‘eqeyers JaAQUaYM Jey) PapusUWOdA S| }] JNK Beg “Z
“sBuluado ynourep eso |
- Buynoig
fayuozyoy 19ay0d pus puog
“SJU@UI9JND@) J8A00 YIyA JUG]S}SUCD 'a\G|SSOd se SyerA
BY] JO BOR) YEG a4) 0) OSOM SB aq PINoYs ‘sueQ JeVeTs BuypNpY ‘sueq Bupuoujay jeTNEA “Nad
JO ayasouce Bune(d aiqjeg Ajaundes pan pus Ajajeino5e pavorysod ag jsnwW aWaaguEY “p
“sOupuedo
JNoUBea 6Y) NOYBNosY) BaJ0o Ly WAY PaAOCWA! oq PINOYS Suge “18s Say JePOU Ou] Jaye
Bulppas Aq 10 ‘prey ose 5yD0}q bIY Se JeYIa ‘PeAoWIa! Bq Pinoys Sazcd ey OF) VO}HDafoud JeYOYY
"uoqeDo} PAsINbaL BY) 1 ILOF |SD: Lon OY} Ly JB OW jno BUTS} Aq PaO, og UED SooydoaNY
“BugnouB s:0}a9 pasop aq jsnui
sBuiedo asoqy yUoWadIa)UIaL /eaqJaA Jo BuIA} pus Gulucn:sod Moye a} pua ‘sugsp zayJO
UB Suy seLOW Jo |anoWas yULIAd of ‘2s2N0D WHO Sy; V1 PapIAcid aq pANoYs SBUJUade jnoUE|D “4
moja) syom Buyujeras Asuosew paai9jujas 0) ajqeondde Ayeoyoods suonepUsWWEDDy
“SYBA poosojuaiun Bujpyng 10) os;}281d yeuNoU a4y Jo 334) SMCYO} oinpadoud Buxe}Yo>1g
- BuyAejyo0)g
Nios
“WUeWeRUO;LIa! BBpojsip OF ;oU GG2 SyB) “AQUeUeUUAd pesodke eq o} soRpNs AUB YsiUY }8OY POOR, “BuNeuqA
10 Bujpeds ‘Buyppoy Aq AyBnosoyy joadwo> pur ‘eys:2U0 paxiweKpeou Gulsn Aigeisjoid "aj.0U09 BuNoo) By} S2BIg “E
"PANOIU}A Gq 0} SBIOD 420K BY) 0} BALE|O! SUDIISOd ELIED GY] Uy'I}EM Oy) JO S28) 4DEq Hy WO WUUSS (SIEQ-A}
WRWERIO;UIO [TOPOA a4) 10} S1uq JPRS ay; xy AjOUTOSS "sWBIOEIP oY) UI UMOYS Sa JUSWIEDIOIWIE, BuNOD) BY ODE Z
“sjono} pus suo}suUup poymbss ay} 0} Buljoo) a9 ued “y
- sBunooy
IEMA 24} PIIng 0} MoH
-sanbjuyoay Buyeas ayeudasdde Buisn pasa oq pinoys gem iy Jo 308} WES ayy “Za}Em puncuB ayssaBBe se yons suoseai
Jauyjo Jo NOLBSDE 20} ‘AyquENb ajgenoBau e oF yem aur yBNosy saj2m Jo OBessed ayy esnpai o AessodaU palap{suas
NOILLVYLANAd YSLVM
Tea
J0 Way uy punass a1 Jo UoTEINIeES waAasd 0) Warsks BBewerp e oyy JOON ay) oBsAYIED ysnW (uIEIp UOOds “Br9) WaIshS
Buyaayoo @ ‘ase siy) ut ‘papjaaid oq Anw sojou-daam ‘gem stg so pUd ou pUuokeg sUIBIP ax) SBIBYORIP o} sIQIESod JOU S19 A
We og on Oroy-pa
48 Wesp odid jesnynouBe s9yjous opyrqud 0] Lessacau oq Amu y S15iX9 Ja}BA PUNGIG BAISS SOK GSM SASL UI JO SIEM
JayBy $0.4 WISks SSauresp soem-winys sedasd € 0) pa}eUUED 5} adid ol) esa]UN yam 24) Jo EPUD ay puUodoq Oq IE
odd 247 0) SJARNO SyL YEN 94) 50 BSEq SL 1 PaIEDEy odid peunyRoUBa snonugUED B LIMA JEM Bl Puyo Aalepausin
wuunde xeudde 50 uipya & of anes6 Bupaid Aq paaayse aq Agaajedd pinoys S14) - yyHSeq ou) UAW Wa}Shs aBaliaup y (q
“ujesp Uado ue Spuemo; padars 3q pincys aoRpNs YL,
“Aypqeauved moj Yipa |ausjeu 30 Jada] PajIEdWOD & Lay BuLaAoD Aq SuOp 9q UED SY - BDBLNS gyDeq Buyeos (a
apn.
Pinoys sdays asou, ‘payeunves Buwiooag winy (em otf PUIYAG [U¥EQ OU Iancud Of Leyes oq sdazs Jey! jeNUESSe S11)
SWALSAS J9VNIVHO 1114 OVa
“aye6ai86e aig jo voneedas inoyiyn Aaayj Moy Pinoys pue ya aIppRd Whip BUN & UI PAN 6q pINoUS 1
(eiqissod asaya joneuB papunai oq pinoys ajeBaBBy wigs)
suedZa)dn- aeBaBiy wp,
sued e- pues ENO
ved mole adn- sui] payeupAy
ued L- qwawed
~womadosd Bumoyo) 94) 98N * ais
Uo parqui s1 nas aus 4} “romxooIg Burs £0} Jey) Buvapsa uaym Ayoads ynoi6 poxjw-Apeay asn ‘aiqissod ayy
duByoas vew
$24 JOU UAIUOO JWEWAD B PUB ADUSIS}SUCD eIqeiNOd B NPA EAWOZ = IS now
A00P SPB) ANAW33INOANISY
QOSES¥ LyA couRPs0D08 UI Zy UONBOYiSseP aunsedxa Jj) egWSz = 94 SONLLOOS BLSYONOD
by PUBS “Z/4 Sur] *) PUaWED wVvLUOW
BBEL-OOLESY YIM GouEpsooze UL egWIS) sony o078
‘pajdope azam sucjesyjoeds peyayew Cuwmojo) ayy ‘saiqe; asa) Bugeynayes uy
NOILVSISIDAdS TVIM3SLVA
lou ao —— moe oes! an ceonvennd, | sgh
9 Oo qo
oF oF o
taoea wre muroeg
EEERESKEES
3 3dAL @ AdAL VAdAL
ANOID, SB UMOUY “BfaAIUOD PINY-WES YIN Pally GE $¥O0Iq AY) U} Sav0D IE PUE “AypEIUOZUCY
pue Ajeoqian paveld sieq j2a]s YM pani Wa}S BY “5490/g jo wWA}S 6 PUB “‘Bulpyis pue Burunyano sujebe:
Tem yy suOYoUE YOR aseq 87220409 paqUie) B JO JsISUCT sjjem BuIA ALOSeW seIIUCD PsasEyu
~“SHPLG ON Gor Dalolg
Page 13
WALL TYPE’ WALL TYPE "A" Suspended Stab Section [—______—Suipanded Slab as par datas a by STA Consufting Enginacre Job No. 31485, NI2.@ 400mm Crs, Longitucinad reinforcement N12 @ 400 ‘e204 pt on tap of clean-out bincks 1 $$ onginasial reinforcement Ni2s @ 400 Longixdial reinforcement N12 @ 400 © except on top of clearvout bine Lap bate min 450mm ‘SS Cove N12 @ 400em with 5 cover fv-bars) 12.9 0nes Cor N12.@ 400mm with 55 top cover (X-bars} Uap bare min ete = q= 112 @ 400m win SS cover (V-bars} = v Clearout blocks Leogtusinal rintorcement NY1Z6 & 400 wreept on top of dean-o1t blocks $12 Ot an 5 ap emer OL) ]_——— K-bars wet 55 cover i = WALLS 0.8m,1.0m or 1.2m HIGH ‘Stab wn par Foundalian Cross Section eo __* _,, WALLS OVER 1.2m and up to 1.8m HIGH B WALLS OVER 1.8m and up to 3.4m HIGH NM Base Sizes for Wall Type "A" Wat Heght % Freight of 6 r 2 " 150 Series Longtusinal misdorcement Nts € 400 F321 400m Core, Lap bace min. ¢50em Langcusdinat reintoscamane Y1Z6 @ 400 ‘oeepl on top of cleanout blocks Khare with 55 cover ‘Veber wath $5 cover Ni6 @ 200 NIG @ 200, N16 @ 20 bare wih SS cover B WALLS OVER 1.8m and up to 3.4m HIGH Design Company Builder Builders Client SOILTEST AUSTRALIA ENGINEERING SERVICES PTY LTD Bob & Sheryl Hedges WA Suite 1, 848 Boundary Rd, Richlands, Qld, 4077 RULIANCE > tin ot Order Number: NIA ACN 109 233 123 Fax (07) 33759299 Ph.1300 731523 PO Box 6354, StLucia Cid 4067
