Skip to the record
Search everything, all in one place.

Original source · versioned page text

Amended Stormwater Plan

Attached to the e-mail Information Request Response REC16/0014.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SITE BASED STORMWATER MANAGEMENT PLAN
                   For
     Elkhorn Investments (QLD) Pty Ltd


         Proposed Sub-division at
             28 Elkhorn Drive,
                 Tewantin




             Job Ref: SC- 5551


                Revision C
Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 38 pages

Page 2

SC5551 - 28 Elkhorn Dr, Tewantin                                                                       1



                                 AUTHORSHIP INFORMATION

                                               Site Based Stormwater
                          REPORT TITLE
                                               Management Plan
                          Affected
                          Properties
                          Street Address       28 Elkhorn Drive, Tewantin

                          RP Description       Lot 70 M37807
                          Prepared For         Elkhorn Investments (QLD) Pty Ltd
                          Date                 March 2016
                          Report Status        For DA Approval
                          Prepared By
                          Name                 Matt Johnson
                          Qualifications       BE (Civil)
                          Company              Empire Engineering Pty Ltd
                          Phone Number         07 5477 6437
                          Reviewed By
                          Name                 Sean Dwyer
                          Qualifications       BE (Civil)
                          Approved By
                          Name                 Troy Paulsen
                          Qualifications       BE (Civil), CPEng, RPEQ 6990




                          REVISION         DATE               Reviewed/ Approval

                                 A         21.03.16                T.Paulsen

                                 B         06.06.16                T.Paulsen

                                 C         26.10.16




Document Qualifying and Ownership Statement:
The contents of this document represent an assessment of the facts and circumstances pertaining to this
matter, as they are known to the writer at the time of preparation. It is possible that upon completion and
distribution of this document further information may come to hand that impact upon the findings,
recommendations or conclusions drawn in this document. This document and its contents remains the
property of Empire Engineering and cannot be reproduced in whole or in part for any reasons that could be
considered to be outside the exact, intended original use of this document.

Page 3

SC5551 - 28 Elkhorn Dr, Tewantin                                                                                                           2




                                                TABLE OF CONTENTS

1.0      Introduction ............................................................................................................. 3
   1.1        Background ......................................................................................................... 3
   1.2        Scope .................................................................................................................. 3
   1.3        Existing Topography ............................................................................................ 3
   1.4        Proposed Development........................................................................................ 4
2.0      Water Cycle Management ....................................................................................... 5
   2.1        Background ......................................................................................................... 5
   2.2        Wastewater Minimisation ..................................................................................... 5
   2.3        Stormwater Harvesting Tanks .............................................................................. 5
3.0      Water Quality Management .................................................................................... 6
   3.1        Background ......................................................................................................... 6
   3.2        Construction Phase.............................................................................................. 6
   3.3        Operational Phase ............................................................................................... 7
      3.3.1      Water Quality Objectives.................................................................................. 7
      3.3.2      Pollutant Export Modelling ............................................................................... 7
      3.3.2.1        Rainfall Data................................................................................................ 8
      3.3.2.2        Treatment Nodes ......................................................................................... 9
      3.3.3      Effectiveness in Pollution Reduction................................................................. 9
4.0      Stormwater Quantity Management....................................................................... 10
   4.1        Background ....................................................................................................... 10
   4.2        Site Drainage Constraints and Opportunities ...................................................... 10
      4.2.1      Drainage Constraints ..................................................................................... 10
      4.2.2      Drainage Opportunities .................................................................................. 10
   4.3        Modelling Overview............................................................................................ 12
      4.3.1      Methodology .................................................................................................. 12
      4.3.2      Catchment Areas ........................................................................................... 12
      4.2.1      Peak Flow Rates ........................................................................................... 14
5.0      Conclusions .......................................................................................................... 16
APPENDIX A – STORMWATER MANAGEMENT PLAN..................................................... 17
APPENDIX B – STORMWATER QUALITY MUSIC MODELLING ....................................... 18
APPENDIX C – RATIONAL METHOD CALUCATIONS ...................................................... 21
APPENDIX D – WATER SENSITIVE DESIGN CODE ASSESSMENT ................................ 22

Page 4

SC5551 - 28 Elkhorn Dr, Tewantin                                                                          3




1.0 Introduction

1.1      Background
This report is to accompany and be considered part of an application to Noosa Council for a proposed sub-
division at 28 Elkhorn Dr, Tewantin.


1.2      Scope
Empire Engineering Pty Ltd was commissioned by Elkhorn Investments (QLD) Pty Ltd to develop a site based
Stormwater Management Plan (SWMP) to outline water management strategies for the proposed development
that will comply with Council’s relevant planning scheme policies, Queensland Development Code and the
Environmental Protection Act (1994) and associated Environmental Protection (Water) Policy 1997.


This report presents the results of a SWMP and outlines the proposed measures to be adopted in relation to
stormwater quality management and stormwater quantity management for the subject site and the proposed
development.


1.3      Existing Topography
The subject site is described as Lot 70 M37807 with a combined area of 12,938m2. The site is bounded by
Elkhorn Drive and existing residential allotments to the south, existing residential allotments to the west and
north, and Noosa River Esplanade to the east. The site is currently occupied by a single residential house with
an associated shed. The remainder of the lot is covered in grass and tree/shrubbery. See Figure 1.1.

Page 5

SC5551 - 28 Elkhorn Dr, Tewantin                                                                     4




                            Subject Site:
                           28 Elkhorn Dr,
                              Tewantin


                                                                                                N

                                            Figure 1.1 Subject Site


The site has a crest approximately 45m off the eastern boundary on the southern end of the site, to
approximately 25m off the eastern boundary at the northern end of the site. This crest is at approximately
RL10.25. The site falls to the west at approximately 2.5% grade to almost RL8.25 in the south-western
corner. The site also falls to the east at approximately 18% to RL2.00 in the south-eastern corner. Under
existing conditions rainfall sheet flows from the site’s crest into either the Noosa River or the adjacent
residential property.


