Council archive · source document
Attachment 2 - Traffic Report · MCU13/0251
APPENDIX B: PAGE 4 OF 5: JOINT EXPERT REPORT FROM PREVIOUS APPROVAL 13.s.12.5 Page - 15 [OCR of page images] HEH T CHE HOLLAND TRAFFIC CONSULTING [2 APPENDIX B: PAGE 4 OF 5: JOINT EXPERT REPORT FROM PREVIOUS APPROVAL 3. On-site Servicing Facilities Drawing 20517_A-18 shows the position of an MRV service vehicle in a location which blocks access to four of the proposed commercial parking spaces. Mr Holland also notes that, in his opinion, it is also obvious that provision exists for two large service vehicles to stand in front of the “refuge store”. Mr Holland considers this provision to be adequate. Mr Beard considers that the service vehicle provisions for the total development should be one Van space, one LRV space and one MRV space. In his opinion, use of these spaces should not block access to parking spaces, although it would be acceptable for occasional deliveries by an LRV to block either more than one loading space or a few staff parking spaces. 4. On-site Traffic Layout It was agreed that the currently proposed on-site parking layout was generally acceptable, or could be made acceptable (Mr Beard noted that some of the height clearances were inadequate). Wt Bho sn 4 Robert Holland 27" July 2009 Colin Beard 27" July 2009 13.8.12.5 Page - 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Traffic ReportRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.