Page 14
WALL TYPE "B"
Base Sizes for Wall Type "B”
Wall Height Base Width
=
V-bars,
“ &
X-bers:
800 700 800 Ni2
1000 800 1000 N12
1200 900 1200 N12
Leongitutal rerdorcement N12 @ 400 1400 1000 4400 N12
1600 1100 1600 | N12
N2QdOome Cn, 1800 1300 1800 N12
ep bony min 45mm 2000 1400 1400 | Gao N12 N12
2200 1500 1400 | 800 N12 N12
2400 1700 1600 | 800 N16 Nt2
\Senoepcramvestects | vey 2600 1900 7600 | 1000 | N16 N16
2800 2100 1800 | 1000 | N16 N16
{vee a0) 3000 2300 2000 | 1000 N%6@200| N16 @ 200)
3200 2500 2000 | 1200 N16 @200 N16 @20
3400 2700 2000 | 1400 N16 @ 200 N16 @ 20
150 Series | 200 Series | 300 Series
Job bo 92485)
Kobors with SSem cover
bare with $5 caver
ALL BARS ARE TO BE AT 400 Ctrs. UNLESS OTHERWISE STATED
WALLS OVER 1.8m and up to 3.4m HIGH
Design Company F Buitder Builders Client
SOILTEST AUSTRALIA ENGINEERING SERVICES PTY LTD Bob & Shery! Hedges NIA
Suite 1, 848 Boundary Ra, Richlands, Qld, 4077 ance
ACN 109 233 123 Fax (07) 33759299 Ph.1300 731523
PO Box 6354, StLucia Qk 4067 Client Ordes Numbers: N/A
Page 15
WALL TYPE "C"
N12 @ 400mm Ctr. N16 in tha Top course only
x Specifications for Wall Type "C”
Legian! intranet 2 00 il [ warrear Base Wain | Base Wis | Felgit of Block FeahT of block
tinal rainfarcemer i
com vemtonmpoldemenbecs Po | spa Surcharge | PSO |
> 800 600 800
1000 700 900
1200 800 1000
1400 800 1100
TRE 4
20
=| £ ait 1600 1000 1200
12. @ 00mm Cire, 1800 1100 1400
pe 22>} |
—__3 _,] | 2000 4200 1600
2200 1400 1800
Ss 7
WALLS 0.8m,1.0m or 1.2m HIGH 2400 1500 2000 N16
150 Series Blockwork
{150 Series Blockwork) 2600 1700 2100 N20
1800 2200 N16 @ 200:
WALLS OVER 1.2m and up to 1.8m HIGH 2000 2400 N16 @ 200
(200 Series Blockwork) N20 @ 2001
N20 @ 200
ap bare min.480eam,
\ebare ith 58 cover (NIZ8 @ 400)
bare with 55 lop cover (N17 G 400)
ALL BARS ARE TO BE AT 400 Ctrs. UNLESS OTHERWISE STATED
N16 in the Top course andy
Longmusinal ceiniorcement N12 @ 600
N12 @ 400mm Cun,
Sewer Piering Detail
Longiudna! rentorcemend 2125 @ &00
‘Sreapl on top of ciean-ate blocks Retainieg wa Footing
Khare with Som cover
V-bara with 55 cover wth 5S cover Services
Footing Piers
300mm below tT
WALLS OVER 1.8m and up to 3.4m HIGH
(200 & 300 Series Blockwork)
Design Company Builder - : Builders Client
SOILTEST AUSTRALIA ENGINEERING SERVICES PTY LTD we
Suite 1, 848 Boundary Rd, Richlands, Qld, 4077 Bab & Sheryl Hedges Client Order N WA
uite 1, oundary Rd, » ONG, i tent Order Number:
ACN 109 233 123 Fax (07) 33759299 Ph, 1300 731523 PO Box 6354, StLucia Qid 4067
Page 16
WALL TYPE "D"
N1Z@ 400m Cire, t6in oe Top coure ony Specifications for Wall Type "D"
Longituctire! reinforcement N12 @ 400 Wall Height | Gase Width] Heel Widin [oase Deping
ement on top of cleanout blocks w 300 Series
Lerg@udine! reicfarcerert M12 400 kPa
Sewn Cover Iv except on lop of cleanout blocks: N12
1 N12
N12 400mm with $5 cover {V-bers} B N12
Genre tock
1400 | 1000 N12
1600 | 1100 | 350 Nis
1800 | 1300 600 Ni6
2000 | 1400 | 450 | 700 N16
2200 1500 450 700 N16
WALLS 0.8m,1,0m 2400 | 1700 | 450 | soo | 900 | 4600 N46
' 15. IGH 4 2eoo | 1900 [7450 [800 [i000 | 1600 | 1000 | Ni6
2800 2100 450 800 1000 | 1000 N16
3000 | 2300 | 600 | s00 | 1100 | 2000 | 1000 N16 @200| Nie @ 20d
WALLS OVER 1.2m and up to t.8m HIGH 3200 { 2500 600 | 1000 1200 | 2000 | 1200 N20 @ 200) N16 @ 200]
(200 Series Brockwork) d
3400 2700 600 1000 1200 2000 1400 N20 @ 200) N16 @ 201
ALL BARS ARE TO BE AT 400 Ctrs. UNLESS OTHERWISE STATED
* A kPa surcharge is equivalent ta 300mm of soit
N18 fn the Top courea only
Lorgitucire reietomcement N12 € 400
N12 @ 490nen Crna,
bap bars in Som, Sewer Piering Detail
Longitudinal reintsrcemecd 27's @) 400
‘exmap! on top ef clean-cut blocks
Retaining Wat! Footing,
Gieen-ou blocks ne
Shab Fabric ‘V-bare with 55 cover 450 Diameter Services
Footing Piers Trench
Pee IT REE
N12. 400mm Cus,
4 Bar L117 300mm below qt
sun
Ww
WALLS OVER 1.8m and up to 3.4m HIGH
(200 & 300 Series Blockwork}
Design Company F Builder Builders Client
SOILTEST AUSTRALIA ENGINEERING SERVICES PTY LTD Bob & Sheryl Hedges WA
Suite 1, 848 Soundary Rd, Richlands, Qid, 4077 ALLEANCE ” Cent Order Number: NUA
ACN 109 233 123 Fax (07) 33759289 Ph.1300 731523 PO Box 6354, St Lucia Qld 4067
Page 17
Steel Posts
‘Steel Column
Pad Footing Depth
Refer Page 1
150 (Min)
a
k——|
450 Diameter
Steel Posts
4e N12 Bars
welded to plato
RS Li 250
Pad Footing Depth ae ah 20 er
Rafer Page 1
L
450 Diameter
Design Company
STA CONSULTING ENGINEERS
Suite 1, 848 Boundary Rd, Richlands, Qid, 4077
ACN 129 441890 Fax (07) 33759299 Ph.3363 8181
SOKA Builder *
Bob & Sheryl Hedges
s
Swot N eens PO Box 6354, St Lucia Qld 4067
Project Job No, 9141
Technical Notes
Earth Works Specifications
Batter Angles for Embankments:-
{tis the budders responsibility to ensure that the site works do not undermine or place additional surcharge on any existing structures.
