Council archive · source document
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE · 132002.220285
Very large file (34.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
ALS Laboratory Group
ANALYTICAL CHEMISTRY 9 TESTING SERVICES
Environmental Division ALS
SAMPLE RECEIPT NOTIFICATION (SRN)
Comprehensive Report
Work Order EB0918529
Client DUKE ENVIRONMENTAL Laboratory Environmental Division Brisbane
1 Contact
Address
MS JULIE SCHUBERT
PO BOX 78
WURTULLA QLD, AUSTRALIA 4575
Contact
Address
Tim Kilmister
32 Shand Street Stafford QLD Australia
4053
E-mail [email protected] E-mail [email protected]
Telephone +61 54933322 Telephone +61-7-3243 7222
Facsimile +61 07 54933422 Facsimile +61-7-3243 7218
Project DE0923 Page 1 of 2
Order numbs 291821
C-C-C number Quote number EB2009DUKENVO216 (BN131709)
Site Noosa Civic
Sampler SH QC Level NEPM 1999 Schedule B(3) and ALS
QCS3 requirement
Dates
Date Samples Received 24-NOV-2009 Issue Date 25-NOV-2009 13 44
Client Requested Due Date 02-DEC-2009 Scheduled Reporting Date
02-DEC-2009
Delivery Details
Mode of Delivery Carrier Temperature 5.2°C - Ice bricks present
No of coolers/boxes 1 MEDIUM No of samples received 3
Sercunty Seal Intact. No of samples analysed 3
General Comments
• This report contains the following information:
Sample Container(s)/Preservation Non-Compliances
1 •
Summary of Sample(s) and Requested Analysis
Requested Deliverables
Samples received in appropriately pretreated and preserved containers.
• Sample(s) requiring volatile organic compound analysis received in airtight containers (ZHE).
• Breaches in recommended extraction / analysis holding times may occur.
• Microbiological testing will be subcontracted to Brisbane City Council Laboratory.
• Please be advised that samples were received after 03:00pm on 24/11/09 and BCC
last minute pick up time. Beyond the 3:00pm cut off time that marks of the next day
pick up time that makes the microbiological analysis breaching the 24 hours from the time of
sampling.
• The recommended holding time for microbiological analysis is 24 hours from the time of
sampling.
• Please direct any turn around / technical queries to the laboratory contact designated above,
t •
•
•
Please direct any queries related to sample condition / numbering / breakages to Maggie Kahi
Analytical work for this work order will be conducted at ALS Brisbane
Sample Disposal - Aqueous (14 days), Solid (90 days) from date of completion of work order.
Enulronmental Orulslon Brisbane
ca-rALS Laboretorq Group
1 Tel. +61 -i 3243 222 F I -^ 1 r rrlrrli^rr^'om
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLERelated documentApplication case desk ↗
About this file
- File size
- 34.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.