Callaghan and Toth IWMP Report revised
Attached to the e-mail Change to DA - MCU18/0009.01.
List Of Contents
1. Introduction And Summary 3
2. Pre- And Post-Development Runoff Rates By The Rational Method 4
3. Broad-Brush Detention Volume 4
4 Pre- And Post-Development Urbs Models 5
4.1 Model Set-Ups 5
4.2 Comparison To Rational Method Calculations 8
4.3 Detention Volumes 8
5. References 10
List Of Figures
1. Overall Site Plan 3
2. Urbs Model Layout For Pre-Development Scenario 6
3. Urbs Model Layout For Post-Development Scenario 7
4. Conceptual Arrangement Of Detention Volume 9
List Of Tables
1. Comparison of Urbs Outflow Rates To Rational Method Outflow Rates 8
2 Urbs Design Of Attenuation Volume, Regardless Of Critical Durations 8
Appendices
A. EcoAid Brochure 11
B. Urbs catchment File, Pre-Development Scenario 24
C. Urbs Catchment File, Post-Development Scenario 26
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.