Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

.




                                                            EXECUTIVE SUMMARY


    Simmonds and Bristow were commissioned by the Scanlon Property Group Pty Ltd to develop
    a   Stormwater Management Plan (SWMP)and Sediment Erosion Control Plan (SECP)for the
    proposed Essence of Peregian development.

    The SECP assessed the erosion hazard and risk based                                                                  on          the soil and   topography of the
    development site.            The SECP provides information how to manage the erosion and off-site
    export of soil from the development site, and a statement of the personnel responsible for
    establishing and maintaining all erosion and sediment control measures.

    The SWMP described the management of stormwater from the developed site and         upslope
    sources  beyond the development area. The SWMP provided pre-development measurements
    of water quality and soil parameters from the proposed development area, and computer model
    outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with required
    guideline standards. These standards were agreed at the Joint Experts Conference, and are
    consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM
    2009).

    Plans that describe the stormwater treatment train (Appendix A) and outputs from computer
    modelling used to support the stormwater design (Appendix B) are appended. These plans
    show the proposed site layout, the location of bioretention trenches, building areas, plumbing
    layout, and the structure of bioretention trenches within the development area.

    Procedures for maintaining stormwater treatment units                                                          (Appendix D) and implementing the
    Sediment And Erosion Control Plan  (Appenaix C; Appendix E) are enclosed with this plan.
    These procedures describe how to control erosion, and miqjmise off-site exports of sediment
    and     nutrients from the            proposed development                                  area,                during            the construction         and   post-
    construction phases. A plan for monitoring water quality to demonstrate compliance with water
                                                                                                                                        .




    quality objectives is included.
                                                                                                                               ,Ii

                                                                    ...rr    ~

                                                                                                      ...;~


                                                                     -"Or,   {~’\_"    ~.N
                                                                                      :"   1
                                                                                                      ..to-   Jtf;~I;.: t:~    "~
                                                                   "
                                                                                               !;:" .’-:;,. -’-’~: (""t..:"_




    @2012 Simmonds & Bristow Pty LId                             Contrast Constructions                                                        11 08-155C   22 March 2012
                                                                                                                                                            -




    1:ICLlENTFILESIContrast Constructionsl110B-155c   -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI110B-155C_SWMP
    SCEMP_Scanlon Property Group_V4 O_ta_120321.doc

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.