1.4      Proposed Development
Preliminary drawings prepared by KHA Development Managers depict a proposed 11 lot residential sub-
division and associated road.

Page 6

SC5551 - 28 Elkhorn Dr, Tewantin                                                                           5




2.0 Water Cycle Management

2.1      Background
The purpose of this section of the SWMP is to outline water saving measures that will be implemented in
the design and construction of the proposed development.


2.2      Wastewater Minimisation
To reduce the impact of water demand from the development and to minimise the loading on the existing
sewerage network, it is intended to reduce the wastewater leaving the site through the use of “at source”
measures. This will include:
         Water saving shower roses with a AAA rating or better
         Dual flush toilet cisterns that do not exceed 6 litres on full flush and 3 litres on half flush
         The use of 3 star (or higher) water efficient appliances


2.3      Stormwater Harvesting Tanks
The developer has not opted in to stormwater harvesting tanks.

Page 7

SC5551 - 28 Elkhorn Dr, Tewantin                                                                       6




3.0 Water Quality Management
3.1      Background
A requirement of the proposed development is that Stormwater quality treatment shall be provided to meet
the design objectives set out in Section 2.4 of DERM’s Urban Stormwater Quality Planning guidelines 2010
and the associated with State Planning Policy (SPP) 4/10 Healthy Waters. The scope typically
encompasses the ‘post construction’ phase of the development however ‘construction phase’ water quality
is briefly addressed.


3.2      Construction Phase
Table 3.1 has been adapted from Table C4.1 of Brisbane City Council’s (BCC) Stormwater Best
Management Practices 2000 and details the typical stormwater pollutants which may be generated during
the construction phase of the development.


                      Pollutant                                     Sources

                         Litter                  Paper, construction packaging, food packaging,
                                                            cement bags and off-cuts

                     Sediment                   Unprotected exposed soils and stockpiles during
                                                            earthworks and building

                  Hydrocarbons                Fuel and oil spills, leaks from construction equipment

                  Toxic Materials            Cement slurry, solvents, cleaning agents, wash waters

             pH Altering Substances                       Cement slurry, wash waters

                                   Table 3.1 –Typical Construction Phase Pollutants



         The following measures should typically be implemented prior to the commencement of
         construction:

                  Education of all site workers in sediment and erosion procedures

                  Specified storage areas for construction materials and plant that are bunded to prevent
                  any spillages from escaping

Page 8

SC5551 - 28 Elkhorn Dr, Tewantin                                                                     7


During the construction phase of the development, silt fences should be erected downstream of all
disturbed areas. In addition erosion and sediment control devices should be regularly inspected and
maintained following storm events. An Erosion and Sediment Control Plan will be provided as part of the
operational works application.



3.3      Operational Phase
During the operational stage of the development, the following impacts have been identified in relation to
stormwater runoff and water quality of the receiving waterways:
         Gross pollutants which include human derived litter, course sediment and vegetation
         Sediment and suspended solids
         Nutrients such as phosphorous and nitrogen
To target these potential pollutants stormwater quality improvement devices (SQID’s) are proposed to be
incorporated within the design.


3.3.1    Water Quality Objectives
The water quality objectives (WQO’s) for this site were determined in accordance with Appendix 2 of the
State Planning Policy (SPP) Dec 2013.


Table 3.2 indicates the minimum load reduction targets required to be met:


                                   Pollutant               Minimum Reduction Targets

                     Total Suspended Sediments (TSS)                   80%

                            Total Phosphorus (TP)                      60%

                              Total Nitrogen (TN)                      45%

                           Gross Pollutants (>5mm)                     90%

                                         Table 3.2 - Water Quality Objectives



3.3.2    Pollutant Export Modelling
The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) has been utilised to calculate
pollutant loads from the proposed development and to predict performance characteristics of the proposed
treatment train. The pollutants have been generated stochastically and modelling parameters used were
adopted from the Water by Design “Music Modelling Guidelines for South-East Queensland”, and the
updated MUSIC Version 5 recommended parameters for Bio-retention basin nodes. MUSIC modelling
setup and results are attached within Appendix B.

Page 9

SC5551 - 28 Elkhorn Dr, Tewantin                                                                                 8




Under the proposed conditions, the site was ‘split’ into three land use catchment nodes; the roofed area,
driveways and ground level uses. The pollutant export parameters utilised were based on the Urban
Residential pollutant loads, refer Table 3.3 & 3.4.


                       Parameter                                                      Value
                Rainfall threshold (mm)                                                1
              Soil storage capacity (mm)                                              500
              Initial storage (% capacity)                                             10
                  Field capacity (mm)                                                 200
          Infiltration capacity coefficient (a)                                       211
           Infiltration capacity exponent (b)                                          5.0
                   Initial depth (mm)                                                  50
                Daily recharge rate (%)                                                28
                Daily baseflow rate (%)                                                27
             Daily deep seepage rate (%)                                               0
                        Table 3.3 – Rainfall-runoff Parameters Adopted (Urban Residential)



                                              TSS Log                 TP Log                         TN Log
 Flow Type       Surface Type
                                      Mean        Std Dev.    Mean        Std Dev.            Mean       Std Dev.
                      Roof              N/A         N/A        N/A             N/A            N/A             N/A
  Baseflow
                   Driveways            1.00        0.34      -0.97            0.31           0.20            0.20
Parameters
                 Ground Level           1.00        0.39      -0.97            0.31           0.20            0.20
                      Roof              1.30        0.39      -0.89            0.31           0.26            0.23
 Stormflow
                   Driveways            2.43        0.39      -0.30            0.31           0.26            0.23
Parameters
                 Ground Level           2.18        0.39      -0.47            0.31           0.26            0.23
                         Table 3.4 – Pollutant Export Values Adopted (Urban Residential)



3.3.2.1 Rainfall Data
Rainfall data for the site was chosen to give the best representation of actual conditions. A time period of
10 years between 1973 and 1983 was selected from the Cooroy Composite station, using a six minute time
step.

