<.	park road (12), noosa heads – dwelling house – 23643 DA (KC & ss)
	REPORT BY:	PO-2 Kerri Coyle & PO-6 – Sean Slevin

FILE:	23643 DA

APPLICANT:	Ron Ure

OWNER:	Ron Ure owner of Lot 54 on RP 52918 & Heenalu Pty Ltd owner of Easement ‘A’ on RP 177551 covering part of lot 64 on RP 52918

SITE:	12 Park Road, Noosa Heads described as Lot 54 on RP 52918, Easement ‘A’ on RP 177551 covering part of Lot 64 on RP 52918

EXISTING USE	Vacant

AREA:	794m² (Lot 54) & 174m2 (lot 64 - Emt A)

STRATEGIC PLAN:

Preferred Dominant Land Use:	Lot 54 – Open Space Conservation & Waterway Protection
Lot 64 (Emt A) – Detached Housing

Other Designation:	Nil

ZONE:	Lot 54 – Non Urban
Lot 64 (Emt A) – Residential Single Unit

PROPOSED DEVELOPMENT:	Dwelling House

DEVELOPMENT APRROVAL SOUGHT:
Development Permit	Preliminary Approval

Material Change of Use	X

Building Works

Reconfigure a Lot

Operational Works

Plumbing & Drainage Works

REFERRAL AGENCIES:	Nil

RECEIVED:	3 December 2003

NOTIFIED:	23 April 2004 to 19 May 2004

SUBMISSIONS:	4

FEES PAID:	$1200

( Submitters
Introduction
Proposal
This application seeks a material change of use of premises to allow for a residential dwelling to be developed at Lot 54 (No. 12) Park Road, Noosa Heads (including Easement “B” on RP 177551) and to provide access and vehicle accommodation via Easement “A” on RP 177551 covering part of Lot 64 Allambi Rise, Noosa Heads.
The dwelling house is proposed to be supported by timber columns whereby 2 main levels and a small entry level located to the east of the kitchen provide for a gross floor area of approximately 150m2.  Each level is single storey, set on columns above natural ground level.  The design of the dwelling is stepped to integrate with the existing landform and to minimise the need to remove vegetation and at its highest point is 9 metres above the natural ground level.  The 2 levels while being modularly separated are linked by a covered stairway.  It is proposed that the lower floor level accommodate the kitchen, living, dining, laundry, main bedroom and ensuite.  The upper level is to incorporate 2 bedrooms, family room and ensuite.  Attachment 1 details the proposed plans
It is the intention of the applicant to construct the dwelling house concurrently with the already approved dwelling house at Lot 55 Park Road.
Site and Locality Description
The site is 794m2 in area, with a 21.44 metre frontage to Park Road.  Park Road has a sealed bitumen construction, however vehicular access to the site from Park Road is not currently provided.  Vehicular access to the site is available from Allambi Rise via a 4.27 metre wide easement (Easement A) located along the northern boundary of Lot 64 Allambi Rise.  A secondary easement was created along the northern boundary of Lot 54 Park Road for reasons to provide pedestrian access to Park Road and Noosa Main Beach for the dominant tenant – Lot 64 Allambi Rise.
The Allambi Rise allotment has an existing residential dwelling, whilst the Park Road allotment is currently vacant.  The Park Road allotment is densely vegetated with a mixture of Eucalypt and Rainforest species, and rises steeply upward from Park Road, cresting near the rear of the Allambi Rise allotment.  The Park Road allotment is oriented in a north-westerly direction towards Laguna Bay.  Further, the adjoining lot to the south (Lot 55 Park Road) is vacant with approval for a dwelling house and garage.  Both allotments are located in a Sand Dune Problem Area.
The applicant advises that the development will “blend” with the surroundings by implementation of similar conditions to the approval issued to Lot 55 which require development to be carefully controlled on site and non-reflective roofing materials and coloured muted earth tones.
assessment
Strategic Plan
The subject site is contained within the Noosa Heads/Noosaville locality.  In accordance with this locality, the site upon which the dwelling is proposed is included within the Open Space – Conservation & Waterway Protection designation.  This land has been strategically assessed as having significant environmental values and the potential for adverse impacts is highest.  The most relevant objective states:-
Protect the environmental values, which exist in the Noosa Heads/Noosaville locality.
The Strategic Plan identifies the intent of these areas as maintaining the environmental values of the land to the exclusion of development, which would impact on those values, irrespective of the scale of impact or the time taken to result in a measurable impact.
The Strategic Plan indicates that for private allotments wholly included within the Open Space – Conservation & Waterway Protection designation, the highest order of use is a dwelling house and that subdivision is not intended.  The site is identified by the Strategic Plan as having significant vegetation values which frame the Hastings Street precinct and form part of an important koala corridor.
