Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 54, section 1. The text section number identifies this passage in the reader.
’EP-SMP-01:Maintaining the 3 m3 rainwater tank volume associated with each beach shack
9. Contingency When loss of control of the rainwater tank and roof guttering system occurs:
.~1 I ;
,
,~ 1) Inform site manager, and request maintenance support;
(j
2) Inspect existing structure for points of failure;
’
f:
,_.,
"; ’
!i.~; "
3) If necessary direct flow onto stable ground (grass surface, swale). This
,
may require draining the 1.5 m3 rainwater tank;
"
c
’,",
~
.
1
"
4) Implement corrective actions
10. Corrective actions Structural Integrity
~
’I ~~
1) Clean out guttering and downpipe if required;
~"
>0.
,
..
2) Repair guttering and downpipe if required;
~. ~.~~
!;;,:~ ~ 3) Clean, repair or replace first flush diverter if required; and
,
..
4) Clean, repair or replace mesh on rainwater tank if required;
x’ .
i ~
’,’ ~
"
!uor
,
r.’;:;
-,
Water Quality
,"
,. ~
5) Empty and clean, repair or replace the rainwater tank if required.
!:
.,;)
’< ,
"l,ji
}.
,
.. ~ \
,.
’f
~a.t !!Io, .
,}^’ )k I
i~
..
~,:li;.
,?,.
1.;’
J<
.1
~1
.( ,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.