Council archive · source document
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE · 132002.220285
Very large file (34.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Page 7of8
Work Order EB1014514
Client DUKE ENVIRONMENTAL
Project DE0923 ALS
Aleb& metliodO9ep1"118
TPH Volatiles/BTEX E P080 WATER USEPA SW 846 - 8260B Water samples are directly purged prior to analysis by Capillary GC/MS and
quantification is by comparison against an established 5 point calibration curve. This method is compliant with
NEPM (1999) Schedule B(3) (Appdx. 2)
TKNITP Digestion EK061/EK067 WATER APHA 21st ed., 4500 Norg - 0; APHA 21st ed., 4500 P - H. This method is compliant with NEPM (1999) Schedule
B(3) (APpdx. 2)
Separatory Funnel Extraction of Liquids ORG14 WATER USEPA SW 846 - 3510B 500 mL to 1 L of sample is transferred to a separatory funnel and serially extracted three
times using 6OmL DCM for each extract. The resultant extracts are combined, dehydrated and concentrated for
analysis. This method is compliant with NEPM (1999) Schedule B(3) (Appdx. 2). ALS default excludes sediment
which may be resident in the container.
-------------
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLERelated documentApplication case desk ↗
About this file
- File size
- 34.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.