Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 50, section 1. The text section number identifies this passage in the reader.
-
-~
I
EROSION AND SEDIMENT CONTROL
DAILY SITE CHECK LIST
C ’()lllrolling \rorl1\\.Jter pollution on your building site
Location of site
Site Supervisor
It is suggested that the site
supervisor completes the following checklist daily while site work occurs.
I
TIMIN
....
~ a. m
s:’ =r
::0 (")
I ,
ITEM AND/OR LOCATION TO CHECK ;::j.
0
-
Q
"""
.,
c
~ g
_.
o
=>
IQ
=r
..
g.
a.
..
0
!:t
0
3
"0
~
0 ’< <to
~ 0 c
0 .....
I 0
....
::J
a- ....
=r
I a. Have the tradespeople and suppliers been made
aware of the
I
requirements for erosion and sediment control, and the consequences
involved if there is a breach?
b. If required, has an Erosion and Sediment Control
Management Plan been
prepared and approved?
0 Are all contractors and subcontractors aware of the
contents of this plan?
c. Is the builder’s sign displayed?
d. Are the sediment fences erected
adequately/correctly?
NOTE:
. Geotextile sediment fence buried at least 200 mm below
ground.
. Posts installed at minimum 2m
spacing.
. Built up sediment should not exceed 1/3 of the
height of the sediment fence.
0 No tears or rips.
0 Not laying down or covered over
by materials.
0 Is there an advisory/attention
sign on the sediment fence?
e. Is the stabilised entry/exit
point (rumble pad) in the correct location?
NOTE:
0 Are all tradespeople/suppliers
using this entry point?
f. Does the entry/exit point (rumble
pad) require maintenance?
NOTE:
. Has the entry/exit pad got excessive sediment in it?
0 Turn over with a machine to
expose the coarse aggregate again.
.
Aggregate must be 40 mm or greater.
. Is there a bunding/diversion drain above the stabilised
entry/exit point
(rumble pad) to divert sediment behind the sediment fence?
.
Are the
tradespeople using an adjacent lot to gain entry to the site?
If so, has permission been
sought from the land owner(s) and are there
control measures in place to
prevent the movement of sediment off the
lot and into the gutter?
,,<,’.:,~:::1;~~::4}::;~~~.;;~~tJ
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.