Skip to the record
Beware of cheap imitations.

Council archive · source document

Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE · 132002.220285

of 202

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (34.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

    rage                           2 of 8
    Work Order                     EB1000755
    Client                         DUKE ENVIRONMENTAL
    Project                        DE0923                                                                                                                                                                                       ALS
    Analysis Holding Time Compliance
    Tha fo!lov,ing report summarises extraction    preparation and analysis times and compares with recommended lioidinq times. Dates reported r-;present first date of extraction or analysis and pr.xlude:, <.uhsequent
    dilutions and reruns. Information is also provided re the sample container (preservative) from which the analysis aliquot was taken. Elapsed period to analysis represents number of days from sampling where no
    extraction r digestion is involved or period from extraction I digestion vMere this is present. For composite samples. sampling date is assumed to be that of the oldest sample contributing to the composite.
                                                                                                                                                                                                       Sample date
    for laboratory produced leachates is assumed as the completion date of the leaching process Outliers for holding time are based on USEPA SW 846, APHA. AS and NEPM (1999). A listing of breaches is provided in
    the Summary of Outliers.

    Holding times for leachale   methods (excluding elutriates) vary according to the analytes being determined on the resulting solution For non -volatile analyzes. the holding time compliance assessment compares the
    leach date with the shortest analyze holding time for the equivalent soil method. These soil holding times are, Organics (14 days); Mercury (28 days) & other metals (180 days). A recorded breach therefore does not
    guarantee a breach for all non-volatile parameters.

    Mite.; WATER                                                                                                                                                              Evaluation: x = Holding time breach : - = Within holding time.
                                                                                                                        Sample Date                  E0 action/Preparation                                     era%vsl;
                                                                                                                                       Date extracted    Due for extraction   Evaluate"    Date analysed     Due fcl a" iii c    E . aruat, n


     Clear Plastic Bottle - Natural
       Swi,                                                 SW2,                                                        12-JAN-2010         -                   -                --        18JAN-2010         19-JAN-2010
       SW3.                                                 SVV5


     Clear Plastic Bottle - Natural
       SW1,                                                 SW2,                                                       12-JAN-2010          ---                 --               ----      19-JAN-2010        19-JAN-2010            3
       SW3.                                                 SW5


     Clear Plastic Bottle - Nitric Acid; Filtered
       SW1,                                                 SW2,                                                       12-JAN-2010                                                         21-JAN-2010        11-JUL-2010
       SW3.                                                 SW5

    B(066G: Ammonia as N by DltllerdsAnalyser
     Clear Plastic Bottle - Sulphuric Acid
      Swi,                                                  SW2,                                                       12JAN-2010                                                          25-JAN-2010        09-FEB-2010
      SW3,                                                  SW5


     Clear Plastic Bottle - Natural
      GW 2,                                                 SW1,                                                       12-JAN-2010          -                   --              --         19-JAN-2010        14-JAN-2010            III:
      SW2,                                                  SW3,
      SW5


     Clear Plastic Bottle - Natural
      GW 2                                                                                                             12-JAN-2010                                                         19-JAN-2010        14-JAN-2010
     Clear Plastic Bottle - Sulphuric Acid
      SWt,                                                  SW2.                                                       12-JAN-2010                                                         26JAN-2010        09-FEB-2010
      SW3.                                                  SW5

    EKOBIG: Total Kjedahl Nitropsn By DiscretheAnalyar
     Clear Plastic Bottle - Sulphuric Acid
      SWt,                                                  SW2                                                        12-JAN-2010     23-JAN-2010       09-FEB-2010            3          23-JAN-2010       09-FEB-2010            V/
      SW3,                                                  SWS



-   -         -           -             -            -      -           -           -           -           -           -             -           -            -              -           -           -             -            -              -

Used in these records

About this file

File size
34.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Water Quality Monitoring Report - Noosa Civic - November 2009-2010 - Eenie Creek Rd NOOSAVILLE.pdf · 34.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.