USE GENERATED TRAFFIC FLOWS
morning evening
Retail: 62 vehicles per hour 195 vehicles per hour
Accommodation: 30 vehicles per hour 30 vehicles per hour
Total: 92 vehicles per hour 225 vehicles per hour
5.3 Revised year 2020 peak hour traffic projections with the proposed development
It can be clearly seen from those projections that the critical period in terms of operation of the David Low
Way intersection will be in the PM peak, not the AM peak, because through traffic flows along David Low
Way are similar in both peaks, but traffic flows generated by the development are significantly greater in
the PM peak. The circumstances are also the same for any traffic impact analysis of the current
approval. Thus, we have only considered the critical PM peak hour analysis in the balance of this traffic
impact assessment.
Using the traffic projections of Colin Beard from the JER (Appendix B) as a basis, predicted year 2020
PM peak hour traffic flows at the David Low Way intersection for the current approval, and for the current
proposal (with the accommodation the same intensity in both) are as follows:
2020 PM peak with current approval:
David Low Way
27 773
Unnamed 28
Road 28
27 872
David Low Way
2020 PM peak with current application:
David Low Way
61 773
Unnamed 61
Road 61
61 872
David Low Way
13.s.12.5 Page - 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Traffic ReportRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.