Page 10

SC5551 - 28 Elkhorn Dr, Tewantin                                                                        9




3.3.2.2 Treatment Nodes
The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s
before discharging into the Elkhorn Drive drainage system.


    Bio-Retention Basin – An area of 70m2 designated Bio-retention to treat road, landscape, and roof
    catchments to achieve the WQO’s was modelled. An extended detention depth of 200mm with a filter
    media of 200mm/hr sandy loam hydraulic conductivity has been modelled. The location of this device
    is shown on the attached Appendix A.



3.3.3    Effectiveness in Pollution Reduction
The water quality development model was set up with the incorporation of the above devices to reduce
pollutant export to WQO levels. Table 3.5 indicates the predicted pollutant mean values of stormwater
discharged from the site as calculated by MUSIC:


                                   Pollutant                 Percentage Load Reduction

                        Total Suspended Solids (TSS)                  82.8%

                            Total Phosphorus (TP)                     62.4%

                              Total Nitrogen (TN)                     49.9%

                           Gross Pollutants (>5mm)                     100%

                                   Table 3.5 - Flow Based Pollutant Load Reduction



The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP
and TN generated by stormwater runoff in accordance with the targets required under the water quality
objectives stated previously.

Page 11

SC5551 - 28 Elkhorn Dr, Tewantin                                                                     10



4.0 Stormwater Quantity Management
4.1      Background
The proposed sub-division and associated increase in impervious areas has the potential to create or
exacerbate drainage problems to downstream areas and/or drainage infrastructure. The purpose of this
section of the SWMP is to determine the general requirements for bulk stormwater management for the
proposed development. The design shall ensure that rainfall event discharges are conveyed from the site
in a manner that complies with Council’s stormwater planning guidelines and does not result in a worsened
drainage situation to downstream infrastructure, without causing a nuisance or annoyance to
residents/property owners.


Under existing conditions the subject site has a catchment crest beginning approximately 88m east off the
south-western corner, to approximately 36m east off the north-western corner. The western portion of the
catchment sheet flows over the west boundary into the neighbouring lot. The eastern portion of the
catchment sheet flows east into Noosa River Esplanade. Refer to Figure 4.1 on the following page.


4.2      Site Drainage Constraints and Opportunities
4.2.1    Drainage Constraints
No lawful point of discharge exists to the downstream western or eastern properties. Earthworks to the
western boundary to achieve grade out to the new road must be minimised to avoid large height retaining
walls.


4.2.2    Drainage Opportunities
It is proposed to discharge all roof areas to a lawful point of discharge (the new road kerb and channel),
and the new road will provide a formal underground drainage downstream to an existing connection in
Elkhorn Drive. Ground areas of Lots 1-5 will sheet flow over the western boundary, and ground areas of
Lots 6-11 will sheet flow into the new road. The drainage system from Elkhorn Drive to Noosa River
Esplanade will be upgraded to cater for the proposed development. This proposal will ensure a situation of
non-worsening discharge to the downstream boundary conditions.

Page 12

SC5551 - 28 Elkhorn Dr, Tewantin                                              11




                                                  SITE




                                                              FALL
                                           FALL




                                                                          N



                                   Figure 4.1 – Existing Drainage Paths


[OCR of page images]
11

 

 

$C5551 - 28 Elkhorn Dr, Tewantin

Figure 4.1 — Existing Drainage Paths

 

Page 13

SC5551 - 28 Elkhorn Dr, Tewantin                                                                      12



4.3      Modelling Overview
4.3.1    Methodology
A Rational Method calculation was conducted to determine that a situation of non-worsening could be
achieved to the downstream (east and west) boundary conditions. The results from a Rational Method
calculation are illustrated in Table 4.3. Full Rational Method calculations have been provided in Appendix
C. Table 4.2 illustrates a large portion of the proposed development will discharge to the existing Elkhorn
Drive drainage system. This is proposed to be upgraded in order to cater for the additional catchment. The
proposed upgrade has been provided in Appendix A.


4.3.2    Catchment Areas
Pre-development and Post-development catchment areas have been provided in Appendix A and below in
Table 4.1 and 4.2. The catchment areas have been significantly reduced for the western boundary
compared to the pre-development scenario. The eastern boundary catchment has remained the same
compared to the pre-development scenario. An additional catchment to Elkhorn Drive is proposed,
requiring upgrades as discussed previously.