As indicated by the Strategic Plan, the subject site has high conservation status and any development over such land must maintain the environmental values.  The subject site is steeply sloping, is well vegetated and the geotechnical and engineering reports submitted with the application indicate that the vegetation is extremely important in maintaining the sites stability.  These reports indicate that minimal site disturbance should be undertaken, but acknowledge that the small trees and exotic plants to be removed within the dwelling’s footprint have no bearing on the overall stability.
The proposed building form responds to vegetation stepping down the slope and is of a shape designed to accommodate existing vegetation.  Careful site management will however be required to avoid compaction from construction activities and alteration to the root system to ensure their long term survival.  The proposed construction methods should minimise disturbance to their root system.
Notwithstanding this, concern is raised for the proposed use of a crane to construct the dwelling and its potential to impact on the tree canopy.  In this regard the applicant advises that it is proposed construct the Ure and Robertson Houses concurrently, with the crane erected on the Robertson site.  Whilst this has some advantages, the applicant has been unable to demonstrate that the crane will not impact on the tree canopy, advising only that ‘the trees to be retained is approximately one third of the footprint leaving approximately 100m2 open for crane movements”.  Concern is also raised with regard to the use of a crane, which will stand on the Robertson site, adversely impacting on this important backdrop to Laguna Bay, albeit temporarily.  It is therefore considered the preferred means of construction is by the creation of temporary platforms within the building footprint.
The design of the development is considered to be sympathetic to the existing landform and blends with the natural surrounding environment, despite instances where the floor level is 6 metres above natural ground level.  This approach to design does not exceed the 9-metre height limit and given the slope of the land and the extent of required vegetation retention necessitates the construction of a two-level dwelling house.
A balloon inspection of the site finds that the dwelling is of a height and location that will maintain the green backdrop to Laguna Bay, with the retained trees to screen the dwelling from view of the main beach and surrounds.  The lining of the roof with a copper material and use of natural colours on the dwelling facades will further assist the dwelling to blend in with the hillside.
Overall, the proposal is consistent with the Strategic Plan’s objective to protect the vegetation values of Noosa Hill, where an alternative construction method is used.
Development Control Plan
The site is included within Precinct 1 – Primary Committed of the Noosa Hill Development Control Plan (DCP).  This Precinct comprises land that may be regarded as being critically located in terms of potential impact upon visual amenity.  The broad intent of the precinct is to preserve existing substantial vegetation to the exclusion of development if necessary and to ensure that any development is integrated with the existing natural environment and character of the area.  The DCP specifically references the site and notes that dwelling house may only received favourable consideration where the dwelling house is:-
Designed to minimise the impact on existing vegetation and visual impact of the area;
The proposed shape of the dwelling has been influenced by the position of existing trees, with indentations in the building to accommodate the vegetation.  No significant vegetation is to be removed, with the dwelling located on the site in a manner that does not threaten any substantial tree.  Those trees to be removed include ‘umbrella’ trees and several small saplings located on the northern corner of the proposed building footprint.
In terms of visual amenity, the applicant has demonstrated through a balloon survey that the building should not be visible through the trees, with the building considerably lower than surrounding trees and foreground trees screening the building from view from Park Road and main beach.  The design of the building is also such that integrates the vegetation with the building’s form through the modular design.  The use of appropriate materials and colours will further assist the building to blend with the surroundings.
Does not exceed a building height in storeys of 2 storeys and building height in metres of 9 metres;
The dwelling does not exceed the stipulated height requirements.
Does not comprise more than 2 levels excluding garages; and
The dwelling does not exceed 2 levels, with the 2 levels assisting the dwelling to better integrate with the landform and vegetation.
Does not exceed a gross floor area of 150m2 excluding garages.
The applicant submits that the total gross floor area of the dwelling does not exceed the maximum permitted, with the total balcony area not exceeding 15% of the gross floor area of the building.  The calculations undertaken by the applicant are agreed with, however, the applicant has not include the walkway between the two modules.  This walkway is covered and appears enclosed and accordingly constitutes gross floor area (6m2).
