EP-SMP-05: Maintaining the Swales or Catch Dl1lins ".
1. ObjectivesfTargets To channel the sheet-flow of stormwater into Bioretention Trenches.
2. Management Strategy 1)Slow stormwater flow by rough (grass)surface, reducing the erosion
risk;
,
"
:i,j
N
2)Settle and trap coarse sediment and particulates flowing slowly over
" -’f
I grass surface;
.
’.
.~
l
3) Slowly moving stormwater has time to infiltrate the permeable surface
, soil of the Swale;
..
,!~
l<’"
,4)Assimilate nutrients from infiltrated water by grass. Periodic mowing
..
. I
"
increases grass production, and physically removes nutrients from the
~::
system in grass clippings; and
~
’ij 5)Assimilate soil particles by grass growing over settled soil.
3. Tasks/Actions 1) Develop contour mound of permeable soil;
2)Vegetate Swale with appropriate grass or ephemeral wetland plants as
~-.~
"’!;i::~ .,
appropriate;
..
(j’
:1’
~ -
,
’
,
3) Inspect the integrity of the Swale (structure -
in particular gullying during
~ .’"’
,;..t ~
~’.
initial flows and vegetation cover);
-
~
(!"’ ~ l
.
.
1; .~ .-. , ’ti!I
.,
4) Inspect build-up of litter, detritus, and silt drapes as necessary; and
"
. :ki{ ~
\ !1
L4 ,(j
,’:;1 5) Periodically mow Swale at high blade setting, to maintain a rough
~
,. --
surface. Remove grass clippings.
4. Performance 1) 1 00% v~getative cover along Swale; grass clipped at length to provide an
Indicators effective rough surface;
,. W;~t
., r
~~
,.
~"
-
_: 2) No breaches or erosion of Swale; ".I ,-
"
’.
~
-~
~
~
.
. .
3) Swale free of litter and detritus; and
"
I
r
~
,
,
--~
4)Swale free of silt drapes that block infiltration of stormwater into the
";go ~
"
Swale.
--:;-
,
5,’ Monitorin~ 1)Vegetative cover, structural integrity; ’l
1,’l!:,:
I
~~
2) Litter/detritus/silt accumulation.
6. Frequency/Deadlines 1)Vegetative cover, structural integrity: Monthly.
^’
2) Litter/detritus/silt accumulation: Weekly.
7. Responsibilities Site manager.
Landscape contractor.
8. Reporting and Poor vegetative cover and lack of structural integrity to be reported to site
Review manager and senior management.
9. Contingency When loss of control of stormwater flow along the swale occurs:
1) I nform site manager, and request maintenance support;
::;,
,
rn 2) Redirect surface water flow to bypass damaged swale surface, and direct
.
. flow onto stable ground surface;
~
I
Il!l
3) Bridge damaged swale surface (sandbag,erosion mat);
, -
,
. .
..
4) Implement corrective actions.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.