           Catchment Name          Description                  % Impervious      Area (Ha)

                                   Roof                         100               0.020
           ‘A’
                                   Landscape                    0                 0.302

           ‘B’                     Landscape                    0                 0.136

           ‘C’                     Landscape                    0                 0.115

           ‘D’                     Landscape                    0                 0.094

           ‘E’                     Landscape                    0                 0.153

           ‘F’                     Landscape                    0                 0.076

           Western Boundary Total Catchment (ha)                2                 0.897

                                   Roof                         100               0.032
           ‘G’
                                   Landscape                    0                 0.366

           Eastern Boundary Total Catchment (ha)                0                 0.398
                               Table 4.1 – Pre-Development Catchment Areas

Page 14

SC5551 - 28 Elkhorn Dr, Tewantin                                                      13




           ‘A’                     Roof                       100             0.018
           ‘B’                     Roof                       100             0.018
           ‘C’                     Roof                       100             0.018
           ‘D’                     Roof                       100             0.018
           ‘E’                     Roof                       100             0.018
                                   Roof                       100             0.018
           ‘F’                     Hardstand                  100             0.030
                                   Landscape                  0               0.012
                                   Roof                       100             0.018
           ‘H’                     Hardstand                  100             0.030
                                   Landscape                  0               0.012
                                   Roof                       100             0.018
           ‘I’                     Hardstand                  100             0.030
                                   Landscape                  0               0.012
                                   Roof                       100             0.020
           ‘J’
                                   Landscape                  0               0.071
                                   Roof                       100             0.018
           ‘K’                     Hardstand                  100             0.014
                                   Landscape                  0               0.008
                                   Roof                       100             0.018
           ‘L’                     Hardstand                  100             0.015
                                   Landscape                  0               0.011
                                   Road                       100             0.118
           ‘M’
                                   Landscape                  0               0.078
           Elkhorn Dr Total Catchment (Ha)                    70              0.641
                                   Roof                       100             0.032
           ‘G’
                                   Landscape                  0               0.366
           Eastern Boundary Total Catchment (Ha)              8               0.398
                               Table 4.2 – Post-Development Catchment Areas

Page 15

SC5551 - 28 Elkhorn Dr, Tewantin                                                                   14




           Catchment Name          Description                % Impervious       Area (Ha)

                                   Hardstand                  100                0.046
           ‘A’
                                   Landscape                  0                  0.016

                                   Hardstand                  100                0.043
           ‘B’
                                   Landscape                  0                  0.015

                                   Hardstand                  100                0.039
           ‘C’
                                   Landscape                  0                  0.015

                                   Hardstand                  100                0.031
           ‘D’
                                   Landscape                  0                  0.012

                                   Hardstand                  100                0.030
           ‘E’
                                   Landscape                  0                  0.012

           Western Boundary Total Catchment (Ha)              70                 0.259
                         Table 4.2 – Post-Development Catchment Areas (Cont’d)


4.2.1    Peak Flow Rates
The results in Table 4.3 & 4.4 demonstrate that a situation of non-worsening can be achieved to both the
east and west downstream boundary conditions. Refer to Appendix A for details.

Page 16

SC5551 - 28 Elkhorn Dr, Tewantin                                                                15



                                                                                3
  Storm                                    Flow Rate to Catchment Boundary (m /s)
  Event                                                Western                              Eastern
                   ‘A’              ‘B’         ‘C’              ‘D’     ‘E’         ‘F’      ‘G’
39% AEP           0.039            0.016       0.014         0.012      0.019       0.01     0.066
  Q2 ARI
18% AEP           0.052            0.022       0.019         0.016      0.026       0.014    0.089
  Q5 ARI
10% AEP           0.072            0.03        0.026         0.022      0.036       0.019    0.123
 Q10 ARI
 5% AEP           0.084            0.035       0.031         0.026      0.042       0.022    0.144
 Q20 ARI
 2% AEP           0.101            0.042       0.037             0.03   0.05        0.027    0.172
 Q50 ARI
 1% AEP           0.128            0.053       0.047         0.039      0.064       0.034    0.217
Q100 ARI
                                    Table 4.3 – Pre-Development Peak Flow

                                                                                3
  Storm                                    Flow Rate to Catchment Boundary (m /s)
  Event                                                Western                              Eastern
                   ‘A’              ‘B’         ‘C’              ‘D’     ‘E’         ‘F’      ‘G’
39% AEP           0.015            0.012        0.01         0.005      0.01         0       0.059
  Q2 ARI
18% AEP            0.02            0.016       0.013         0.006      0.014        0       0.08
  Q5 ARI
10% AEP           0.028            0.021       0.018         0.009      0.019        0       0.111
 Q10 ARI
 5% AEP           0.033            0.025       0.021             0.01   0.022        0       0.129
 Q20 ARI
 2% AEP           0.041            0.032       0.027             0.01   0.028        0       0.154
 Q50 ARI
 1% AEP           0.054            0.042       0.036             0.01   0.038        0       0.195
Q100 ARI
                                    Table 4.4 – Post-Development Peak Flow

Page 17

SC5551 - 28 Elkhorn Dr, Tewantin                                                                      16




5.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies the acceptable solutions set out in Councils planning
scheme policies.


         Wastewater minimisation strategies will be adopted to reduce the demand on Council’s existing
         infrastructure,
         Best practice and practical water quality improvement devices are proposed which include a Bio-
         retention Basin areas totalling 70m 2,
         A situation of non-worsening can be achieved to the downstream boundary conditions. This is
         achieved by reducing the existing catchment areas to the west, maintaining existing conditions to
         the east, and providing a formal underground drainage system to an existing manhole in Elkhorn
         Drive. The existing manhole in Elkhorn Drive to the outlet into Noosa River Esplanade will require
         upgrading to cater for the additional catchment.

