Original source · versioned page text
Callaghan and Toth IWMP Report revised
Attached to the e-mail Change to DA - MCU18/0009.01.
Callaghan & Toth
7 CONCLUSIONS & RECOMMENDATIONS
The proposed development area can be treated by a treatment train consisting of rainwater
reuse tanks, Gross Pollutant Traps, Detention Basins, and biopods, which are capable of
removing the gross pollutants, sediment, nutrients and heavy metals.
The car parking and new buildings can be built to flood free levels in accordance with Council’s
requirements.
A system of detention tunnels (ECOAID) are able to attenuate the runoff concentrations back to
Pre-Development levels and so the development will not have an impact on the hydrology of the
receiving waters.
18
1714-Cartwrigth Village Extension_IWMP_Revision 3.doc April 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.