Log in to see the plans as drawn Catchment (G) Rational Method Analysis
Site Location:
Tewantin
Q = CIA/360 IFD data from BOM
Where: DURATION1 Year 2 years 5 years 10 years 20 years 50 years 100 years
Q = Flow rate (m3/s) 5Mins 129.00 164.00 202.00 223.00 253.00 291.00 321.00
C = Coefficient of discharge 6Mins 121.00 154.00 189.00 210.00 238.00 275.00 302.00
I = average rainfall intensity (mm/hr) 10Mins 99.30 126.00 156.00 173.00 196.00 227.00 250.00
A = area of catchment (ha) 20Mins 73.10 92.90 115.00 128.00 145.00 168.00 185.00
30Mins 59.70 76.00 94.20 105.00 119.00 138.00 152.00
I = Requires time of concentration (Tc) 1Hr 40.40 51.60 64.70 72.30 82.70 96.30 107.00
Tc calculated by Friends Equation 2Hrs 25.90 33.40 42.80 48.40 55.90 65.90 73.50
3Hrs 19.60 25.50 33.20 37.90 44.10 52.50 58.90
Friends Equation: Tc = (107nL0.333)/S0.2 6Hrs 12.20 16.00 21.50 25.00 29.50 35.60 40.40
Where: 12Hrs 7.72 10.20 14.10 16.60 19.90 24.30 27.90
n = Hortons surface roughness factor 24Hrs 5.09 6.78 9.51 11.30 13.60 16.70 19.30
L = overland sheet flow path length 48Hrs 3.37 4.51 6.38 7.61 9.18 11.40 13.10
S = slope of surface (%) 72Hrs 2.54 3.41 4.88 5.86 7.10 8.83 10.20
Existing Developed Existing Developed
Tc (mins) 8.3 5 n 0.045
L 25
Therefore intensities (I) using Tc are as follows: S 14
Tc = (mins) 8.3 5.0 **Standard inlet time adopted
ARI Existing Developed
1 106.99 106.99
2 135.98 135.98
5 167.93 167.93
10 186.05 186.05
20 211.29 211.29
50 244.32 244.32
100 269.30 269.30
1 hour 10 year intensity (1I10)=
72.30
1
I10 used with Fraction impervious (Fi) to determine C10 then multiplied by Frequency factor (Fy)
Existing Developed
Area (ha) 0.398 0.357 **Note: C10 value derived for existing conditions as Intenisty, Area, and Flow were known values
Fi 0 0
C10 0.7 0.7 ARI Frequency factor (Fy)
C1 0.560 0.560 1 0.8
C2 0.595 0.595 2 0.85
C5 0.665 0.665 5 0.95
C10 0.700 0.700 10 1
C20 0.735 0.735 20 1.05
C50 0.805 0.805 50 1.15
C100 0.840 0.840 100 1.2
Flow rates can then be calculated by Q = CIA/360:
Q (m3/s)
ARI Existing Developed % Change to Boundary
1 0.066 0.059 -10.9%
2 0.089 0.080 -10.9%
5 0.123 0.111 -10.9%
10 0.144 0.129 -10.9%
20 0.172 0.154 -10.9%
50 0.217 0.195 -10.9%
100 0.250 0.224 -10.9%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.