Original source · versioned page text
Callaghan and Toth IWMP Report revised
Attached to the e-mail Change to DA - MCU18/0009.01.
Callaghan & Toth
TABLE 4.1 MUSIC CATCHMENT AREAS (DEVELOPED)
Catchment Land Use Music Area (ha)
Impervious
CATCHMENT A
Roof Areas – Villas 1 to 4 + Service Core Urban Residential 100% 0.121
Northern Pathways / Landscaped areas Urban Residential 35% 0.169
CATCHMENT B
Roof Areas – Entry building Urban Residential 100% 0.047
Southern Pathways / Landscaped areas Urban Residential 35% 0.011
CATCHMENT C – 10 new Carpark Areas Urban Residential 90% 0.013
TOTAL 0.36ha
4.2.2 Treatment Nodes
The “MUSIC Modelling Guidelines for South East Queensland” Version 1.0 prepared by Water
by Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.
The land use type used for this model was “Commercial” and the values in the guideline shown
in Table 3.7 and Table 3.8 of the guidelines have been used in this model. Figure 4.1 shows
the MUSIC Model layout for the site.
Bioretention Basins (Biopods) have been placed to treat flows from proposed villas, entry
building and the tank overflows, landscaped areas, and pathways. To treat the new areas, two
biopods have been placed to catch flows draining from the listed areas. The Biopods are sized
as Biopod A is 32m2 and Biopod B is 10m2; a total . Each biopod has a filter layer depth of
0.4m and an extended detention depth of 0.2m. The size and depth of these systems has been
designed in accordance with Water by Design guidelines. The bio-pods drain to the unnamed
waterway on site to the east of the proposed development.
Six (6) Rainwater Tanks have been provided for the roof catchments as shown on Plan No
1714-01. The Reuse allowed is for:
1. Villas – toilets daily re-use – allow 1500 litres / pedestal in accordance with QDC.
2. Some watering of landscaping.
Sizing checks for the six rainwater tanks is detailed in Section 5.0 below.
In comparison the Deemed to Comply Solutions requires 2.2% of the catchment size for the
North Coast region for Solutions C11. This would equate to 79m2. In comparison the MUSIC
model has determined that a total of 42m2 across two biopods achieves the target reductions
for pollutants – see Table 4.2.
11
1714-Cartwrigth Village Extension_IWMP_Revision 3.doc April 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.