Response to information request REC13/0095
Very large file (46.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LEGEND: WATER RETICULATION REFERENCE DRAWINGS
MWD 310 THRUST BLOCK DETAILS Callaghan & Toth
fiRE HYDRANT AND MARKERS
’0.,> MWD 320 HYDRANT & VALVE INSTALLATION
. Civil, Environmental &
TO STD DRC MWD 320 &I 365
~~~
MWD 355 STANDARD DOMESTIC WATER CONNECTION (NO SKEW CONDUITS PERMITIEO) Hydraulic Engineers
E APPROXIt.4ATE FUTURE ELECTRiCAl MWD 365 HYDRANT & VALVE MARKER INSTALLATION PO BOX 2305
PILI.J\R LOCATION
WAT 1201 EMBEDMENT & TRENCH FILL TYPICAL ARRANAGEMENT NooSA HEADS 4567
I 8/41 Sunshine Beach Rood
WAT 1202 STANDARD EMBEDMENT ALL PIPES "
150\1 - NEW PV-O PNI6 SN10 150 OIA -==- ~ Phone 54749081, Fox 54749041
WATER MAIN www.calloghanandlolh.com.au
WATER SERVICE LOCATION TO datum AIlD DERMD
’W
STO ORG MWD 355
PSM 178243
NEW 100 DIA WATER CONDUIT Origin (8.M.) Rl 108.138
TO STD DRC 355
NEW ELECTRICAl CONDUIT
UNITYWATER TO DISCONNECT
o roved
TO STD DRC SEa R-l00 EXISTING WATERMAIN &I JOIN TO
SURVEYED BY
150 END WITH LONG GIBAULT
-----
E E -----
PROPOSED UNDERGROUND WAX WAlTERSION a: ASSOCIATES
POWER LOCATION PHONE 54 426 121
LOT 1
UELE EXISTING UNDERGROUND
POWER LOCATION
RP173883 II project
FILL FOOTPATH EDGE TO BOUNDAAY
N PROPOSED 3 LOT
SUBOMSION AT 55 LAKE
& TTER DOWN AT 1:3 TURF
ROAD RESERVE DISTURBED AREAS II MacDONAlD ORNE COOROY
~ Clienl
~
~
:;L V EV PlY LTD
\~
\\3- LOT 11
\ title
\
WATER RETlCULAllON LAYOUT
\ PlAN
\
\
, 17/ J LOT 136 on MCH978
WATER NOTES Parish of TEWANTlN
1. PIPE MATERIAlS County of MARCH
0) l00mm -
150mm (inclusive)-
SUNSHINE COAST COUNCIL
To be constructed in:
LOT 12 0"
i) PVC-O PN16 SN10 AS/NZS~Hl (lnt) 1996,
-
locality of LAKE MacDONAlD
Series 2 PN 16 rubber ring joint;
b) 200mm &I ABOVE
i) DICL (AS22BO) closs PNJ5 rubber ring joint pipe polyethylene (AS3680) wrapped;
2. Ductile iron pipes and cost/ductile iron fitings sholl be wrapped toped and sealed completely in
SCAlE
accordance with Tubemakers of Australia Duct~e Iron Pipeline Design Manual Third edition -
1995.
3. Minimum for moins sholl be in occordonce with the following table,
cover
o 2.5 5 7.5 10 12.5 Weten 25
unless otherwise approved by the Water &I Sewerage Copital Works Manager.
Main Nom. Dio (mm) Cover Cover Cover scole SCIlE SHOWN IS ORIGIWL DRAWING SC\l.E
Access ways/Footpoths Sudivisianal Major Roods 00 NOT SC\l.E fROI4 TliIS DRAWING
1:5OO{A3) USE ONLY OI~ENSIONS PRO’IIOID
& Nature Strips Roods
1 00-200 600 1000 1200
250-375 750 1000 1200
REVISIONS
above 375 1000 1200 1200
LOT 13
4. Reticulation moins ore to Ioid at 1.5m off property alignment unless otherwise revision details dote
directed by the Water & Sewerage Copital Works Manager. A REMOVE Ql00 LINE 08/13
BEDDING 1:1,.,
5. In coostal sand terrain no special bedding is required. In 011 other soil lypes, sand LOT 5
bedding and surround sholl be washed 5mm screenings or River Sand. For 100-200mm pipe,
o minimun of loomm bedding and loomm of sand over lhe lop of the pipe is required.
THRUST BLOCKS
6. Suitably designed concrele thrust blocks 10 MWD 320 sholl be placed on 011 tees,
bends ond dead end cops. fiLES
HYDRANTS AND VAlVES
7. Fire hydranl spacing sholl be BOrn max. and located opposite properly boundaries
and adjocenl 10 011 dead ends.
8. Hydront valves to be in accordance wilh ASJ952-1991 for DN80 spring hydrants and sholl be
fusion bonded epoxy (FBE) or thermoplastic polyamide (Rilsan Nylon 11) coated.
All fasleners ore to be 316 stainless steel.
Hydrant valves to be in accordance with Unity Water standard. FOR APPROVAL
WATER SERVICE CONNECTIONS
1,. Water connections to be in occordonce with Unity Water slandard drawings SCW350, 355 &I 360.
12. Bross plaques (marked "W") ore 10 be ploced in lhe kerb where conduits cross the kerb. Sheet lOaf 14 sheets
13. Water services’ connections to be located on allemate building lines to SEOEB meter boxes.
drawing number
WORK ON EXISTING MAINS
1225-26
14. All cut-ins and other works on existing mains to be performed by Unity Water and
actual cost including plant, Iobour and materials to be met by the developer.
dole 15th JUNE 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request REC13/0095Related documentApplication case desk ↗
About this file
- File size
- 46.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.