Page 18

SC5551 - 28 Elkhorn Dr, Tewantin                      17




            APPENDIX A – STORMWATER MANAGEMENT PLAN


[OCR of page images]
$C5551 - 28 Elkhorn Dr, Tewantin

17

 

APPENDIX A — STORMWATER MANAGEMENT PLAN

 

Page 19

                                                                                                                                                                 LEGEND




SECTION




                                          CONCEPT STORMWATER MANAGEMENT PLAN

                                            Bundaberg                              Gladstone                              Sunshine Coast
          EMP RE
          ENGINEERING
                                            9 Princess Street Bundaberg Qld
                                            PO Box 2052 Bundaberg Qld 4670
                                            T: 07 4154 4894 F: 07 4154 4274
                                            E: [email protected]
                                                                                   4 Goondoon Street Gladstone Qld
                                                                                   PO Box 1743 Gladstone DC Qld 4680
                                                                                   T: 07 4972 5387
                                                                                   E: [email protected]
                                                                                                                          45 Brisbane Road Mooloolaba Qld
                                                                                                                          PO Box 102 Mooloolaba Qld 4557
                                                                                                                          T: 07 5477 6437 F: 07 5444 4216
                                                                                                                          E: [email protected]
          ACN 112761510 ABN 21112761510

Page 20

                                                                                                                                                                       LEGEND




                                                                                                                                                             SW
                                                                                                                                                                  SW
                                                                                                                                                        SW




                                STORMWATER DRAINAGE NETWORK UPGRADES

                                   Bundaberg                              Gladstone                              Sunshine Coast
EMP RE
ENGINEERING
                                   9 Princess Street Bundaberg Qld
                                   PO Box 2052 Bundaberg Qld 4670
                                   T: 07 4154 4894 F: 07 4154 4274
                                   E: [email protected]
                                                                          4 Goondoon Street Gladstone Qld
                                                                          PO Box 1743 Gladstone DC Qld 4680
                                                                          T: 07 4972 5387
                                                                          E: [email protected]
                                                                                                                 45 Brisbane Road Mooloolaba Qld
                                                                                                                 PO Box 102 Mooloolaba Qld 4557
                                                                                                                 T: 07 5477 6437 F: 07 5444 4216
                                                                                                                 E: [email protected]
ACN 112761510 ABN 21112761510

Page 21

                                                                                                                                                     LEGEND




                                PRE-DEVELOPMENT CATCHMENT PLAN

                                Bundaberg                              Gladstone                              Sunshine Coast
EMP RE
ENGINEERING
                                9 Princess Street Bundaberg Qld
                                PO Box 2052 Bundaberg Qld 4670
                                T: 07 4154 4894 F: 07 4154 4274
                                E: [email protected]
                                                                       4 Goondoon Street Gladstone Qld
                                                                       PO Box 1743 Gladstone DC Qld 4680
                                                                       T: 07 4972 5387
                                                                       E: [email protected]
                                                                                                              45 Brisbane Road Mooloolaba Qld
                                                                                                              PO Box 102 Mooloolaba Qld 4557
                                                                                                              T: 07 5477 6437 F: 07 5444 4216
                                                                                                              E: [email protected]
ACN 112761510 ABN 21112761510

Page 22

                          PRE-DEVELOPMENT DRAINAGE LONGITUDINAL SECTION




                                Bundaberg                              Gladstone                              Sunshine Coast
EMP RE
ENGINEERING
                                9 Princess Street Bundaberg Qld
                                PO Box 2052 Bundaberg Qld 4670
                                T: 07 4154 4894 F: 07 4154 4274
                                E: [email protected]
                                                                       4 Goondoon Street Gladstone Qld
                                                                       PO Box 1743 Gladstone DC Qld 4680
                                                                       T: 07 4972 5387
                                                                       E: [email protected]
                                                                                                              45 Brisbane Road Mooloolaba Qld
                                                                                                              PO Box 102 Mooloolaba Qld 4557
                                                                                                              T: 07 5477 6437 F: 07 5444 4216
                                                                                                              E: [email protected]
ACN 112761510 ABN 21112761510

Page 23

                                                                                                                                                                    LEGEND




                                                                                                                                                          SW
                                                                                                                                                               SW
                                                                                                                                                     SW




                                POST-DEVELOPMENT CATCHMENT PLAN

                                Bundaberg                              Gladstone                              Sunshine Coast
EMP RE
ENGINEERING
                                9 Princess Street Bundaberg Qld
                                PO Box 2052 Bundaberg Qld 4670
                                T: 07 4154 4894 F: 07 4154 4274
                                E: [email protected]
                                                                       4 Goondoon Street Gladstone Qld
                                                                       PO Box 1743 Gladstone DC Qld 4680
                                                                       T: 07 4972 5387
                                                                       E: [email protected]
                                                                                                              45 Brisbane Road Mooloolaba Qld
                                                                                                              PO Box 102 Mooloolaba Qld 4557
                                                                                                              T: 07 5477 6437 F: 07 5444 4216
                                                                                                              E: [email protected]
ACN 112761510 ABN 21112761510

Page 24

                                                    POST-DEVELOPMENT DRAINAGE LONGITUDINAL SECTION




                                Bundaberg                              Gladstone                              Sunshine Coast
EMP RE
ENGINEERING
                                9 Princess Street Bundaberg Qld
                                PO Box 2052 Bundaberg Qld 4670
                                T: 07 4154 4894 F: 07 4154 4274
                                E: [email protected]
                                                                       4 Goondoon Street Gladstone Qld
                                                                       PO Box 1743 Gladstone DC Qld 4680
                                                                       T: 07 4972 5387
                                                                       E: [email protected]
                                                                                                              45 Brisbane Road Mooloolaba Qld
                                                                                                              PO Box 102 Mooloolaba Qld 4557
                                                                                                              T: 07 5477 6437 F: 07 5444 4216
                                                                                                              E: [email protected]
ACN 112761510 ABN 21112761510

Page 25

SC5551 - 28 Elkhorn Dr, Tewantin                18




    APPENDIX B – STORMWATER QUALITY MUSIC MODELLING


[OCR of page images]
$C5551 - 28 Elkhorn Dr, Tewantin 18

 

APPENDIX B —- STORMWATER QUALITY MUSIC MODELLING

 