The DCP indicates that applications that would result in increased yield are unlikely to be favourably considered by Council.  A condition is therefore recommended requiring the walkway to be unenclosed or for the deck area, adjacent trees 21 and 22 reduced to comply with a gross floor area of 150m2.
In regards to the DCP’s miscellaneous provisions, the applicant has indicated that colours will be used to blend with the natural environment, rooflines are generally parallel to the slope, and no cut and fill is proposed, apart from earthworks required for the steel members and the pool.  In regards to the pool, the extent of earthworks are unclear from the plans provided and concerns are raised about the potential impacts on adjacent trees.  A condition is recommended refusing the pool. The proposed building is otherwise adequately stepped down the slope fulfilling the physical design objectives of the DCP, with the design visually sympathetic to the site’s topography and vegetation.
Schedule to the Planning Scheme
The subject sites along Park Road are included within the Non Urban Zone with the site in Allambi Rise included in the Residential Single Unit zone.  The Non Urban Zone includes land which feature high levels of constraint and that has been determined to be of such significance that urban uses should not be permitted.  A dwelling requires the consent of Council within this Zone and aspects of the Strategic Plan and Development Control Plan are relevant in determining such a proposal.
The applicant has indicated through the engineering and geotechnical reports that the constraints of the site in terms of excessive slope can be overcome through careful construction techniques.
Under the Planning Scheme the site is also contained within a Sand Dune Problem Area.  Within these areas, no person shall without the approval of Council cause water to be concentrated, carry out drainage works, excavation, filling or other earthworks or removal any existing vegetation without prior approval.  Council’s Land Development Section has indicated that drainage will be collected, piped and discharged into the kerb and channel on the eastern side of Park Road, in a satisfactory manner.
Land Development
The main engineering concern regarding this application is in relation to the issues of the steep sand dune stability and the environmental integrity of the site.  To minimise the impact of the development the engineering consultant has recommended that the proposed dwelling be built in conjunction with the proposed dwelling on the adjoining allotment at 10 Park Road (22441DA - approved by Council on 12 June 2004) using a combination of a tower crane and a five tonnes extended-arm excavator.  Hence avoiding placing heavy equipment on the vegetated sand dune slope.
Vehicle Access
The site has a frontage to Park Road of 21.44 metres, however access cannot be gained from Park Road due to traffic safety issues, steepness and stability of the site and environmental considerations.
Alternate vehicle access is proposed via an access and services easement on Lot 64 RP 52918 to Allambi Rise.  This vehicular access extends 6 metres from Lot 64 (No 9 Allambi Rise) front boundary line to a 10 metres long carport to accommodate 2 carparking spaces in a tandem arrangement. The balance of the easement will contain a pedestrian path and steps to link the proposed carport to the proposed dwelling house.  This pedestrian path will be reasonably steep and meander around existing vegetation.
Carparking
As briefly mentioned above, a carport will be constructed within the existing easement with parking provided in a tandem arrangement.
The Court Order dated 27 March 2002 stated in relation to this issue;
‘The propriety of designing a tandem garage on easement A over lot 64 was challenged by the Council.  While it is an unusual suggestion, the cautions laid down by the planning documents for the development of this site call for unusual suggestions.  If the developer privately reaches agreement for off-site parking on private land so that the proposed house can properly comply with the DCP, and Strategic Plan, I see that as being reasonable.’
Generally Council would not allow vehicles to be located within a tandem arrangement, however given the significant constraints of the site, this arrangement is considered reasonable.  The legal documentation of the registered easement A (RP 177551) over Lot 64 for the benefit of Lot 54 allows for such use over the easement.
Encroachment Over a Private Easement
The eave of the proposed dwelling overhang onto the existing 4 m wide easement B (RP177551) over Lot 54, which is dedicated for pedestrian traffic for the benefit of Lot 64. This encroachment is considered minor and will unlikely comprise the designated use of the easement. However, Council is not legally entitled to authorise such encroachment without a legal agreement from the benefited party. Therefore, the applicant shall provide a legal document to allow this encroachment. Alternatively the applicant should remove the overhanging eave. Condition is provided.
Construction Traffic
All vehicles will enter via Hastings Street, as this is the only access to the area. A traffic management plan will be required to be submitted prior to Operational Works Permit.
