Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
r
.
APPENDICES
APPENDIX A LAYOUT DRAWINGS
APPENDIX 8 MUSIC MODELLING
APPENDIX C SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
APPENDIX 0 LONG TERM MAINTENANCE OF STORMWATER MANAGEMETN
FACILITIES
APPENDIX E SEDIMENT AND EROSION MANAGAEMENT PLAN
APPENDIX F SOIL AND WATER QUALITY SAMPLING MAP
APPENDIX G ACID SULPHATE SOIL MANAGEMENT PLAN
TABLE OF FIGURES
Figure 1: General Location of the Proposed Development ...................................................................2
LIST OF TABLES
Table 3-1: Water Quality Design Objectives for Loads Reductions ......................................................3
Table 4-1: Water Quality Measured in the Heath Wetland of the Existing Caravan Park Site.............5
Table 5-1: The Quality of Su ace Soil Measured in the Undeveloped Site ..........................................6
Table 5-2: The Quality of Su ace Soil Measured ’in the Undeveloped Site ..........................................7
Table 6-1: Drawing List........................~......................................................................................................8
Table 6-2: MUSIC Model Results -
Undeveloped Site.............................:............................................. 11
Table 6-3: MUSIC Model Results -
Stage 1 Site..................................................................................... 12
Table 6-4: MUSIC Model Results -
Fully Developed Site...................................................................... 12
Table 7-1: Management Actions of the Essence’of Peregian Stormwater Management Plan .........
13
Table 8-1: Factors Contributing to Erosion Hazard..................................~........................................... 14
Table 8-2: Sediment and Erosi n Control for Construction of the Essence of Peregian.................15
, ’.;.
Table 9-1: Installation Sequence for the Essence of Peregian Development.................................... 16
Table 10-1: Site Details ofthe Essence of Peregian Development.....................................................17
Table 10-2: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions.................. 18
Table 11-1: Summary of Test Methods for Ambient Su ace Waters .................................................
19
Table 11-2: Location of Water Quality Monitoring at the Essence of Peregian Site .........................
20
Table 11-3: Monitoring Schedule for the Construction and Operational Development.................... 21
@2012 Simmonds & Bristow Pty LId Contrast Constructions 11 08-155C _
22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c -
Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.