Page 26

SC5551 - 28 Elkhorn Dr, Tewantin                                                  19




                                   Figure B.1 – MUSIC Model Node Layout




                         Figure B.2 – MUSIC Model Treatment Train Effectiveness

Page 27

SC5551 - 28 Elkhorn Dr, Tewantin                                               20




                               Figure B.3 – MUSIC Model ‘Bio-retention’ Node


[OCR of page images]
$C5551 - 28 Elkhorn Dr, Tewantin

20

 

| Inlet Properties
Low Flow By-pass (cubic metres per sec)
High Flow By-pass (cubic metres per sec)

 

;~ Storage Properties
Extended Detention Depth (metres)
Surface Area (square metres)

 

Filter and Media Properties

Filter Area (square metres)

Unlined Filter Media Perimeter (metres)
Saturated Hydraulic Conductivity (mm/hour)
Filter Depth (metres)

TN Content of Filter Media (mg/kg)
Orthophosphate Content of Filter Media (mg/kg)

epee Pe
Is Base Lined? (¥] Yes [7] No

 

‘Vegetation Properties
© Vegetated with Effective Nutrient Removal Plants

© Vegetated with Ineffective Nutrient Removal Plants

© Unvegetated

 

 

—Infitration Properties
Egittration Rate (mm/hr)

 

Outlet Properties

Overflow Weir Width (metres) 2.40

Underdrain Present? Yes [|] No
Yes No

0.00

 

 

 

 

ce Lae J

 

 

| cance || <Back || W Brish |

Figure B.3 — MUSIC Model ‘Bio-retention’ Node

 

 

Page 28

SC5551 - 28 Elkhorn Dr, Tewantin                        21




             APPENDIX C – RATIONAL METHOD CALUCATIONS


[OCR of page images]
$C5551 - 28 Elkhorn Dr, Tewantin

21

 

APPENDIX C — RATIONAL METHOD CALUCATIONS

 

Page 29

                                                           Catchment (A) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         17.8       5                                       n                    0.045
                                                                     L                        88
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            17.8       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            77.23  129.00
    2            98.15  164.00
    5           121.44  202.00
   10           134.68  223.00
   20           153.04  253.00
   50           177.07  291.00
   100          195.27  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)       0.3224  0.0801                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0     0.8
C10                 0.7    0.86               ARI          Frequency factor (Fy)
C1               0.560   0.688                         1         0.8
C2               0.595   0.731                         2        0.85
C5               0.665   0.817                         5        0.95
C10              0.700   0.860                        10           1
C20              0.735   0.903                        20        1.05
C50              0.805   0.989                        50        1.15
C100             0.840   1.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               Roof 180m2               Post (Minus Roof)          % Change to Boundary
     1          0.039      0.020                0.005                      0.015                   -87.8%
     2          0.052      0.027                0.006                      0.020                   -87.8%
     5          0.072      0.037                0.009                      0.028                   -88.1%
    10          0.084      0.043                0.010                      0.033                   -88.5%
    20          0.101      0.051                0.010                      0.041                   -84.7%
    50          0.128      0.064                0.010                      0.054                   -81.1%
   100          0.147      0.071                0.010                      0.061                   -82.1%

Page 30

                                                           Catchment (B) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         17.6       5                                       n                    0.045
                                                                     L                        85
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            17.6       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            76.04  129.00
    2            96.64  164.00
    5           119.58  202.00
   10           132.63  223.00
   20           150.71  253.00
   50           174.38  291.00
   100          192.31  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)       0.1361  0.0656                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0     0.8
C10                 0.7    0.86               ARI          Frequency factor (Fy)
C1               0.560   0.688                         1         0.8
C2               0.595   0.731                         2        0.85
C5               0.665   0.817                         5        0.95
C10              0.700   0.860                        10           1
C20              0.735   0.903                        20        1.05
C50              0.805   0.989                        50        1.15
C100             0.840   1.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               Roof 180m2               Post (Minus Roof)          % Change to Boundary
     1          0.016      0.016                0.005                      0.012                   -33.1%
     2          0.022      0.022                0.006                      0.016                   -33.1%
     5          0.030      0.030                0.009                      0.021                   -33.5%
    10          0.035      0.035                0.010                      0.025                   -34.0%
    20          0.042      0.042                0.010                      0.032                   -28.0%
    50          0.053      0.052                0.010                      0.042                   -22.3%
   100          0.061      0.058                0.010                      0.048                   -23.0%

Page 31

                                                           Catchment (C) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         16.9       5                                       n                    0.045
                                                                     L                        75
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            16.9       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            79.14  129.00
    2           100.57  164.00
    5           124.43  202.00
   10           137.99  223.00
   20           156.79  253.00
   50           181.40  291.00
   100          200.04  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)       0.1149   0.058                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0     0.8
C10                 0.7   0.86                ARI          Frequency factor (Fy)
C1               0.560   0.688                         1         0.8
C2               0.595   0.731                         2        0.85
C5               0.665   0.817                         5        0.95
C10              0.700   0.860                        10           1
C20              0.735   0.903                        20        1.05
C50              0.805   0.989                        50        1.15
C100             0.840   1.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               Roof 180m2               Post (Minus Roof)          % Change to Boundary
     1          0.014      0.014                0.005                      0.010                   -37.7%
     2          0.019      0.019                0.006                      0.013                   -37.7%
     5          0.026      0.027                0.009                      0.018                   -38.1%
    10          0.031      0.031                0.010                      0.021                   -38.6%
    20          0.037      0.037                0.010                      0.027                   -31.4%
    50          0.047      0.046                0.010                      0.036                   -24.7%
   100          0.054      0.052                0.010                      0.042                   -25.0%