if this can not be achieved STA Consulting Engineers must be contacted prior to any site works being undertaken.
Batter angies must comply with toca! goverment requirements and are to conform as follows {Figure 1).
Figure 1.
Cut Embankment
Lv Fill, H tess than 2.Gm
Material Type Clay
Soft Sols
{Refer Bore Logs} Firm Clay | Soft Clay
Embankment Slopes | Compacted Fill : : 1:2 | Norsunabe
(Height Length)
Cutting : : : 1st 2:3
Note: Retaining walls or other forms of soil retaining methods must be adopted where the slope ratio is greater than that
indicated in the table above
Fill Material and Compaction:-
‘Organic material, highly reactive clays and lange racks ara not suitable for use as fill. The fill is to be spread in 1S0mm layers and extensively
track rolled with a drott. All earthworks to be carried out in accortiance with the full requzements of AS3798-1990, Guidelines tor Earthworks for
Commercial and Residential Developments.
Drainage:-
‘The external finished surface surrounding the dwelling must be drained to move surface water away from the buikling and graded to give a stope
of not less than SOmm over the first 1m away from the buikiing.
Reinforcement Specifications
‘Steel wire reinforcing fabric and bars to conform with AS 1304 - Hard Drawn Stee! Wire Reinforcing
Fabric for Concrete} and AS 1302 - Steel Reinforceing Bars For Concrete.
Lap Lengths
Trench Mesh - 500mm in a straight fine, or to the far face at “T” and "L" intersections
Steel Gars - “N" Bars - 35 times the bar diameter.
Corner Bars - sequired at all “T* and “L” intersections. Refer to the design drawings for
the appropriate construction details.
‘Slab Fabric - One full panel of the fabric, so as the two outer-most transverse wires of each sheet
are overlapped. As shown on the below detail (Figure 3).
_2daillonal width, For example a 400mm wide
200 x 100 Eage Square fooling requtan 4 bar tench mash SOG wide,
Concrete Specifications
The concrete must have a strength at 28 days of no! less than 20MP=a unless otherwise specified an tha foundation cross section, a 20mm nominal
aggregate size and have a nominal 60mm slump. Water must not be added to the mix to increase the slump to a value in excess of that specifiad,
Concrete must be placed and compactad/vibrated with good building practice. in hot and windy conditians concrete must be cured dy covering with
plastic sheeting, spraying with e liquid membrane curing campound ef ponding water on the top surface. The concrete must be manufactured to
comaly with AS3600-2001 - Concrete Structures.
Builders Client
NIA
Client Order Number: N/A
Page 18
compliance Certificate for building Design or
Specification
A Compliance Certificate states butiding work complies with the bulking assessment provisions.
To be used for ail classes of buliding and strictures to certify # material, system, method of building or building
‘element complies with the BCA or a provision of the QDC.
RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the 8CA or a provision of the GDC, A building cerfifier {Clase B} can not give a certificate regarding
QDC boundary clearance and site cover provisions,
1. Property dexeription
‘The description must identify al land the
subject of the eppfcation,
The fot & plan detals (eg. SP / RP) ere
shown on fie documents ar a rates notice,
Ith plen is not registered by title, provide
Previous fot and ptan details,
2. Description of components cestitied
Clearly describe the extent of work cavered by
this certificate.
‘Steet address Lot 23 Whale Drive, Sunshine Beach
Lot & plan detats (attach jst if necessary)
th which local goverment rea Is tho tand situated? Sunshine Coast Regional
Foundagon Design
3. Gasis of certifivetion .
Oetsil the basis for giving the certificate and the
extent to which tests, specifications, rules,
standards, codes of practice and other
publications, were relled upon,
Design Criteria
BCA - Building Code of Austratia, AS 117022002 SAA Loading Code, AS 3600-2001 Concrete Structures, SAA
828-1997 The Design of Residential Stabs and Footings, AS 2870-1996 Residential Stabs and Footings.
4, Reference documentotlon
Clearly identity any relevant documentation, ¢.g.
‘umbered atuctural engineering plans.
5, Building certifier reference number
Project Job Number 91485
Building certifier reference number -
6. Competent person deais |
A competem person for building work, means a
peraon who fs essessed by the bulking certifer
for the work as competent to practise In an
aspect of the building and specifcation design,
of the bufiding work because of the individuafs
ki, experience and qualifications In the aspect.
The competent person must atsa be ragtsterad
‘or liceraed under 8 law applying in the State to
practice the aspect.
Ina relevant Inw requires the individual ta be
Neantod or sagisternd to be able to give the
help, the certifer must mssess the individhral ms
having appropriate experience, qualifications or
‘this to be able to give the help.
I the chlef evecutive issues any quidefines for
‘ssessing o competent person, the bulging
Certiter must use the guidelines when
on.
7. Signature of competent person
This certifcate must be signed by the individual
assezeed by the building certifiet as competent,
Date received Reference Number Version form 15
1. C806
Design Company
STA CONSULTING ENGINEERS
Suite 1, 848 Boundary Rd, Richlands, Qld, 4077 CONSULTING
AGN 129441890 Fax (07) 33759299 Ph.3363 8181 ENGINGERS
Nene Ars nes Angelo===>
Company name {# applicable) -Seftest Austelte Engineering Services Pty Ltd
lancu
Phone no. business hours . Fax no.
Contact person - Angelo tana
(07) 3963 8181 NA (09 3378 9299
Emel address - admring}soitestaustrafis.com.ou
Postal adkdress - PO Box 399, Richtands, Cid 4077
cence o+ registration rarmber (f applicable) - B, Sc,. (Civ) RPEQ €4425
Voerttty that the Rem’s desorbed above, i instated or carried aut unter the certiicate, inctuding any referenced
documentation, wil Buliding Act 1078.
Signature pe Date 24/08/08
STA Builder
Bab & Sheryi Hedges
PO Box 6354, StLucia Oi 4067
Builders Client
NA
Client Order Number: N/A.
Page 19
Sewer M/H
RL 58.50
2/23
i
!
'
ELEVATION!
f
{
I
Occuplied
REFER TO WALL /
(MAINTANANCE HOLE}
«
2
4
SITE PLAN
SCALE 1:200
HARDWOOD (FORMBOARD)
PLYWOOD 25mm THICK
1.
2.
3.
@O
>
= 4,
OQ s
&
| \ Oo
Be Be, \ —
| | 1 = 6
yi y : 7.