The applicant has advised that this dwelling is to be constructed in conjunction with the adjoining development at 10 Park Road, thus limiting the volume of traffic utilising Park Road and the surrounding road network.
Geotechnical Issues
Slope Stability
The site is steeply sloped at an average of 35 degrees of a naturally vegetated sand dune formation.
The geotechnical engineers Morrison Geotechnic has investigated the stability of the site in relation to the proposed dwelling and will be present during construction of the foundations.  However, it is considered appropriate that a Geotechnical Engineer also be on site periodically throughout the construction of the dwelling and certifies the stability of the structure upon its completion.
Construction Management Plan
Upon completion the platform and the walls of the garage of No 10 Park Road (the adjoining allotment), a tower crane will be erected and all building materials lifted from this point for the construction of both the approved dwelling over 10 Park Road (22441 DA) and the proposed dwelling on this site.
The piles for the foundations will be installed progressively from a working platform using a 5 tonne extended arm excavator. This will allow the piles to be installed without the need for any equipment to be placed on the natural slope. The working platform/s will be prefabricated in specified size/s off site and lifted into position using the tower crane.  The working platforms later will serve as floor structure to the dwelling.
The tower crane height will be set at a minimum of 10 metres above the existing canopy. Materials handling and the maximum sizes of the prefabricated pieces will be covered in detail in a Construction Management Plan to be prepared by the builder in consultation with Whaley Consulting Engineers and presented to Council for approval prior to issuing Operational Works Permit. Also, an Environment Management Plan will be prepared by Whaley Consulting group engineers in consultation with the builder and be made available for approval by Council prior to obtaining Operational Works Permit.  The purpose of the plan is to safeguard the environmental integrity of the site particularly the sand dune surface and the tree canopy and specify approximate time frame for completion of the construction works particularly in relation to length of time the tower crane will remain installed on site in this visually prominent location. Conditions to this effect are included.
Stormwater Drainage
Stormwater shall be collected from the roof to a 1 in 100 year capacity holding tank and piped to an array of perforated pipes suspended beneath the floor.  The discharge from the perforated pipes should be released onto a filter or geo-textile fabric covered area under the house before dispersing on vegetation located downstream of the building site. This system attempts to simulate the actual rainfall pattern prior to the dwelling structure and minimize the potential to erosion.
Engineering plans showing the details of the proposed drainage system together with supporting calculation prepared by a qualified engineer shall be submitted to Council for approval prior to issuing the Development Permit for Operational Works. A condition is included to the above effect.
Sewer Mains
Sewerage reticulation is available across Lot 64 RP 52918 (No9 Allambi Rise) and it is proposed that sewerage from the subject site be directed via a pump up connection to this service. Operational Works Permit shall be obtained for the proposed sewer works.
Town Water Supply
The proposed dwelling shall be connected to the existing water supply pipeline in Allambi Rise.  A condition is included.
Erosion and Sediment Control
The method of construction is aimed at minimising the impact of the works on the existing conditions of the site.
However, it will be necessary to provide well thought-out erosion and sediment control plan suited to this site in consultation with the Geotechnical Engineer and maintained during the construction phase.
It may also be necessary that these devices be kept and maintained for a period of time after the construction phase and until the site is stabilised with vegetation and the risk of erosion has been greatly reduced.  A Development Permit for Operational Work for these works shall be required.  A condition is provided.
Bonds
Given the sensitivity of the site, it is considered appropriate to require a $20,000 bond to ensure no damage occurs to the environment and/or to any of Council’s infrastructure.  This amount should however be combined with other bond money required by this permit to form one amount which can be considered as the Compliance Bond.
Contributions
Roadworks Contributions
Council has prepared cost estimates for future road infrastructure in the coastal area of the shire. As this property has been vacant, it is considered appropriate to require a monetary contribution towards the cost of this infrastructure in accordance to Council’s Planning Scheme Policy PSP42 Costal Major Roads Network Contributions.  A condition is included in this regard.
Pathway Contributions
