4. TREE PROTECTION MANAGEMENT PROPOSAL:
The information within the tree protection plan gives details which are to be followed during
the development of the site. The tree protection plan refers to the Australian Standard, AS
4970 -
2009 Protection of trees on development sites, and to industry guidelines and best
practice.
The aim of the tree protection plan is to ensure that all trees identified for retention are
retained for longevity within reason of typical stability and healthy condition in location within
the new development construction site.
All tree that are to be retained on site will be monitored and managed to the following
guidelines and!
4.1. Site Induction & Awareness Briefings
TREE FIX is to liaise with a designated onsite foremen/supervisor from the construction
company to insure that the Tree Protection Plan is adhered to in Arborist absence from site.
The workers and respected contractors on the site are to be made aware of the Tree
Protection Plan by the main contractor prior to commencing works.
4.2. Tree Protection Zone Marking, Fencing and Signage Needs
Prior to any works commencing on the site the Tree Protection Fence (TPF), shall be
installed with appropriate listed materials or marked at as listed radius from trees between
chainage points, in the presence of TREE FIX in guided by the Australian Standard, AS 4970
-
2009 Protection of Trees on Development Sites. The location of the Line marking paint or
fence is to be agreed with TREE FIX and will follow guidelines as required set out in "Tree
Protection FencIng".
4.3. TPZ and SRZ calculations
All trees require a Tree Protection Zone has been determined by stem calculations. However
TREE FIX may designate encroachment zone as guided by AS4970 and or determine is
appropriate natural protections.
4.4. During Construction Access
Access to the TPZ is prohibited or restricted to those with permission. (permissions granted
to Liam Haynes). The site Project Arborist, TREE FIX is required to attend the site when
works are to be undertaken which may affect trees or the roots which are being protected by
the TPZ. TREE FIX shall oversee, advice and assist as and where required. Details of any
works carried out are to be recorded by TREE FIX and made available upon request.
Site Monitoring -
TREE FIX will carry out and record regular inspections of the site
incorporating the following to be added to the certification:
. The trees within the TPZ, and record any observation, e.g. Leaves becoming
discoloured if unseasonable, dieback in the canopy, splits in bark, etc.
. The TPZ fence to ensure that it remains in the correct position. If changes or defects
are noted these are to be recorded, the site foreman/ supervisor notified and the
changes or defects rectified as soon as possible.
. Impacts which may arise from construction.
.
Landscaping compliance with the TPZ.
.
Any rectification / remedial action which may be required at any stage is done so as
specified by TREE FIX.
Tree F-.x TPMP2130610 Callaghan & Toth Lake MacDonald Dnve Cooroy Page 3- of 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request REC13/0095Related documentApplication case desk ↗
About this file
- File size
- 46.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.