Aly E
1
i
Lo |
is ‘ 8
ey} 9
10.
11,
} HARDWOOD 12.
; (FORMBOARD) PLYWOOD
; 2No.-25mm THICK 13.
; |
. 1
Lf----- HH te *
—_
( r
I
{s ' EXIST.
S| | IL dL MAINTANANCE
1 H = «HOLE
t——L V V
DRAIN SANDY ;
EXIST. FREE | |
2000
CONSTRUCTION PROCEDURE AND RELEVANT NOTES
MATERIAL. = § TYP. WALL ELEVATION
PROVIDE AGG. Pipe SCALE 1:100 (MAINTANANCE HOLE)
MARINE PLYWOOD
ALL PLYWOOD SHOULD BE HARDWOOD (FORMBORD) PLYWOOD, 25mm THICK, F27.
ALL PLY SHOULD BE PLACED WITH FACE GRAIN PARALLEL TO DIRECTION OF SPAN.
ALL SCREW PILES, 114.3 CHS 4.8mm THICK, GRADE 450 AT 1000mm SPACING, MINIMUM
HELIX DIAMETER, 350 AND 8.0mm THICK.
LOCATE ALL SCREW PILES AS PER STA DRAWINGS. (CONFIRM LOCATION OF
SERVICES PRIOR TO INSTALLATION OF PILES). ALL SCREW PILES FOUNDED
2000mm BELOW REQUIRED PLATFORM LEVELS.
EXCAVATE ALONG HEIGHT OF SCREW PILE TO AVAILABLE BUCKET WIDTH 450mm
AND LOCATE ACROW PROP. THIS EXCAVATION SHOULD NOT EXCEED MAX. 2600mm
LOCATE PLYWOOD HORIZONTALLY COVERING 3 SCREW PILES AT ONE INSTANCE.
REMOVE MATERIAL IN BETWEEN SCREW PILES AND PUSH PLY DOWNWARDS.
ADD ONE EXTRA PIECE AFTER FIRST ONE HAS BEEN PLACED TO A DEPTH OF 1200mm.
REPEAT REMOVAL PROCESS. TILL HEIGHT REACHES 2400mm
TAPER MATERIAL BEHIND TO SUITABLE SLOPE TO BE VERIFIED ON SITE.
BUILD BLOCK RETAINING WALL IN BETWEEN ACROW PROPS, EXPOSE HORIZONTAL
AND VERTICAL REINFORCEMENTS OF BLOCK RETAINING WALL AT ACROW PROP
LOCATIONS UPON COMPLETION OF BLOCK RETAINING WALL AND AFTER A MINIMUM
DURATION OF ONE WEEK, REMOVE ACROW PROPS. FORM UP OPEN EXPOSED
REINFORCEMENTS AND PLACE CONCRETE AS PER STA SPECIFICATION.
REPEAT PROCESS THROUGH ENTIRE SITE AS REQUIRED.
ALL WORKS TO BE INSPECTED BY STA CONSULTING ENGINEERS AT EVERY STAGE
OF CONSTRUCTION.
BUILDER TO TAKE FULL RESPONSIBILITY FOR WORKPLACE HEALTH AND SAFETY
MATTERS. BUILDER TO MONITOR SCREW PILES AND ACROW PROPS DURING THE
PERIOD OF CONSTRUCTION.
IF UNDESIRABLE CONDITIONS ARISE, STOP WORK IMMEDIATELY, PROVIDE
TEMPORARY SHORING AND CONTACT STA CONSULTING ENGINEERS IMMEDIATELY.
FIRST CONSTRUCT WALLS 1 AND 2, UPON COMPLETION OF WALLS 1 AND 2 RE-USE
SAME MATERIAL TO BUILD WALL 3 AND OTHER AREA AS REQUIRED.
CONSTRUCTION TO BE DONE IN STAGES AND AS QUICKLY AS POSSIBLE AS THE
RETAINING SYSTEM IS TEMPORARY AND SHOULD NOT BE USED AT ONE INSTANCE
FOR A PERIOD OF MORE THAN 1 MONTH OR UNTIL THE PERMANENT STRUCTURAL IS
COMPLETED.
HARDWOOD
PLYWOOD
25mm THICK
ACROW PROP
PROVIDE RESTRAINT
TO ACROW PROP USING
114.3 CHS 4.8, OR EQUIVALENT
DRIVEN MIN. 600mm INTO GROUND
114 CHS i 27mm THK
4.8 THK 9 £°9 .,
wT oO oo eT CS 0 oT
SECTION SECTION N.1.S (ILLUSTRATIVE ONLY)
TYP. WALL ELEVATION " 1100
SCALE 1:100 (W1,W2,W3) ,
SUE ISSUE DESCRIPTION ‘DATE | ORAW
2 [ ssi Fon eTRoN Seca] ae Tia Ione eee STA CONSULTING oT AEDGES STE
TEN Beech} _SSs_5_teet_ fora ss foare- as ENGINEERS | . SITE PLAN LAYOUT &
© This deawing remains the copyright ACN 129 475 449 { TYP. WALL ELEVATIONS
Of STA Consulting Engineers Pty. Ltd.
and can not be copied, wholly or partly
without the consent of the above
mentlones company.
UNIT 6, 848 BOUNDARY Rd. RIGHLANDS QLD 4077
PHONE: (07) 3363 8181 FAX:(07) 33759299
EMAIL: [email protected]
CONSULTING
ENGINEERS
PROIECT:
LOT 23 WHALE DRIVE GENS
SUNSHINE BEACH STR-0217 $01 1 1{0
DRG Roz SHEET: oF REV
a
Page 20
Biomass tea .
SEEpSAL RI
=
OVERLAND FLOW POTENTIAL <2 ee
(Per BSA Substdance Policy) ; | S382
We have inapacted the aubject ie e port of our Agproximate House sate
contouridotal wurvey and condor that ia . k Cepnection Plotted BEBE
ah A282
Inoyon matured by 2 cutasy ques wget, 4 Aro te Ob Geom | arse Contour & Feature Survey ©)
‘ mB, RaSae
f
: 9 *
ZX NORTH POINT WARNING sti 55 f * Ele g
The north pon! shawn relates lo the subject eurvey plan. existing 4505 , fa 3
‘The user should ensure this is guilable fos their purpote. axel AT RAMP: = a
, . House W/A NDING —_f 7 i Ss
22 Timber Timber wee Vers
ge 83 Fence Feneg,on Ze \ SM Fe Noe an
a3 eS Retaining m2 9438] &, 2P 7 RET—WALL Bea Bunda Roa RICHLAND, OLD 17
ERX gee ghd? Be wall O, Ae pe if MAX HT 120mm sae Fe
iz ‘ 3 b—— i
400001. Rig EP ® \ ie s @ LOT 23 on RP 865301
WATER TANK \Qiar> 4 | Fi
ES xSaM ° e in 2 Whale Drive
y Eg - ~ RE 1-% i = Sunshine Beach
wa O? | —“ Suburb in
ey = , F | QO LoalAath __ Noosa Shire Council
v1 PROPORED DRIVEWAY
it : o ; yb
Pap | | g000 5 3 = Path Weyba
FD ae 56.02 Ie —H {Tel ‘S| jo, © County March
Zz J | © il és | ji | | g 5 4 x vBdre! SCO RIS Nea _643m2
. . 9} -— J — i 8 % SF = Services
> ® ef | Fst FLOOR PLATFOR fe ag = ; Underground
S e | LEVEL 59.020 BASEVENT FL i; 3 ° ower Ql
3s Ee <a, | @ | SLAB LEVEY 56.27 PLATFORM ! 8 o Phone Under ground
a “oy Rep A | | KE VES AsO & -RET—WALL Water To be determined
59/860 Ibi] «| norco! § i | 3 MAX HT 100mm Senorage Yes
POOL FENCE: | all | % LEVEL 59.31 a + E t
Pi SRD fLOOR //™ | 4 ly ¢ y Stormwater Fron!