In accordance with Council’s Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, a contribution is required to be paid and a condition is included.
Public Notification
The application was publicly notified on 23 April 2004 with submissions closing on 19 May 2004.  A Notice of Compliance was received on 25 May 2004 confirming that all requirements of the Integrated Planning Act had been fulfilled.  During the notification period 4 properly made submissions were received relating to the following:-
1.	The elevation drawings of the double garage do not clearly define the setback of the garage.  Is a setback of 200mm permissible?
Comment
The proposed setback to the carport satisfies the setback requirements of the Building Code of Australia, which permits a carport to be constructed to the boundary.
2.	The elevations indicate a curved roof with no provision for stormwater.  Due to the proximity to the neighbouring dwelling, there is potential and high risk of erosion, instability to footings caused by stormwater discharge from the garage roof.
Comment
The application for Operational Works is required to address stormwater drainage, which includes all roof water, with the preliminary design considered to suitably disperse stormwater.
3.	Confirmation is sought that all materials will come via the easement from Park Road and not through the easement and that the pump for the sewerage system will be under the dwelling to minimise any noise caused by an activated pump.
Comment
Access via the site’s easement from Park Road is heavily vegetated and further clearing to permit access for delivery of construction materials is contrary to the preferred development of the site.  Accordingly construction materials are to be delivered via the easement from Park Road and conditions will apply advising of appropriate construction hours.
4.	The proposal will impact on Allambi Rise residents, given vehicular access is from Allambi Rise.
Comment
The proposal will result in increased traffic movement in Allambi Rise, given the proposed access arrangements.  In terms of traffic planning, the Allambi Rise access is preferred to a Park Road access and the increased traffic movement will not significantly impact on residents in Allambi Rise.
5.	Concerns are raised about the proposed construction methods, ensure piling is undertaken due to the slip factor, heavy machinery is not used on site and debris are dispersed.
Comment
The applicant’s geotechnical report has been assessed by Council’s geotechnical consultants, Building Services and Land Development section whom are satisfied that the proposal satisfactorily addresses the site’s potential slippage.
6.	Protective measures to ensure no damage to the easement and particularly the northern boundary.  Measures should include protective scaffolding type barriers with hessian and costs to clean resultant dust.
Comment
Whilst careful construction measures are required for the site, these are required to address the site’s potential for slippage and to minimise disturbance to existing vegetation.  Additional protective measures such as suggested by the submitter are not necessitated by the site’s constraints for adjoining residents.
7.	A low level lighting plan is required to ensure lighting does not impact on adjoining residents.
Comment
A condition is recommended requiring external lighting to be hooded and directed away from neighbours.
8.	The current plans do not make clear the requirement to provide complete and continual access through the easement to the owners of 9 Allambi at all times.
Comment
An easement does exist through the park road lot to provide pedestrian access for 9 Allambi Rise.  Notwithstanding this easement, a pedestrian path through the site is likely to result in further clearing of vegetation and earthworks given the steepness of the site.  A condition is therefore recommended advising that no path is permitted.
Conclusion
It is concluded that the proposed dwelling house is consistent with the Strategic Plan objectives for the site to maintain its vegetation values which frame the Hastings Street precinct and form part of an important koala corridor.  The proposal also meets the Development Control Plan provisions specific to the site and Noosa Hill, subject a condition being imposed to ensure the dwelling does not exceed 150m2, and no pool is constructed.  The applicant has demonstrated that the proposal retains the site’s significant vegetation, will be screened from view of main beach, steps suitably down the site and has satisfactorily addressed the site’s physical constraints.  It is therefore recommended that the application be approved with conditions.
RECOMMENDATION
With regard to 23643 DA (RW Ure) for a Material Change of Use of Premises for a (Dwelling in Non Urban Zone) at 12 Park Road & 9 Allambi Rise, Noosa Heads described as Lots 54, & 64 on RP52918, Parish of Weyba, Council approve the application and grant a Development Permit, subject to the following conditions:-
Land Use
Development undertaken in accordance with this approval must generally comply with the approved plans of development.  The approved plans are numbered DD02.02 B, DD03.02 C, DD03.03 B, DD04.01_1 A, DD04.02_1 A, DD04.03_1 A, DD04.04_1 A, DD04.00 A, DD05.02 B and dated 30 March 2004, and as may be amended by these conditions.
