Council archive · source document
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE · 132002.220285
Very large file (34.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
ALS Laboratory Group
ANALYTICAL CHEM TRY & TESTING SERVICES
Environmental Division ALS
SAMPLE RECEIPT NOTIFICATION (SRN)
Comprehensive Report
EB1000755
Client DUKE ENVIRONMENTAL Laboratory Environmental Division Brisbane
Contact MS JULIE SCHUBERT Contact Tim Kilmister
Address PO BOX 78 Address 32 Shand Street Stafford QLD Australia
WURTULLA QLD, AUSTRALIA 4575 4053
E-mail [email protected] E-mail [email protected]
Telephone +61 54933322 Telephone +61-7-3243 7222
Facsimile +61 07 54933422 Facsimile +61-7-3243 7218
Project DE0923 Page 1 of 2
Order number 291825
C-O-C number Quote number EB2009DUKENVO217 (BN/317/09)
Site Noosa Civic
Sampler SH OC Level NEPM 1999 Schedule B(3) and ALS
QCS3 requirement
Dates
Date Samples Received 15-JAN-2010 Issue Date 18-JAN-2010 16 28
Client Requested Due Date 27-JAN-2010 Scheduled Reporting Date
27-JAN-2010
Delivery Details
Mode of Delivery Carrier Temperature 12.7°C - Ice present
No of coolers/boxes 1 LARGE No of samples received 5
Sercurity Seal Intact. No. of samples analysed 5
General Comments
• This report contains the following information:
Sample Container(s)/Preservation Non-Compliances
Summary of Sample(s) and Requested Analysis
Requested Deliverables
' Samples received in appropriately pretreated and preserved containers.
• Sample(s) requiring volatile organic compound analysis received in airtight containers (ZHE).
' Breaches in recommended extraction I analysis holding times have occurred.
• The recommended holding time for Nitrite, Nitrate +/or reactive phosphorus
analysis is 48 hours from the time of sampling. As per COC the samples were
dated on 12/01/2010 and ALS received the samples on 15/01/2010.
• Please direct any turn around / technical queries to the laboratory contact designated above
• Please direct any queries related to sample condition / numbering / breakages to Maggie Kahl.
• Analytical work for this work order will be conducted at ALS Brisbane.
• Sample Disposal - Aqueous (14 days), Solid (90 days) from date of completion of work order.
Enulronmental Olulsion Brisbane
fri.. e ALS Laboratory Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLERelated documentApplication case desk ↗
About this file
- File size
- 34.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.