° a | { ue &, “ 2 Road Bitumen
|| / LEVE}/ 62.200 a I a. “top L 3 of —__ ant
RET-WALL- & % 2 % E & Kerb Mountable
MAX HT | -4- i RIS oO, es *, F ——_—_
1700mm g | Bis Rie 6 é —_te Footpath Nil
4 ]/ rf BU ae 8 ee & NOTES ee
> . oO This plan has been prepared trom fld suvey fad «
| BAL 56.02) \> S g e SERVICES ALERT won he ghee Sn
PROPOSED | eS j= 2 e : | esgorebiy ekaaten s eoparaea vba eco poe! om kia Sues
3. PO > e of ary non-visible ter Nonfsible services have been plotied, f avatable, trom
zs ~ TT Wee} Fel <g 4F GROUND LEVEL ALERT rownum mci aon
< g Us Se | AN pcre | | sieemeryeren en,
= x ° nes yVY y ¥ j ciovnd tava Poms ents te ofc nd to check on, the Local Authoritys definion of
$ 9 ALO VACANT WY Tor a quote or further advice, Nal Gree er cen cae
x % e : j IDENTIFICATION SURVEY fet ay
Qr > T—WALL Agi NB
3 2 A | 28/1/07 _| Origin Issus
+3 ey” _i MAX HT 800rry SITE COVERAGE ~ 407i
= rd panos fre oota tbr htc
& i quote or vice.
i 2 92 @ FD — FIELD DRAN CONNECTED Level Dat AHD Surveyed TCC
ee 3 TO ROOFWATER SYSTEM / FLOOD SEARCH ALERT, oune, —OP=0A87?. Chaced
és x 2 t chuck coun os Tood ration odeNo. _AXS8423 dale 24/11/07
a 2 a ‘ PAGE
ce 2 \ f Tea ee tutton 4+ OF 1
Om Sm 10m 15m title search tin ey aie bbipattke SCALE 1:200
tu! 1 tL ted) tk on een aoe
‘Scale 1:200 - Lengths in Metes .
»
* 7 _ Drawn: Seale:
Date: Amendment: PH - (07) 3278 9795 Rroposed Owelling: Owne TONE 1: 200 0NAS
65-09 | EASEMENT SEV/ER & STORMWATER MAIL: tlowe@igpond net au LOT 23 B&SHEDGES Job Ne:
. N . ° net WHALE DRIVE 24807-V3
QBSA LIC.- 705552 SUNSHINE BEACH Drawing Viele
: “14: : ; Date: Dwg No:
Tim Lowe Building Design ITE PLAN 6-5-2009
ones S 7
All Orawings and Designs remsin the property of the designer Tim Lowe OF Y
and are subject to the laws and protection of COPYRIGHT
I
Page 21
|
NOTES: 7090
— All dimensions shown on plans are to ‘" 3490 k 3600
the timber frame or brickwork. 5 A
Do NOT dimension by scale, if in doubt ASK. ih 20 6710 We
— & Denotes smoke detectors hard wired to 4 “I “
electrical systern to comply with BCA class 4 y
& class 10 parts 3.7.2 to AS 3786
— Opening Head Hts 2100 UNO.
Refer to Opening Manu’s Spec’s
for frame opening Ht.
d
=
=
8 GARAGE
2 * SUSPENDED
ka S| SLAB ABOVE
w
x
S
a
G
190
jy 2070 y 3650 4
*
6190 fe AREAS
un BASEMENT 71.8 m2
PORCH 2.2 m2
1ST FLOOR = 180.8 me
REFER TO SLAB PLAN SHEET No.6 VERANDAH =. 28.1. m
COMPLE RNAL DIMENSIONS. 2ND FLOOR 174.2 m2
yj FOR © Te ExTe! BALCONY 25.8 m2
{ 3RD FLOOR 57.9 m2
| TOTAL 540.8 m2
Drawn: Scale:
Date: Amendment: PH - (07) 3278 9795 Owner. 1.LOWE. 1: 100 ON AZ
MOBILE - 0410 611 493 B&S HEDGES dob Nor
EMAIL- [email protected] WHALE DRIVE 24807-V3
QBSALIC.- 705552 SUNSHINE BEACH Drawing Title: —
Date: wg No
Tim Lowe Building Design b BASEMENT FLOOR PLAN 65-2008 2 on
All Orawings and Oesigne cemsin the property of the designer Tim Lowe ol
and are subject to the laws and protection of COPYRIGHT 8
Page 22
| ann
NOTES:
=|
sea oe as Set a = +
— All dimensions shown on are to
the timber frame or brickwork. WALL k 3557 Ve 3270. k 3047 Lk 4363 L 2700 1,900 |,
Do NOT dimension by scale, if in doubt ASK. a we 4 A 35 mA A
— & Denotes smoke detectors hard wired to VER Hep Sh 2950 AG 900 2500 AK 2440 Aye
electrical system to comply with BCA class 1 70 70 ' 70 BENCH 230
& closs 10 parts 3.7.2 to AS 3786 190 Wy 4700 2350 5350 T1000 |,
—at— Aa 7
— Opening Head Hts 2100 UNO. “Al 600 A A
Refer to Opening Manu's Spec's sos
for frame opening Ht. oO
x 12x045 LV. cex'8 FX eo, op ox #4 2
Soak Se 82s Se ~ t
8 D STEPS “ o Te FC “TP Bosts a 3
4 _ ms ~LLELLL '
al 1 TL aE rte ile cEekEEHEE
Seb fo SUE] PTA gee lig SRERRELEE a] §
fi 5S (
Bes “ S KITCHEN, fis) [SQ BFAST TA “CCCEEOCE | ap
\ -CEELL 3 °
— (Bo 50 =) 5 wd BAR ccceon Re B
He oppor 8 [ GALLEY pal “cEEec—9 BN Bae
CN\ EELEEL LDY 820 8 80 UT ee Shy
5 “ - ' 3
Re CECELEE Lp 5 AN VERANDAH “iL a
2 LINEN | ar [ry 880 Qes oe io Om eure citt we 8 8
Rae Re st ae 4 : eag -CEEtttee “8
1200) ¥ ‘sy ee mt
3 wT pe a
' § “a
eee) a : --4 m SS Ny
g 2 mye & $ 230 SSD t
x06 LV- ‘
8 z 2100 HEAD iS yr @ 03x30 LV ABOVE 3
3) 8 z MEDIA nie g 7 w 8
= 8 b 38 FAMILY >". ow ag of 4 =
5 & VOD FOR 2ND FLR a ee 3 ie o s ge 8
oN 6 8 ' 3]. N =
Rae Re GS glo 720 x Sire oh at INI i Bee 3 “| 8
“ar . ROBE store fue cp + 200 HEAD. vilo. ? 3
ne a P 520x3 SR 10 8 “3 Fe TDI 1 5 Rae Bax J N
8 g & = s f LZ h3ltal nlololal 7] 6 S ROR
3 . 85] [BSgkoy 8} al o| gig
Rs © 820 og EIS a EPC / » A; Rs] Ss
I< 5 Sit KENBOPPL i] lh
2 Livi] PIANO} ALS] ¢ oP Ly tg “NS
R 8 L 8 OPT ig J 1200 ge "So ss
: _
| 9 4 BED 2 cir 8 18x045 18045 Coss AH Boe
8 Lt gel a FG G POST 8
4 LLL! &§ VoD FOR 2ND FLR ~
SENS SERVES Bah N
st oO DPT ON G NTL So I
tod $e é
2. 2.