Page 32

                                                           Catchment (D) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         16.5       5                                       n                    0.045
                                                                     L                        70
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            16.5       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            79.97  129.00
    2           101.64  164.00
    5           125.74  202.00
   10           139.43  223.00
   20           158.43  253.00
   50           183.30  291.00
   100          202.13  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)       0.0941  0.0482                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0     0.8
C10                 0.7    0.86               ARI          Frequency factor (Fy)
C1               0.560   0.688                         1         0.8
C2               0.595   0.731                         2        0.85
C5               0.665   0.817                         5        0.95
C10              0.700   0.860                        10           1
C20              0.735   0.903                        20        1.05
C50              0.805   0.989                        50        1.15
C100             0.840   1.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               Roof 180m2               Post (Minus Roof)          % Change to Boundary
     1          0.012      0.012                0.005                      0.007                   -47.2%
     2          0.016      0.016                0.006                      0.010                   -47.1%
     5          0.022      0.022                0.009                      0.013                   -47.5%
    10          0.026      0.026                0.010                      0.016                   -48.0%
    20          0.030      0.031                0.010                      0.021                   -38.8%
    50          0.039      0.039                0.010                      0.028                   -30.0%
   100          0.044      0.043                0.010                      0.033                   -29.6%

Page 33

                                                           Catchment (E) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         15.8       5                                       n                    0.045
                                                                     L                        62
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            15.8       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            81.45  129.00
    2           103.52  164.00
    5           128.06  202.00
   10           142.00  223.00
   20           161.34  253.00
   50           186.66  291.00
   100          205.83  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)       0.1532    0.06                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0     0.8
C10                 0.7   0.86                ARI          Frequency factor (Fy)
C1               0.560   0.688                         1         0.8
C2               0.595   0.731                         2        0.85
C5               0.665   0.817                         5        0.95
C10              0.700   0.860                        10           1
C20              0.735   0.903                        20        1.05
C50              0.805   0.989                        50        1.15
C100             0.840   1.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               Roof 180m2               Post (Minus Roof)          % Change to Boundary
     1          0.019      0.015                0.005                      0.010                   -62.7%
     2          0.026      0.020                0.006                      0.014                   -62.6%
     5          0.036      0.028                0.009                      0.019                   -63.0%
    10          0.042      0.032                0.010                      0.022                   -63.4%
    20          0.050      0.038                0.010                      0.028                   -57.0%
    50          0.064      0.048                0.010                      0.038                   -51.0%
   100          0.074      0.054                0.010                      0.044                   -51.4%

Page 34

                                                           Catchment (F) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing      Developed
Tc (mins)         13.9       5                                       n                    0.045
                                                                     L                        42
Therefore intensities (I) using Tc are as follows:                   S                       2.5
                                                                     Tc = (mins)            13.9       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1            86.29  129.00
    2           109.67  164.00
    5           135.65  202.00
   10           150.39  223.00
   20           170.87  253.00
   50           197.68  291.00
   100          217.97  321.00

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)        0.076       0                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0      0
C10                 0.7      0                ARI          Frequency factor (Fy)
C1               0.560   0.000                         1         0.8
C2               0.595   0.000                         2        0.85
C5               0.665   0.000                         5        0.95
C10              0.700   0.000                        10           1
C20              0.735   0.000                        20        1.05
C50              0.805   0.000                        50        1.15
C100             0.840   0.000                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               % Change to boundary
     1          0.010      0.000            n/A
     2          0.014      0.000            n/A
     5          0.019      0.000            n/A
    10          0.022      0.000            n/A
    20          0.027      0.000            n/A
    50          0.034      0.000            n/A
   100          0.039      0.000            n/A

Page 35

                                                           Catchment (G) Rational Method Analysis

                                                           Site Location:
                                                           Tewantin
Q = CIA/360                                                IFD data from BOM
Where:                                                     DURATION1 Year        2 years      5 years    10 years 20 years 50 years 100 years
Q = Flow rate (m3/s)                                       5Mins          129.00       164.00    202.00     223.00   253.00    291.00    321.00
C = Coefficient of discharge                               6Mins          121.00       154.00    189.00     210.00   238.00    275.00    302.00
I = average rainfall intensity (mm/hr)                     10Mins          99.30       126.00    156.00     173.00   196.00    227.00    250.00
A = area of catchment (ha)                                 20Mins          73.10        92.90    115.00     128.00   145.00    168.00    185.00
                                                           30Mins          59.70        76.00     94.20     105.00   119.00    138.00    152.00
I = Requires time of concentration (Tc)                    1Hr             40.40        51.60     64.70      72.30    82.70     96.30    107.00
Tc calculated by Friends Equation                          2Hrs            25.90        33.40     42.80      48.40    55.90     65.90     73.50
                                                           3Hrs            19.60        25.50     33.20      37.90    44.10     52.50     58.90
Friends Equation: Tc = (107nL0.333)/S0.2                   6Hrs            12.20        16.00     21.50      25.00    29.50     35.60     40.40
Where:                                                     12Hrs            7.72        10.20     14.10      16.60    19.90     24.30     27.90
n = Hortons surface roughness factor                       24Hrs            5.09         6.78       9.51     11.30    13.60     16.70     19.30
L = overland sheet flow path length                        48Hrs            3.37         4.51       6.38      7.61     9.18     11.40     13.10
S = slope of surface (%)                                   72Hrs            2.54         3.41       4.88      5.86     7.10      8.83     10.20


            Existing Developed                                                     Existing     Developed
Tc (mins)          8.3       5                                       n                    0.045
                                                                     L                       25
Therefore intensities (I) using Tc are as follows:                   S                       14
                                                                     Tc = (mins)            8.3       5.0 **Standard inlet time adopted
   ARI      Existing Developed
    1           106.99  106.99
    2           135.98  135.98
    5           167.93  167.93
   10           186.05  186.05
   20           211.29  211.29
   50           244.32  244.32
   100          269.30  269.30

