EXECUTIVE SUMMARY
Simmonds and Bristow were commissioned by the Scanlon Property Group Pty Ltd to develop
a Stormwater Management Plan (SWMP)and Sediment Erosion Control Plan (SECP)for the
proposed Essence of Peregian development.
The SECP assessed the erosion hazard and risk based on the soil and topography of the
development site. The SECP provides information how to manage the erosion and off-site
export of soil from the development site, and a statement of the personnel responsible for
establishing and maintaining all erosion and sediment control measures.
The SWMP described the management of stormwater from the developed site and upslope
sources beyond the development area. The SWMP provided pre-development measurements
of water quality and soil parameters from the proposed development area, and computer model
outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with required
guideline standards. These standards were agreed at the Joint Experts Conference, and are
consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM
2009).
Plans that describe the stormwater treatment train (Appendix A) and outputs from computer
modelling used to support the stormwater design (Appendix B) are appended. These plans
show the proposed site layout, the location of bioretention trenches, building areas, plumbing
layout, and the structure of bioretention trenches within the development area.
Procedures for maintaining stormwater treatment units (Appendix D) and implementing the
Sediment And Erosion Control Plan (Appenaix C; Appendix E) are enclosed with this plan.
These procedures describe how to control erosion, and miqjmise off-site exports of sediment
and nutrients from the proposed development area, during the construction and post-
construction phases. A plan for monitoring water quality to demonstrate compliance with water
.
quality objectives is included.
,Ii
...rr ~
...;~
-"Or, {~’\_" ~.N
:" 1
..to- Jtf;~I;.: t:~ "~
"
!;:" .’-:;,. -’-’~: (""t..:"_
@2012 Simmonds & Bristow Pty LId Contrast Constructions 11 08-155C 22 March 2012
-
1:ICLlENTFILESIContrast Constructionsl110B-155c -
Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI110B-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.