Skip to the record
Every meeting, every word.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                               .
                                                                                                                                                                                   I




 7.0          LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES

 Management actions for keeping the treatment train in working order are listed in Table 7-1, and
 are described  in detail in Appendix D. The maintenance actions required do not vary between
 Stage 1 and the ultimate development. Management of stormwater during the construction
 phase will be covered by the Sediment and Erosion Control Plan.
                                           .


Ta ble 71 M anagement A ctlons 0f the Essence 0fPere~lIan Stormwater Management Plan
          -
              .




       Management                                                                                        Description
            Action


        EP-SMP-01
                                   Maintaining the 3kL rainwater tank volumes associated with each beach
                                   shack

                                   Maintaining the 100kL underground rainwater tanks associated with the
        EP-SMP-02
                                   ornamental garden irrigation scheme

        EP-SMP-03                  Maintaining the vegetated buffer zones
        EP-SMP-04                  Irrigating the ornamental gardens
        EP-SMP-05                  Maintaining Swales or Catch Drains
        EP-SMP-06                  Maintaining the bio-retention trenches
        EP-SMP-07                  Maintaining the pipe infrastructure                                          ~      ....._

                                                                                            I


                                                                                                        A




                                                                           <.~~~)j
                                            ..,._~’:~           ’"
                                                                -   --
                                                                                ,,~.<
                                                                                          ). 1 ’)>1J


                                                                                                .~-__/           rll
                                                                                                                                J

                                                                                                                                     r-
                                                                                                                                         /
                                                                                                                                          I

                                                           t’            --~   .e.


                                               ’’’’
                                                                                                                                  ,rr’
                                                                                                                          _of’"
                                                ,j              ....
                                                                                      ~


                                                                               ,_.r’.,.._ .~_~_---"’-~"_~-"""-~’_"’_""-




 @2012 Simmonds & Bristow Pty LId                                                    Contrast Constructions                                   J-1005-310   -
                                                                                                                                                               22 March 2012
 I :ICLlENTFILESIContrast Constructionsl11 08-155c    -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP                      _




 SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                                                              Page 13 of 24

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.