gNU ALM AS NE = mS N
iby ST SSSR TS 12x'8 SW mu C v
es {iro
ast SW — SLIDING WINDOW
: Fi = Ban
___ 2550 “ier 30, 1200 peeve kL 4400 y 2070 0 3630 330 by = LOLNER WINDOW
i 3630 180 00 7D 000707 30/2, “so 330 w3s0_“fP m“ SSO Re TR Se ors
0A aC —af zi 7A Al BP — DOWNPPE
INSDE FACE—= 5300 Ld 3670 4470 L 3700 900 FD — FIELD GULLY
OF BLOCK 7 whso 7 A
WALL
Pr ed Dwelling: Owner: Drawn: * Scale:
Date: Amendment: PH- (on 3278 9795 ropos. ing: mn ie Ve ON AD
MOBILE - 0410 611 493 LOT 23 B&S HEDGES Job No:
EMAIL- [email protected]
WHALE DRIVE 24807-V3
QBSA LIC.- 705552 SUNSHINE BEACH Craving Tier
Tim Lowe Building Design Date: Pw No:
All Drawings and Designs remain the oe Be designer Tim Lowe FIRST FLOOR PLAN 6-5-2009 4 oF 17
and are subject to the laws and protection of COPYRIGHT
Page 23
y
700)
NOTES: # oS 133 3047 LV 4363 yp 2 +
— All dimensions shown on plans are to 670 1 3610 910 | 3 y AG 7 2%
the timber frame or brickwork. x A AI 439 A 7 0 4 LV 4105 Te
Do NOT dimension by scale, if in doubt“ASK. 30, 3130 pode 6235 4 At oo
i wm al 230
- Denotes smoke detectors hard wired to 70 \ ey 3440 Waso
Qoer system to comply with BCA class I 5 90 3520 70 6670 pe L 6470 +4 He
& class 10 parts 3.7.2 to AS 3786 ood He He 7
- ening Head Hts 2100 UNO. ee . < +
Roe ® Opening Manu’s Spec's 4 y top 230 FG | <8as ~~ +
for frame opening Ht. ‘ o® uv >
Ss ox D PACK WALL 3
rg OUT OT g S
wo
aS VENEER " 2 8) 8
iT WOH oY “| exe 3
8 (000, — 05x15 FG E VOID a BX g
5 Os 2 TANK " QI a 2
tC MAN 4 2x8 T ' o z e
Rg a & 8] BAR 8 ! = 486
8 t | 2
S g [ | BB Gy) 25 > i: 2
g la Qle 4 So stlircer |
g - &S— wi omer 4 : ae recceett ts
8 ™ js | - co g
q Rg \BY pack wau—! GENS _ sa ql EEEEECE | Joe g
8 VENER worH | {PT can ECECeee Sg
sod gS TO TANK VENEER WOTH | a S | al -CEEEEET |
>» O. 9. 2°. . . ‘ ——Hidt ase
BAe NRA BARE Pace eet (Ma) ¢ pat ——-.-----~-~ 2570 ee 1 100SHS Rae | S55
1|§ sme tO w. Q_. Bel =BACK WALL
3 a g Q BI) 5 | OUTOT ||| Post
> ee e | ‘ge g | VENEER WOTH g 3
g 8 [88 e | (es UPPER dee Ot G1 Rekod Coing I + Bolg
. “| 8 r ly LIVING el Ste 4||8} BALCONY & g 3
g * wo 5 B B cttceee 9
is ee y OE pai =eceee. 5
ese - ®=—90SHS POST or) 8 BED 1 a cere {a ade
Foo. bet pUPs| soser j EEELLLL |
a 8 [CECH VENT 3 _ g a , Lt! . 4 ; ge
eas POOL es RR CL 820 4g cI em) | gs & °
8 g PATIO ELAR Ro Cf “UF eNe rb 12 ig
eg ener f _ Bly 7ee 08 l sf BSR aL s
HT TO SUT: ran -u f ©.
RAR POWER GELNG Hi | Se “18; cl Loo] === om | <t a 9
es = Cli Ad; “Mls —- a 7-7 3 m
SOF o if me CWS gee ‘J
Ss Ai BENCH hi w gf
Pp as
3 N 0 | ofS (y WI R x06 _ ru 4
N — Ot —_——_—
RWSSM [aear SEAT i at
XR Sak = wo 8
g pee AAS | Ebb DV ~~ ~~ ede sl
“jal * 9 BBQ AREA Fal
“ ° BB [2] “ : SW — SLIDING WINDOW
J = — DH — DOUBLE. HUNG
Be ~ “~ orl” 1200 HGH BLOCKWALL \ oo 00 FG = FED GASS W
350 70 440 - DOOR
719507 00 7p 1660 ‘p 3600 # 4400 He 3 — Hi 60 2 = StONG Ree DOORS
70 qo a a i ves “2 165 2 oF = DOWNPFE
$0 3520 1000 ‘\p, 5000 4 fA FD — FELD GULLY
i Al
6370 y '
L 3610 k 7 } 2700 bY
4470 14000 |
vv 480 “0 3120 9 1360 y 5250 e 270 + A A 2 Drawn: Scale:
He AC Al A ~ Owner LOWE 1: OOONAS
795 . oes GES Jab No:
: PH - (07) 32789 GE: :
a aeaer MOBLE» O«10 6 493 LOT:23 B& SHED 24807-V3
EMAIL- [email protected] WHALE DRIVE
QBSA LIC.- 705552 SUNSHINE BEACH Drawing Tite: PLAN ina is a
i ildi i ND FLOOR OF 17
Tim Lowe Building Design SECO
ino ciara sulgeet ca the laws one protection of COPTRIGHT ‘
Page 24
3370 2130 10880 v 4140 3370 70 1800 Py NN s| & Bl} - g Rar By i a le | > | © Le o WAY Ec alk a 2. 8, 3s | = 0 Lo QE rm | Ss g g| 8 0 CL qe ta | _ | Py ce fn an ° oe “cE WIR \ 8 S. if 8 vAl\N BPN =f | sk | oor 720 bt 720 ao | @&e Se FE Lo | T | la é | al ¢ I 29) oo | m “ 1g BED 3 3 | be | oT wd eke Boab NOTES: — All dimensions shown on plans are to the timber frame or brickwork. Do NOT dimension by scale, if in doubt ASK. — & Denotes smoke detectors hard wired to electrical systern to comply with BCA class 1 & class 10 parts 3.7.2 to AS 3786 ~ Opening Head Hts 2100 UNO. Refer to Opening Manu’s Spec's for frame opening Ht. SW ~ SLIDING WINDOW LV — LOUVER WINDOW FG — FIXED GLASS Al DP — DOWNPIPE 1870 3300 1450 MH — MANHOLE Le 6420 Ly A A , Proposed Dwelling: rn irenwn: le: Date: Amendment: PH - (07) 3278 9795 i % Owne LOWE on MOBILE - O410 611 493 EMAIL- [email protected] WAS DRIVE B & S HEDGES oP No: QBSA LIC.- 705552 SUNSHINE BEACH Gag Tee 24607-VS Tim Lowe Building Design Date: Dwg Nez ts rags ke en opr ese THIRD FLOOR PLAN es2008 5 cen and are subject to the lawe and protection of COPYRIGHT
Page 25
eee
ghee ere
me [ve ee
\ 24290 +
® 1480 90 3520 [880 |, 3747 L 3473 3047 L 4363 y 3600 y
“i A 7 7| 7 A 7|
Loutsoe FACE
OF BLOCK WALL wae
PERIMETER BRICKED-UP
os op BASE. TO ENGINEERS 7 “Ss *
3 DETALS BI. 5
° OAL...
