Koala Tree Survey Plan_Issue C · 132008.176.06
Attached to the e-mail Minor Change - Conditions with SARA, Updated Plans & Remove Bus Stop - 132008.176.06.
Plans and drawings: the text below has words only, no drawings.
Table 1: General requirements and KTSP notes Table 4: Vegetation removal activity checklist KTSP05: Management
General Requirements for all Trees Activity Management Repsonse
Procedures
1. Appoint Project Arborist (AQF Level 5 minimum). Regular 1. Project Arborist to conduct regular inspection to ensure compliance with tree protection
2. All tree management and pruning works to be undertaken or supervised by Project Arborist with AQF Level inspections and measures outlined in this plan.
5 Arborist or equivalent qualification. monitoring 2. Project Arborist to issue notice of non-compliance to project manager for non-
3. Individual trees to be retained shall be prominently flagged or marked on site prior to the commencement conforming works and any remedial works to ensure compliance.
of any clearing or site works and confirmed at a pre-start meeting with a relevant Council officer. Vegetation 1. Vegetation works to be undertaken by suitably qualified arborist. Clearing of koala
4. Having regard to tree protection zones and construction access, TPZs are to be established around trees or removal and habitat trees is to be undertaken in way that complies with the sequential clearing
vegetation to be retained in accordance with the approved drawings and Australian Standard AS 4970-2009 mulching conditions outlined in the Nature Conservation (Koala) Conservation Plan 2017.
Protection of trees on development sites (Standards Australia 2009) including: 2. Where pruning is required, works are undertaken by a suitably qualified arborist and
a. Signage in accordance with AS 1319-1994 Safety signs for the occupational environment ; take place in accordance with:
b. Fencing in accordance with AS 4687-2007 Temporary fencing and hoardings . a. AS 4970-2009 Protection of trees on development sites .
5. The following activities are prohibited within pervious areas of the TPZ unless authorised by the Project
b. AS 4373-2007 Pruning of amenity trees .
Arborist/Council officers:
a. Storage of construction materials 3. All vegetation removed is to be mulched on-site.
b. Refuelling 4. Native vegetation mulch is to be stockpiled on-site.
c. Waste disposal
d. Excavation for silt fencing 5. Mulch stockpile(s) are to be located in existing cleared areas and outside of vegetation
e. Excavation for trenches protection areas.
f. Placement of fill 6. Mulch stockpiles are subject to erosion / sediment control.
g. Parking or traversing of vehicles 7. Exotic vegetation mulch is to be disposed of as green waste at landfill.
h. Preparation of chemicals
Registered 1. Licensed Wildlife Spotter Catcher to inspect site vegetation with arborist / contractor
i. Wash down/cleaning of equipment
Wildlife Spotter ahead of clearing to check for presence of fauna.
Catcher to 2. Non-itinerant fauna (other than koalas) are, where practicable, relocated / ushered to
General Notes:
supervise all treed areas around the site.
1. Vegetation conservation and removal will be in accordance with a Vegetation Management Plan and this vegetation 3. Vegetation containing koala(s) is to be demarcated with high visibility flagging tape
Koala Tree Survey Plan. clearing/removal and no further clearing is take place within 20m of the vegetation until such time as
koala(s) has completely vacated the vegetation and the site.
Injured wildlife 1. Immediately cease any activities, including clearing, which pose a threat to injured NOT FOR CONSTRUCTION
Table 2: Contact details for wildlife agencies observed wildlife until injured wildlife has been removed from the site.
2. Contact the applicable agency / group listed in Table 2 to remove the injured wildlife
from the site.