The use and all activity on the site, including construction and excavation, is to be carefully controlled and interference with vegetation kept to an absolute minimum to ensure that the proposed use does not undermine or compromise the Noosa Hill Development Control Plan and the Strategic Plan objective of preserving the natural character and appearance of Noosa Hill.  The approval is to be implemented with this objective as the overriding factor.
All roofing of the structures on site are to be of a non-reflective nature and coloured with muted earth tones.  All structures are to use colours that integrate with the natural environment and be of muted earth tones of browns, greens, ochres, greys etc generally in accordance with Drawing No. DD04.01_2 B, DD04.03_2 B, DD04.04_2 B, DD04.02_2 B dated 2 April 2004.
The glass provided along the western elevation of the dwelling house is to be angled downwards towards the slope of the site so as not to be reflective.  Non reflective glass shall also be utilised for the development.
The dwelling house shall not exceed a total gross floor area of 150m2, with the stairs considered to be gross floor area.   An amended plan demonstrating compliance with this condition shall be submitted the Manager, Land Use prior to the approval of an application for Building Works.
No pool shall be permitted on site, with the pool deleted from the approved plans.
The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions.
The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan is to be prepared and submitted for approval.  The landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter.  The landscape plan is to clearly indicate:-
the retention of vegetation in accordance with Drawing No. DD02.02 B and dated 30 March 2004 and reinforcement planting of endemic species on the site;
the retention of all existing vegetation on the site outside of the approved building footprint; and
the proposed means of protecting trees to be retained, particularly during the construction process.
No fencing is permitted to be erected across the Park Road frontage of the site.
No pathway/accessway is permitted through the site to Park Road.
All external lighting is to be hooded and angled away from neighbouring properties.
Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit.
The requirements of this development approval are to be satisfied, prior to the commencement of the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions.
The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works.
This Development Permit for a material change of use of premises lapses if:-
the use or erection of a building or other structure associated with the use, has not been commenced by 12 August 2008, unless application is made and approved by Council for an extension; or
the use of any premises pursuant to the Development Permit ceases.
Land Development
Vehicle Access
A vehicular access driveway to serve the site shall be constructed from Allambi Rise into the existing 4.0 metres wide easement (referred to as Easement A on RP 177551).
The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming.  Should any driveways be constructed to grades that do not comply with AS2890.1-1993, Council will require that the driveway be removed and reconstructed to levels that do comply.
Carparking
A minimum of 2 covered carpark spaces shall be provided in tandem arrangement within the 4.0 metres wide easement (Easement A on RP 177551).  No vehicular or boat parking shall be allowed within the 6 metres setback.
Stormwater Drainage
Detailed engineering plans of the proposed drainage system together with supporting calculation prepared by a Registered Professional Engineer shall be submitted to Council for approval prior to obtaining a Development Permit for Operational Works.
Encroachment over a Private Easement
The applicant shall provide a legal document to allow the eave encroachment of the proposed house over easement B on RP 177551. Alternatively this encroachment shall be removed.
Sewer Mains
The site shall be connected to Council’s existing sewerage reticulation systems over Lot 64 RP 52918 (No9 Allambi Rise) and be constructed in accordance with Council’s standards and requirements at no cost to Council.  Design plans showing the detail of the pumping system and any civil works and/or excavation work associated with it shall be submitted for Council approval and an Operational Works Permit shall be obtained for the proposed sewerage works.
Town Water Supply
The site shall be connected to Council’s existing town water supply in Allambi Rise and be constructed in accordance with Council’s standards and requirements at no cost to Council. The new connection to the water reticulation system shall extend within the easement to the property boundary line of 9 Allambi Rise and be metered.
Geotechnical Issues/Construction
