Council archive · source document
08/1546 - Additional information as requested - Dwelling & retaining Walls [As Published] · 132008.1546
Land Development 2. There is uncertainty whether the proposed fence along the easement may be located within the zone of influence of the stormwater pipe. The plans indicate the approximate stormwater line location only. An accurate location in the form of a long section and cross section of the stormwater line invert in relation to existing and finished surface levels is required to ensure Structures will not be located within the zone of influence of the stormwater infrastructure. For the purposes of this request, the zone of influence is identified as the area within a 45-degree angle measured from the invert of the stormwater line to the finished surface level. 3. Land Development officers are concerned that stormwater overflow will pond in the courtyard encompassed by the block fence at the southeast and western corners of the property. Please provide a preliminary drainage plan to demonstrate that water will not pond in the courtyard areas. 4. Land Development officers are concerned that slumping of excavated areas may occur during and post construction, Please provide a site-specific geo-technical report prepared by a registered professional engineer (RPEQ) that identifies methods of stabilising all excavated areas during and post construction. Under the provisions of the Integrated Planning Act 1997, you have three options available in response to this Information Request. You may give the assessment manager (in this instance Council) and each referral agency (if any): 1. all of the information requested; or 2. part of the information requested together with a letter asking the assessment manager and each referral agency .to proceed with the assessment of the application; or 3. a letter: (i) stating that you do not intend to supply any of the information requested; and (ii) asking the assessment manager and each referral agency to proceed with the assessment of the application. Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to respond to any information request within 12 months of the request or otherwise, the application lapses. A response to the above is required to be submitted, prior to further assessment of the application. If any further matters arise as part of assessment of this application, you will be advised accordingly. Council prefers that all the information requested be submitted as one package. A preliminary assessment only of the application has been undertaken and during the formal decision stage, or as a result of public exhibition, other matters may arise. You are requested to advise your client directly regarding this request. Information on the status of development applications may be viewed using PD Online, which is accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qid.gov.au . Using the "Quick Links" on the left hand side of the screen, users may select "PD Online” by clicking on it, which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users may click on "agree" if they agree and can enter either the development application number, or the address of the property to start viewing information on it on the application. Should you have any further queries in relation to the above, please do not hesitate to contact me on the above number. , celle ED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1546 - Additional information as requested - Dwelling & retaining Walls [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.