Agency/Group Description Contact number
Wildlife Care and Rehabilitation Centre, RSPCA hotline for matters relating to (07) 5442 8057 This drawing has been prepared by, or compiled from information provided by,
persons other than Litoria Consulting, who retain copyright and liability
Eumundi RSPCA wildlife management and injury. associated with their content:
Wildlife Noosa Rescue hotline for ill or injured animals 0419 046 999 Table 5: Construction management activity checklist
1. Nearmap 2024
in the greater Noosa region. 2. Site Plan - Proposed - Tree Survey (Richards & Spence, Drawing No. AR-
Activity Management Response 001.05, Rev. D, 20/01/2025)
Tree protection 1. Tree protection in accordance with: Litoria Consulting takes no responsibility for and makes no representations in
relation to the completeness, accuracy or quality of any information contained in
measures a. General requirements for all trees; and, this drawing. Each user of this drawing releases Litoria Consulting from all and
Table 3: Pre-construction activity checklist any loss, damage, cost, expense or liability in relation to the use of, or any
b. Specific requirements for individual trees. reliance on, this drawing or the information contained in it. Features on this plan
have been located to accuracy suitable for assessment and hence should not be
Regular 1. Project Arborist to conduct regular inspections to ensure compliance with tree used for exact measurements. Areas and dimensions shown are indicative only
Activity Timing Management Response
and subject to final survey. Users should independently verify the accuracy,
inspections and protection measures outlined in this plan. fitness for purpose and application of information contained in these drawings.
All site personnel Prior to 1. All site personnel sign a register noting that they have reviewed and
monitoring 2. Project Arborist to monitor and assess condition of trees and physical environment All written dimensions take precedence over scaled dimensions. The currency of
review plan commencement will comply with the requirements of the KTSP. these drawings should be checked prior to use. This drawing is provided only
throughout construction phase. for the information of the person or organisation to which Litoria Consulting
of works
3. Project Arborist to issue notice of non-compliance to project manager for non- provides it. It may not be provided to, or used by, any other person without
Tree protection Immediately prior 1. Mark trees to be removed. Litoria Consulting's prior written consent. Do not scale drawing. should
measures are to start
conforming works and any remedial works to ensure compliance. dimensions be conflicting or missing, notify litoria consulting and await further
2. Erect tree guards / vegetation protection barriers for retained trees Construction 1. The Project Arborist will monitor all works which occur within nominated TPZs to assess instruction.
erected for
where appropriate or indicated on Plan. works within impacts on retained trees.
retained trees © copyright - This document is and shall remain the property of litoria
3. Tree protection in accordance with: TPZs 2. Where excavation is required, less invasive methods such as directional drilling, tunnel consulting*. This document may only be used for the purpose for which it was
and all trees to
boring or vacuum excavation are to be utilised. commisioned and in accordance with the terms of the engagement for the
be removed are a. General requirements for all trees; and, commision. Unauthorised use of this document in any way is prohibited.
clearly marked 3. Where excavation is required, the project arborist shall supervise works and identify
b. Specific requirements for individual trees.
roots critical to tree stability – relocation or redesign of works may be necessary in some
4. Conduct pre-start meeting with Council officer to confirm 1 and 2 and 4. Where roots are exposed by excavation, temporary root protection is installed to Drawing Scale NA
other KTSP requirements. prevent dehydration and root moisture is maintained.
Inspection of site Immediately prior 1. Licensed Wildlife Spotter Catcher to inspect trees to be trimmed / 5. Where exposed roots require pruning, pruning cuts shall be made by the Project Drawn By FJ
prior to to start removed and identify hollows for retention / salvage, respectively. Arborist in accordance with procedures set out in: Issue C
vegetation 2. Non-itinerant fauna (other than koalas) are, where practicable, a. AS 4970-2009 Protection of trees on development sites.
removal by relocated / ushered to adjoining vegetation. DWG Ref. 22011 KTSP05
registered 3. Vegetation containing koala(s) is to be demarcated with high visibility b. AS 4373-2007 Pruning of amenity trees . Date Created 30/01/2025
Wildlife Spotter flagging tape and no further clearing is take place within 20m of the Scaffolding within 1. Avoid scaffolding within nominated TPZs.
Catcher vegetation until such time as koala(s) has completely vacated the TPZs
2. Where scaffolding is required within a TPZ, branch removal and ground protection
vegetation and the site.
occurs must be established in accordance with procedures set out in:
Erect temporary Prior to 1. Koala exclusion fencing is to be installed in accordance with
koala exclusion commencement Department of Transport and Main Roads (QLD) Standard Drawings.
a. AS 4970-2009 Protection of trees on development sites.
fencing around of works b. AS 4373-2007 Pruning of amenity trees .
2. Inspect koala exclusion fencing to ensure they are in good condition.
excavated pits
ABN: 75 100 511 689
lvl 3 22 wandoo st fortitude valley
po box 461 paddington qld 4064
p: +61 7 3852 4855 f: +61 7 3319 8953
e: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Koala Tree Survey Plan_Issue C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.