All construction works on site shall be in accordance with the recommendations and onsite instruction by Morrison Geotechnic or a certified geotechnical engineer approved by Council, but shall exclude construction of dwelling house by a crane.  In this regard an amended Construction plan shall be submitted with the application for Operational Works.  This amended plan shall address an alternative construction method such as a temporary platform over the building site or other alternative means that limits disturbance to the site.
An experienced geotechnical engineer is required to be on site for the whole of the time during any excavation and house foundations. Such work shall only be carried out during dry weather conditions.  The geotechnical engineer shall also inspect the site periodically throughout the construction of the dwelling and certify the stability of the structure upon its completion.  Should any risk of sand movement occur - all work shall be suspended until steps (approved by the Geotechnical engineer in conjunction with Council’s Manager of Building Services) have been taken to ensure that no further slippage or sand movement will result.
The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed in accordance with the approved Construction Management Plan.  Details of the method of this disposal of materials are to be submitted to Council at the Building Application stage.  Not more than one vehicle at a particular time will be parked in Park Road and/or Hasting Street for the removal of, or the delivery of, materials associated with the site and no such vehicle shall remain overnight.  No materials are permitted to be stored within the road reserve.
A Construction Management Plan detailing the method and process of construction shall be prepared by the builder in consultation with the applicant’s consulting engineer (Whaley Consulting Engineers) and presented to Council for approval prior to issuing Operational Works Permit.
A programme of works is to be submitted with any application for any Development Permit for Operational Works detailing the construction schedule and proposed environmental protection measures, which addresses stabilisation of disturbed areas and identifies any affected vegetation.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be submitted to Council’s Works Inspector within seven (7) days.
A Traffic Management Plan for the Construction of the Dwelling addressing access to the site, the locating of equipment, carparking arrangements for workers on the site and any potential conflicts with local traffic shall be submitted and approved by Council prior to Development Permit for Operational Works.
Prior to obtaining a Building Permit the builder shall submit written acknowledgment that building works shall proceed in accordance with the 9 tonne load limit applicable to Park Road, unless varied by Council and that all works will be carried out in accordance with the approved Construction Management Plan.
At the completion of construction the consulting geotechnical engineer will certify that all works were carried out in accordance with their recommendations and that all structures and the site are stable.  A copy of this certification shall be submitted to Council to be placed on Council records.
Existing Conditions Survey is to be carried out on adjoining buildings, structures and services prior to any construction works taking place on site. If distress already exists, a photographic survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A copy of this report is to be submitted to Council within 5 business days of survey and prior to construction work proceeding.
The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques.
Environment Management Plan
An Environment Management Plan shall be prepared by the applicant’s consulting engineers (Whaley Consulting Engineers) in consultation with the builder and be made available for approval by Council prior to obtaining Operational Works Permit.  The purpose of the plan is to safeguard the environmental integrity particularly the sand dune surface and the tree canopy.  The plan shall also specify approximate time frame for completion of the construction works particularly in relation to length of time the tower crane will remain installed on site in this visually prominent location.
Erosion and Sediment Control
Any person acting on this permit shall prevent erosion and sediment export from leaving the site.  Site control measures such as silt fencing, straw bales, controlled gravel access to the site and controlled disposal of waste, as deemed necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions
Coastal Major Road Network Contributions of an amount of $2,442 in accordance with Planning Schedule Policy PSP42 shall be payed by the applicant prior to issuing a Development Permit for Operational Works.
Coastal Major Pathway Contributions of an amount of $238 in accordance with Planning Schedule Policy PSP41 shall be payed by the applicant prior to issuing a Development Permit for Operational Works.
General
Any damage caused to any public utility or roads caused by the construction of this development shall be repaired to Council’s standards and at no cost to Council.
Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road.  All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle.
Building
A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height above natural surface, required by the provisions of the Planning Scheme.
