Original source · versioned page text
Landscaping Plans P0003847_GC_Change Application Package_20231103
Plans and drawings: the text below has words only, no drawings.
Original PDF page 4, section 2. The text section number identifies this passage in the reader.
DELIVERED
JOINS 202-FI
S
RM
W
UGE
BY OTHERS
E2
TU 01
S
9013 RM
FUTURE DRIVEWAY
E2
S
TU 01 RM
S LOCATION
RM
TU 01 RM
S
S
UGE W RM S
RM
PLOTTED BY: ELISE LIM
STREET TREES, EDGE AND PIT
S
UGE W
RM PA 01 S
S WITH GARDEN MULCH - REFER
.|. RM
TO DETAIL 901-DT
W UGE
S
UGE W RM S
UGE RM
W S 9000
RM
EXISTING
UGE
W S
UGE RM DRIVEWAY ENTRY
W S
UGE RM
- 200 - FI.dwg
W S
RM
PLOT DATE: 03.11.2023
S
RM
PATH: \\file03.urbis.local\Projects\Client\L\Lend Lease Prime Life\P0003847 - Sunrise Retirement Village Landscape\05 Construction Docs\5.1 CAD\5.13 Layouts\01_GRASSTREE COURT\P0003847_GC
S
RM
S
RM
S
FUTURE DRIVEWAY
LOCATION
NOTES:
1. All trees, tree pits, planting, garden beds and edging is to be
in accordance with Noosa Shire Council landscape
guidelines.
2. All trees to be staked as per Landscape Specification
PROJECT KEY PLAN . . . . . DISCLAIMER CLIENT ISSUE PROJECT NO.
. . . . . Copyright by Urbis Pty Ltd. This drawing or parts thereof may not be reproduced FOR OPW P0003847
for any purpose or used for another project without the consent of Urbis other than
FOR LENDLEASE ON
SUNRISE - GRASSTREE COURT LP
LP
EP
WMr
WMr
EP
.
.
.
.
.
.
.
.
.
.
reproduction for the purposes of actual ordering, supply, installation or construction.
This drawing must be read in conjunction with all relevant contracts, schedules,
BEHALF OF BLUECARE
SCALE NORTH
. . . . .
.
WMr
EP
LP
WMr
specifications, drawings and any other issued written instructions. Do not scale 1:200 @ A1 1:400 @ A3
D FOR OPW EL GP 02.11.2023 from drawings. Written figured dimensions take preference to scaled dimension
2 4 6 8 10 m
. C FOR OPW AB GP 02.08.2023 and must be verified on site before proceeding with any work. All discrepancies
. B FOR OPW CF SM 10.06.2022 must be referred to the superintendent for a written decision prior to ordering, DRAWING TITLE DRAWING NO. REVISION
supply or installation. Urbis must be notified in writing of any discrepancies.
A FOR OPW SM SM 06.04.2024
Level 7, 123 Albert Street | Brisbane QLD 4000 Australia | +61 7 3007 3800 | URBIS Pty Ltd | ABN 50 105 256 228 REV DESCRIPTION DWN CHK DATE PROJECT DIRECTOR: . FINISHES PLAN 201-FI D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.