Note : It is the builders responsibility to
accurately locate and mark the position
of the existing sewer line prior to any
excavetian.

Where conditions on site differ from
those Indicated in this report, Solttest
Australia Engineering Services Pty Ltd
is ta be notified prior to construction
‘The foundations have been designed
to place no additional surcharge on

the existing sewer line.

Soiltest Australia Engineering Services
Pty Lid takes no responsibitity for

the accuracy of the supplied
@s-constructed information,

Footing piers to be founded
200mm below the zane of
inftuence of the existing sewer
& stormwater Ene,

(refer structural detats by
STA Consuting Engineers
feb 0 91485);

Piers to be founded 300mm below the
zone of influence of the propoced rll

Ealliiit
Ut
po UE

Retaining Wat
Footing

below ha zone of intuarce

of the propased poo!
(roter detat page
sa

SLAB PIERS

1200x1200 Piece OF Stab
Fabric, 38 Top Cover
;

FooTma PIERS,
Bhaded areas of the edge besm indicate where bulk of died plere will
probably be required. Piers must be located at camers of the edge beam
where applicable, including “L" intersechons and hay-windows.,

Slab Mesh, 35 Bottom
Cover In FB Areas
4

poe Sor
pe 2.0m pte 2.0m ——b}

Design Company

STA CONSULTING ENGINEERS

Suite 1, 848 Boundary Rd, Richlands, Qld, 4077

ACN 129 441890 Fax (07) 33759299 Ph.3363 8184

Builder
Bob & Shery Hedges

“ENGINEERS. PO Box 6354, St Lucia Qiks 4087

ENGINGERS

Block Retaining

Footing plese required here
to be founded 300mm below
the Invert tevel of existing
sewer tine,

{tefet cetaining well detail)

Footing Piers Required Here
to be founded 300mm below
the zone of influence of the

Minimum Depth
of Piers 2000mm
{under Edge Beam)

Footing Piers
Required Here

Footing piers required here
to be founded 300mm below:
the Invert level ot extsting:
sewer tine,

(refer retaining wat detal)

 

 

 

 

 

Builders Client
N/A
Client Order Number: N/A

 

 

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1546 - Additional information as requested - Dwelling & retaining Walls [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.