Sl N a — IS ‘a! 5
“s Bee WATER TANK 90 |
g SLAB TO a: a ‘Sy lkK——LINE_ OF BLOCKWORK
s MANU'S SPEC’S 4 |: N EDGE
NM & SL 59 ye 8
a> — 3
. ah | Jo 400SHS POST
| S SR LOAD-BEARING POINT
9 5 ED . ONTO S/S
8 is | # B
FOOTING ES 3) DOT HATCH INDICATES
So & SUSPENDED SLAB ABOVE
aN S : ° an TO ENGINEE!
Sa (8) S po : ge o
| t 1ST FLOOR © — — —.—_ 5
| y | an 40 SL 56.270 ° > 00 Ne
. 8 | | STEPDOWN SLAB AND FOOTINGS B POOWN 8
‘ "9 UNE OF SLAB EDGE | | TO ENGINEERS DETAILS co) Jue BASE! FLOOA F g
3 l2 (I Zu { SL 53.650 % 8 z
” IB H ge 3 Ao ' 3 . 20 HL OCKWORK, WALL 2
, aN5 (3) (@)}+——90SHS ln 2a = EDGE n
POSTS | ir .
| | isi
19 1
. | a | Z F g +
; . "ies Pe
ey $9060 | (is g |] 96.240 8 5
wt 1rWMWpo °
4 hoall | 5300 , ra=kK==- es _ g Ae
. I \ A I PERMETER BRICKED—UP °
| | ||| Q]_ BASE TO ENGNEERS DETALS g
835 (2) ©) jel LINE OF oI? 1450 3450 -
| —_— —_—— a
| SLAB - N =
| } EDGE | [ v g
Lo 2
2 b————4-————— 3 LINE. OF ML
2 SS BRICKWORK EDGE n
S g a e200 90 g PL 56.020 4
)
8 (QS (3) EXTENT MAY BE DETERMNED ONS! ‘ °
oy, “2700 __ 44/220
SL - SLAB LEVEL
$2. 1480 ye 3120 $2 +360 SP 5230 Le 3670 L 4470 # 3700 2 PL — PLATFORM LEVEL
wl ‘ 7 24290 ' 4
Oste: ndment: Proposed Boeing Owner: Drawn: feale owas
se | Amen PH - (07) 3278 9795 - LOWE ‘
MOBILE - 0410 611 493 LOT 23 B&S HEDGES so? No:
EMAIL- [email protected] WHALE DRIVE 2PABOT-V4
QBSA LIC.- 705552 SUNSHINE BEACH Drawing Title: =
. Date: 'g No:
Tim Lowe Building Design SLAB PLAN 6-5-2009 6
All Drawings and Designs remain the property of the designer Tim Lowe OF 17
and are subject to the laws and protection of COPYRIGHT .
Page 26
2590
PANEL CLADDING
RENDERED FINNISH AS
PER BRICKWORK
ATED ALUMNUM
BATTEN FEATURES 450
ALUMINIUM FRAMED WINDOWS
AND SLIDING DOORS
FRONT ELEVATION
FINSH TO
BLOCK AND BRICKWORK
NGL - NATURAL GROUND LINE
Amendment:
Proposed Owelling: Owner Drawn: Scale:
PH - (07) 3278 9795 3 T.LOWE. 1: 1000NA3
MOBILE - O410 G11 49. 7
EMAIL- [email protected] ores DEIVE B& S HEDGES vob Nox
QBSA LIC,- 705552 SUNSHINE BEACH Brant Fe 24607-VS
Tim Lowe Building Design Data Dwg Nei
All Drawings and Oesigns remain the property & the ee Lowe E L EVAT] O N 5 6-5-2009 7
‘and ara subject to the laws and protection of COPYRIGHT OF 17
Page 27
_— — poe — — a — 450 _— — 450 450 IK —_— -—COLORBOND ROOFING AN g _ _- See * os TUTTTUTTTVONTTTTTMVITUTTIVU YH NDODOODU DUT UcONU TOTO OOOO TTUTTTUTUTUUT 62.200 ee HAE pe _-— “GLASS BALUSTRADE SS _aT 8 g 8 R WY LEW |W 59.310 eee - walle ojo... ----2---- eb -----------b--4------ 2 Tf nn TPIT pt Torre 59.060 2 ° Xx \ \ \ 56.270 . X | \ —— oe vJ| — "56020 | | ee R.H.SIDE ELEVATION 54.500 | | ‘ | me —_- eS tooo LL 4 NGL GARAGE NGL. — NATURAL GROUND LINE 8.0 HT — 8.0m HT LINE PARALLEL TO NGL cae _| renee . PH - (07) 3278 9798 Proposed Owes one TOME oP 00 ON AB y MOBILE - O410 611 495 LOT 23 B&S HEDGES web Wo: in EMAIL- [email protected] WHALE DRIVE 24807-V5 an QBSA LIC.- 705552 SUNSHINE BEACH Drawing Tile: Tim Lowe Building Design a orate All Drawings and Oesigns Cor inn Potente towe ELEVATIONS e208 & OF and are subject to the tawe and protection of COPYRIGHT
Page 28
ORBOND ROOFING
TO MANU'S SPEC’S
600
~~ AW
™—
—
—
CEILING INSULA —
TO R2.2 min
PREFABRICATED ROOF TRUSSES
@ 600 CTRS TO MANU'S SPEC'S
EXTERNAL WALL. —
INSULATION TO RLO min —
—
~~
9OSHS POST —
JOISTS @ 450 CTRS >
BY ENG
POOL
PATIO
UPPER
LIVING
2840 300
BALCONY
~———GLASS._ BALUSTRADE
min HT 1M ABOVE FINISHED
FLOOR LEVEL
JOISTS @ 450 CTRS
NGL BY ENG
WATERPROOF DECK
TO BE TILED
g DINING
8
SLAB AND FOOTINGS
TO ENGINEERS DETALS SUSPENDED SLAB TO
ENGINEERS DETAILS
BLOCKWORK RETAINNG WALLS GARAGE
SECTION A TO ENGINEERS DETAILS
8 53.400
BRACING, FRAMING AND TIEDOWN
TO ENGINEERS DETALS
NGL ~ NATURAL GROUND LINE
8.0 HT — 8.0m HT LINE PARALLEL TO NGL
. Proposed Owelling: Owner: awn: ale:
Amendment PH - (07) 3278 9795 ‘opened Qweling Tome. FT NOOON AS
MOBILE - 0410 611 493 -
EMAIL- [email protected] LOT 23 6 & 5 HEDGES Jen Nes
WHALE DRIVE 24807-V4
QBSA LIC.- 705552 SUNSHINE BEACH Drawing Tides
Tim Lowe Building Design SECTION A ve 008 Pra Ne
At Orawings and Designs remain the praperty of the designer Tim Lowe 1 1 oF
and are subject to the laws and protection of COPYRIGHT
Page 29