The Geotechnical report submitted as part of your application has been appraised and approved subject to the following conditions:-
There is to be no uncontrolled discharge of water onto the slope;
Stripping of vegetation for construction purposes should be minimised.  If vegetation is destroyed it should be reinstated immediately after construction is completed;
Additional load due to fill, construction equipment or stockpiled materials should not be located on the dune slope;
The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques;
All construction works on site shall accord with the Building Construction Reports prepared by Whaley Consulting Group dated December 2002 subject to amendments required by condition 22, and 12 March 2004, together with the Morrison Geotechnic reports dated 1/9/00, 25/5/01 and 24/3/04.  Particular attention shall be paid to the advice contained in Section 6 of the Morrison Geotechnic report of 24/3/04 in the event of changed site or construction conditions.
A condition survey is to be carried out of adjoining buildings, structures and services prior to any demolition works or construction works taking place on site.  If distress already exists, a photographic survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be implemented.  A copy of this report is to be submitted to Council within 5 business days of survey and prior to construction work proceeding;
Copies of all inspection reports by engineers are to be submitted to Council within 5 business days of the inspection taking place;
A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection reports are to be submitted to Council within 5 business days of the inspection taking place;
The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during any excavation.  The construction of the whole of the foundations is to be supervised and directed on site by a consulting Geotechnical engineer.  No work of any such kind relating to the foundations shall be carried out if he is not on the site and supervising and directing this work.  Such works shall only be carried out during dry weather conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps, approved by the applicant’s Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure that no further slippage will result.
 The builder, landscaper and all workers associated with construction of the works shall, at all times, comply with the directions of the consulting geotechnical engineer.
There shall be no direct access from the dwelling to the pool.  The pool shall be enclosed by an isolation fence complying with Section 12U of the Building Act.
The proposed tandem carport is not to discharge water onto any adjoining property.  All roof water is to be piped to the stormwater discharge system for the dwelling.
Prior to any Development Permit for Building Work being granted for construction of the dwelling or carport, Council is to be provided with a copy of the duly signed agreement between the owners of Lots 54 and 64, registered with the Department of Natural Resources as an addendum to the easement document, binding the owner of Lot 64, his successors or assigns, to allowing construction and retention of the proposed carport within the easement over Lot 64.
Prior to a Development Permit for Building Work being granted for the construction of the dwelling, the applicant shall provide Council with written indemnification against any future claims from the applicant/owner of Lot 54, his successors or assigns resulting from any future damage to the dwelling or other structures arising from their proximity to the trees that are required to be retained on the property as a condition of granting the MCU for this development.
Further Development Permits Required
Prior to the commencement of development, the following Development Permits must be obtained:-
Development Permit for Building Works;
Development Permit for Operational Works for site civil works, erosion control plan, stormwater drainage, sewer reticulation, landscaping.
 (Index Application No. 23643 DA – (PO2))
Directorates/Sections Consulted:
	Business
Corporate Services
Community Services	x	Environ & Planning

Aquatic Centre
Financial Services
Art Gallery	x	Building Services

Building Certific.Group
Information Services
Enterprise Group
Environmental Services

Child Care Centre
Legal Services
Environmental Health	x	Land Development

Council Laboratory
Planning & Support
Library	x	Land Use

Leisure Centre
Revenue Services
Public Order and Safety
Plumbing Services

Water & Sewerage

Recreational Services
Strategic Planning

Respite Centre

Works
Human Resources
Exec. & Secretariat

Design

Survey

Works Administration

Works Implementation

Works Planning

Works Support

ATTACHMENT 1

Environment & Planning Portfolio Reports 30/07/04 - Ordinary Meeting 12/08/04	1

A j:\datawrks\wrkcache\853237\park road house.doc	28/07/04

Used in these records

About this file

File size
974 KB (small file)
File type
DOC

No other editions are linked here.

Original file

Log in to download the original file

2004-08-04 E&P - 23643 DA - Park Rd - Dwelling.doc · 974 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.