Noosa Heads - Calile 1

Attached to the e-mail PM Submission - S&S Chadwick - 132008.176.05.

of 1

Page text shows just the words. Original shows the document exactly as it was published.

App. Ref: 132008.176.05

As residents of 12-14 Serenity Close, we would like to express concerns regarding the above
new hotel development and the perceived impact it will have on residents.

The proposed development will be one of the largest hotels in Noosa in terms of hotel guest
volume, plus several public facilities for visitor usage, it stands to reason that the impact on
the close surrounding residential community will be very substantial.

Key issues that need to be considered and addressed ahead of approval include.

   •   Safety Issue associated with siting a large complex containing circa 500 occupants (in
       addition to local resident) within the area that has only one access point and is
       surrounded by dense bushland. Emergency evacuation plans needs to be considered.

   •   Increased parking, traffic volume, noise and resulting safety issues.
       At present, congestion in the area is already an issue and an increase in traffic activity
       throughout the day and into the evenings would be highly inappropriate for an
       existing purely residential area and materially increase the safety risk.
       Whilst we appreciate that there has been an increase in the number of parking bays
       provided within the hotel complex for guest and visitor usage, we feel that the
       planned direct public access point off Serenity Close will only encourage visitors to
       park within the street nearby, particularly in the evenings.

   •   Size and impact on site vegetation.
       Confirmation that the construction will not result in loss of the vegetation buffer
       proposed and the Service Entrance will be screened from the street and
       appropriately designed to blend into the street scape.

   •   Walking track to jetty below Serenity Close apartments.
       This pathway is located directly underneath our external living areas and is currently
       utilised by many local residents (in a respectful manner) as a walkway to the river
       and jetty structure. If this path was to be utilised by the hotel as a conduit for any
       future regular water taxi service, the increased traffic volume would have an
       extremely high impact on the privacy we enjoy on our apartment balconies. Given
       that the frontages on our apartments on Serenity Close will become more unusable
       with high traffic issues, it would be a travesty for such an additional intrusion to
       occur.

In summary we feel that a hotel development of this size with various public facilities in such
a tight residential area is excessive and a smaller scale development more appropriate.
However, should it proceed as planned, we would fully expect the Council to communicate
with our BC Chair Committee and be able to satisfactorily address all the residents’ major
areas of concern.

S & S Chadwick
Log in to download the original file

Noosa Heads - Calile 1.pdf · 121 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.