a 2 4 eB * ne eat ~~ — — ed — — ~ — = a ~~ _8.0 HT aed ~ — ~~ = r—-PREFABRICATED ROOF TRUSSES —_ #59 @ 600 CTRS TO MANU'S SPEC'S CEILING INSULATION “—— ~£50 ky TO R2.2 min ~ — — — - EI so Tr. 1 Tf. I ~ if ~~ ~~ PoE as 3 1.0 min BAR & - STU0Y & VOID BALCONY NGL 59.310 59.060 LY Luosts @ 450]CTRS 8 pe c GALLEY ¢ KITCHEN VERANDAH & L | . oy 56.270 & 3 56.240 8 “ s. SK. ” I | LI oe on SUSPENDED SLAB TO ye g g ENGINEERS DETAILS BLOCKWORK RETAINNG WALLS als AGE TO ENGINEERS DETAILS 53.650 | SECTION B | St LY 9 LI 53.400 BRACING, FRAMING AND TIEDOWN N TO ENGINEERS DETAILS NGL — NATURAL GROUND LINE 8.0 HT — 80m HT LINE PARALLEL TO NGL ater ne: Proposed Owelling: Owner, Drawn: Scale: Date: Amendment: PH - (07) 3278 9796 po: ing: T.LOWE 1: 100ONAS MOBILE - 0410 611 493 LOT 23 B& S HEDGES Job No: EMAIL- [email protected] WHALE DRIVE P4807-V3 QBSA LIC.- 705552 SUNSHINE BEACH Drawing Tithe: os Date: 'g Mo: Tim Lowe Building Design 6-5-2009 All Orawinge and Designs remain the property of the ooer Lowe SECT! ON B i 2 OF 17 and are subject to the laws and protection of COPYRIGHT
Page 30
PREFABRICATED ROOF TRUSSES @ 600 CTRS TO MANU'S SPEC'S 8.0 HT —_— — — OO 600 450 600 0 HT KK Kt — * —_— 4 6 Pe, a g g 50 BED 3 8 ENS BED 2 N cee TTS LATION | g 82.200 ee - TO R2.2 min “| Bh Tt PITCH HT 5 ale the ev " k———-9OSHS ANGLED WALL EXTERNAL WALL 2 2 POOL POSTS : WR & UPPER STUDY g PATIO INSULATION TO R10 min B LIVING | 59.310 | 59.060 t NGL , 8 LJosts @ 450 CTRS BLOCKWORK RETAINNG WALLS——s BY ENG TO ENGINEERS DETALS 9 tT SECTION C NOL “) BED 2 MEDIA LDY 56.270 = Lb6.020L] g Lap AND FOOTINGS O N TO ENGNEERS DETAILS BRACING, FRAMNG AND TIEDOWN TO ENGINEERS DETALS SECTION D NGL — NATURAL GROUND LINE 8.0 HT — 8.0m HT LINE PARALLEL TO NGL ‘roposed Owelling: Owner: Drawn: cale: Date: | Amendment: PH - (07) 3278 9795 Proposed Owen SLOW TOO ON AS MOBILE - 0410 61i 493 LOT 23 B&S HEDGES Job No: EMAIL- [email protected] WHALE DRIVE 24307 V3 QBSA LIC.- 705552 SUNSHINE BEACH Drawing Title Tim Lowe Building Design Date Dug No: All Drawings and Designs remain the property of the designer Tim Lowe SECTIONS C & D 6-5-2009 13 or” ard are subject to the laws and protection of COPYRIGHT
Page 31
ae ee PREFABRICATED ROOF TRUSSES @ 600 CTRS TO MANUS SPEC’S ee COLORBOND ROOFING a MANU" —_—— : _ Bode ——|—1O MANUS SPECS. ; r 4h0 HT __| if L Ady 450 | _ _— BOHT _45a— — alee Ay mF a 6 jer [eee Os, —_ 6 eS NT ile g 8 g ie) 8 aq oO Q ENS BAR & 4+—EXTERNAL WALL 3 volo N INSULATION TO - ] RLO min 59.310 3 3 8 GALLEY orkor PIANO 1 FAMIL z ENTRY | FAMIL ake 6S KK NG, fq 56.270 _ 56.270 f =~ = 56020 Ly oe LT s6020 56.020 L__suspennep SLAB TO & 3 Lan AND FOOTINGS Q ENGINEERS DETAILS ne TO ENGINEERS DETALS = o oy NGL GARAGE 3 SECTION E BLOCKWORK RETAINNG WALLS 53.650 TO ENGINEERS DETALS L| LY as 6 BRACING, FRAMNG AND TEDOWN SECTION F “ TO ENGINEERS DETAILS NGL — NATURAL GROUND LINE 8.0 HT — 8.0m HT LINE PARALLEL TO NGL Date: Amendment: Proposed Dwelling: ‘Owners Drawn: Seale: owas PH - (07) 3276 9795 TLOWE , MOBILE - 0410 611 493 LOT 24 B& S HEDGES vob No: bs EMAIL- [email protected] WHALE DRIVE 24207-V3 - QBSA LIC” 705852 SUNSHINE BEACH Drmng Tel — . . . Date: ‘g Nov Tim Lowe Building Design 6-5-2009 All Drawings and Designs remain the ne ve eam SECTIONS E&F 14 OF 7 and are subject to the laws and protection of COPYRIGHT
Page 32
RAFTERS @ 600 CTRS TO ENGINEERS DETALS GENERAL NOTES 1, BUILDING DESIGN WIND VELOCITY TO ENGINEERS DETAILS WN ALL TIMBER FRAMNG TO COMPLY WITH AS 1684.2 (2006) THE TMBER SUPPLIER MAY VARY TIMBER FRAME DESIGN FROM SIZES SHOWN ON THESE PLANS, IF SO TIMBER SUPPLER TO PROVIDE CERTIFICATION FOR AMENDED TIMBER FRAME DESIGN - . TERMMESH (OR SIMLAR) FULL TREATMENT TO SLAB PENETRATIONS AND PREMETER TO AS 3660.1-95 5. BRICK VENEER WALL TO HAVE TIES TO TIMBER FRAME AT 600x600 CRS. a PLASTERBOARD TO WALLS (10mm) AND CEILINGS (orm UNISPAN) FIXED TO MANUFACTURERS CIFICATION. VILLABOARD TO ALL WET AREAS W.C. DOORS TO HAVE REMOVABLE HINGES. BCA PART 3.9.2. 8.0 HT RAFTERS @ 600 CTRS 7. 8. BALUSTRADES AND HANDRAILS TO COMPLY WITH 9. . SLAB AND FOOTINGS TO COMPLY WITH ENGINEERS DETAILS 10. ARTICULATION OF BRICKWORK TO ENGINEERS REPORT. TO ENGINEERS DETAILS : : aia tS INING, ‘1 " g 2 VERANDAH ig) N 2 u " LI 56.270 2 “ "$6,240 - >. gf 8 SUSPENDED SLAB TO 9 ENGNEERS DETAILS, ee EN ee nents WALLS z GARAGE = NGL 53.650 oe Pa oo N SECTION G BRAGNG, FRAMING AND TEDOWN TO ENGNEERS DETALS NGL — NATURAL GROUND LINE 8.0 HT = 80m HT LINE PARALLEL TO NGL Proposed Owelling: Owner: Drawn: Scale: Date: Amendment: PH - (07) 3278 9795 posed ne " T.LOWE 1: 1000N AB MOBILE - 0410 611 493 LOT 23 B&S HEDGES “Job Nev EMAIL- [email protected] WHALE DRIVE 24807-V3 QBSA LIC.- 705552 SUNSHINE BEACH Drawing Title: Tim Lowe Building Design on mon All Drawings and Designa remain the property of the deslaner Tim Lowe 2 ECTI 0 N G & NOTES 52009 1 5 OF 17 and are aubject to the laws and protection of COPYRIGHT
Used in these records
08/1546 - Additional information as requested - Dwelling & retaining Walls [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.