1 hour 10 year intensity (1I10)=
       72.30
1
  I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)

            Existing Developed
Area (ha)        0.398   0.357                **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi                    0       0
C10                 0.7     0.7               ARI          Frequency factor (Fy)
C1               0.560   0.560                         1         0.8
C2               0.595   0.595                         2        0.85
C5               0.665   0.665                         5        0.95
C10              0.700   0.700                        10           1
C20              0.735   0.735                        20        1.05
C50              0.805   0.805                        50        1.15
C100             0.840   0.840                       100         1.2


Flow rates can then be calculated by Q = CIA/360:
                  Q (m3/s)
ARI        Existing Developed               % Change to Boundary
     1          0.066      0.059               -10.9%
     2          0.089      0.080               -10.9%
     5          0.123      0.111               -10.9%
    10          0.144      0.129               -10.9%
    20          0.172      0.154               -10.9%
    50          0.217      0.195               -10.9%
   100          0.250      0.224               -10.9%

Page 36

SC5551 - 28 Elkhorn Dr, Tewantin              22




APPENDIX D – WATER SENSITIVE DESIGN CODE ASSESSMENT


[OCR of page images]
$C5551 - 28 Elkhorn Dr, Tewantin 22

 

APPENDIX D — WATER SENSITIVE DESIGN CODE ASSESSMENT

 

Page 37

SC5551 - 28 Elkhorn Dr, Tewantin                                                                          23




                        column 1                                         column 2                                        Outcome
                    Specific Outcomes                     Probable solutions (if code assessable)                        Provided
  Water reuse                                            S1.1 Development complies with the water          S1.1 – Complies, refer SWMP
  O1 Development uses a combination of detention         quality standards in Table 2 of the SEQ
  and retention systems to capture run-off from areas
  on the site;                                           Regional Plan Implementation Guideline No.
  AND                                                    7 for Water Sensitive Urban Design;

  O2     Water storage devices must have sufficient
                                                         S2.1 No solution provided                         S2.1 – No stormwater harvesting is
  capacity having regard to local rainfall pattern and                                                     proposed due to type of development and
  the catchment area of roof or other hard standing                                                        Council preference

  surface;                                               S3.1 Captured water is plumbed to be
                                                                                                           S3.1 – No stormwater harvesting is
                                                         available for all external uses including
                                                                                                           proposed due to type of development and
  AND                                                    gardening, irrigation, ponds, filling swimming    Council preference
  O3 Captured water is utilised for all non-potable      pools and outdoor cleaning, as well as all
  uses on site;
                                                         ground floor toilet cisterns and washing
                                                         machine cold taps;

Page 38

SC5551 - 28 Elkhorn Dr, Tewantin                                                                       24



                        column 1                                       column 2                                        Outcome
                    Specific Outcomes                   Probable solutions (if code assessable)                        Provided
                                                       AND
                                                                                                        S3.2 – N/A
                                                       S3.2 Where the captured water is used for
  AND                                                  toilet flushing and/or laundry use, an
                                                       automatic or manual interchange device that
                                                       allows alternate use of captured water or the
                                                       reticulated water supply is installed to
                                                       ensure that there is a continual supply of
                                                       water for sanitary flushing and laundry use.

  O4     On-site detention does not adversely impact   S4.1 No solution provided                        S4.1 – Detention is not required due to
                                                                                                        proposed upgrades of the downstream
  on water requirements downstream of the site                                                          drainage network
  where the water is required to sustain the ecology
  and hydrology of downstream systems
  (environmental flows);
                                                                                                        S5.1 – N/A
  AND
  O5 Within the Shire Business Centre site, as         S5.1 No solution provided
  shown on Map SBC, on-site detention measures
  are contained within the developed areas of the
  site, clear of drainage lines and Open Space
  Precincts.

Page 39

SC5551 - 28 Elkhorn Dr, Tewantin                                                                          25


  Run-off treatment                                                                                        S6.1 & S7.1 - Complies, refer SWMP
  O6 Run-off that leaves the site is treated so as        S6.1 & S7.1 Development complies with the
  not to adversely impact on the ecology and
                                                          water quality standards in Table 2 of the
  hydrology of downstream environmental flows;
                                                          SEQ Regional Plan Implementation
  AND
                                                          Guideline No. 7 for Water Sensitive Urban
  O7     Within the Shire Business Centre site, as
                                                          Design.
  shown on Map SBC—
  a) run-off treatment occurs within the site ; and
  b) drainage lines are only used for final polishing
     of run-off.


  Town water supply connections                                                                            S8.1 – N/A
  O8 Backflow devices or similar systems ensure           S8.1 A suitable backflow prevention device
  water reuse facilities have no impact on the quality
  of the town mains water.                                is installed to protect the potable water
                                                          within the reticulated water supply in
                                                          accordance with AS/NZS 3500:2003
                                                          Plumbing and Drainage.
  Use of natural treatments and systems                                                                    S9.1 & S10.1 - Complies, refer SWMP
  O9 Natural treatment strategies, including grass        S9.1 & S10.1 Development complies with
  swales and bio-retention systems, vegetated
  filtration strips and gross pollutant traps, are used   the water quality standards in Table 2 of the
  wherever practicable;                                   SEQ Regional Plan Implementation
  AND
  O10 Within the Shire Business Centre, as shown          Guideline No. 7 for Water Sensitive Urban
  on Map SBC— where necessary, drainage lines are         Design.
  ecologically enhanced to ensure that the water
  quality polishing functions are of high standard.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.