EP-SMP-03: Maintaining the vegetated buffer zones
6. Frequency/Deadlines 1) Irrigation system for performance (blockages, leaks): weekly.
2) Garden surfaces for bare patches and weeds: monthly. Soil pH:
seasonally twice a year.
7. Responsibilities Site Manager;
Landscape contractor
8. Reporting and 1) Monthly reporting of maintenance costs sites where weeds and
Review permanent cover are difficult to maintain to the site manager;
9. Contingency When loss of control of the landscape irrigation system and vegetation
buffer occurs:
1) Inform site manager, and request maintenance support;
r,
2) Cease irrigation supply, If overflowing water cannot be stopped, redirect
overflow onto stable ground (grass surface, swale);
\,
~
,
/J~ 3) Redirect surface water flow to bypass bare or easily eroded surfaces,
~A
’\
and direct overflow onto stable ground (grass surface, swale);
’.~
.
,;.’ ,,:~ !i: ij 4) Rake and contain any grass clippings, plant litter; compost or litter from
the flow path;
, ’ li
,
r::J
",’t’ 5) Remove collected litter and compose, and dispose of appropriately;
" "
..
6)Implement corrective actions.
"
,10. Corrective actions Mowing and pruning
I
.
1) Site manager reinforcing the need for off site disposal or composting of
:
I~ ’.~: ! (.~" #~ lawn clippings;
! l..’i "j
~
.
.
tl"Fi
IJ ..
i .~.
,
_
-,
~-
, ;
-
2)Site manager to reinforce the need for off site disposal, mulching, or
,
composting of pruned materials;
.- .
-.
~ "
-_
!
:I tI’ ’1
~
3) Site manager reinfQrcing the need for maintaining plant vigour by
{Ii.i.j,
(t~-~ "i
,w li
,,,:1: Ioil ,!l! ~ " fertilising lawns and gardens appropriately. Ul3e recommended fertiliser
:~
application rates and ~anaging soil pH to avoid leaching of fertiliser
i
~
~
.
.
nutrients into stormwater.
rn
Weeding
.
u ~
’~’~I
’," i~ ^:j’
i ,
~
!
’~
I’
~’
q
~ 4)Site manager reinforcing the need to weed lawns and gardens;
~.
~
’f’! b it:
’?~ "j,.
,
~,
5) Site manager reinforcing the need to remove terrestrial and aquatic
!’^- O.
ct’
weeds from the vegetative buffer strip and terminal wetlands.
~ ,
. .
, ,. t~
’;"
’1
Irrigation
lI~ , i .. .
,
,
F .
,
6)Blockages and leaks in the irrigation plumbing and reticulation system to
" c
"I- .
"
,_
_
-;1’ 0’
j be promptly repaired.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.