Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE · 132002.220285

of 202

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (34.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Page                           2 of 9
Work Order                     EB1009715
Client                         DUKE ENVIRONMENTAL
Project                        DE0923                                                                                                                                                                                      ALS
Analysis Holding Time Compliance
The following report summarises extraction / preparation and analysis times and compares with recommended holding times. Dates reported represent first date of extraction or analysis and precludes subsequent
dilutions and reruns. Information is also provided re the sample container (preservative) from which the analysis aliquot was taken. Elapsed period to analysis represents number of days from sampling where no

extraction r digestion is involved or period from extraction ; digestion where this is present. For composite samples, sampling date is assumed to be that of the oldest sample contributing to the composite. Sample date
for laboratory produced leachates is assumed as the completion date of the leaching process. Outliers for holding time are based on USEPA SW 846. APHA, AS and NEPM (1999). A listing of breaches is provided in
the Summary of Outliers.

Holding times for leachate        methods (excluding elutriates) vary according to the anatytes being determined on the resulting solution. For non -volatile analytes, the holding time compliance assessment compares the
leach dale. with the shortest anatyte holding time for the equivalent soil method. These soil holding times are: Organics (14 days); Mercury (28 days) & other metals (180 (lays). A recorded breach therefore does not
guarantee o breach for all non-volatile parameters.

Main      WATER
                                                                                                                                                                          Evaluation: x = Holding time breach ; - = Within holding time.
                                                                                                                                                 E. hacbOn / Preperabon                                    Analysis

                                                                                                                                  t Date extracted   Due for exbdoher     E7aluabon    Date analysed     Due fa enahsrs     Evaluaton


 Clear Plastic Bottle - Natural
   SW 1,                                                    SW 2,                                                                                                                      04-JUN-2010       09-JUN-2010
   SW 3.                                                    SW 4,
   SW5


 Clear Plastic Bottle - Natural
   SW 1,                                                    SW 2,                                                                                                                      03-JUN-2010       09-JUN-2010            3
  SW 3,                                                     SW 4,
  SW 5


 Clear Plastic Bottle - Nitric Acid; Filtered
  SW 1.                                                     SW 2,                                                                                                                     04-JUN-2010        29-NOV-2010
  SW 3,                                                     SW 4,
  SW 5,                                                     GW 1,
  GW2
EK056O: An irlonis as N by Discrete Anal)tar
 Clear Plastic Bottle - Sulphuric Acid
  SW 1,                                                      W 2,                                                   02-JUN-2010                                                       08-JUN-2010        30-JUN-2010
  SW 3,                                                     SW 4,
  SW 5,                                                     GW 1.
  GW 2


 Clear Plastic Bottle - Natural
  SW 1,                                                     SW 2,                                                   02-JUN-2010                                                       03-JUN-2010        04-JUN-2010
  SW 3,                                                     SW 4,
  SW 5,                                                     GW 1,
  GW 2




                                                                                               M                                  r

Used in these records

About this file

File size
34.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE.pdf · 34.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.