Council archive · source document
Attachment 1 - Amended Proposal Plans · MCU17/0073.01
Plans and drawings: the text below has words only, no drawings.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
A B C
17025
2700 190 2210 2018
04-02
2790 2018 2210 190 1210 1490 LEGEND
2890 2210 6825 2210 2890 AMENDMENT SCHEDULE
50
38 12000 12000 - Existing Enclosed Area
3
04-01 1 ISS DATE DESCRIPTION BY
05-01 1 23/06/17 CONSULTANT ISSUE RF
EX1
2 30/06/17 CONSULTANT ISSUE BB
2
- New Enclosed Area 3
4
14/07/17
30/01/18
CONSULTANT ISSUE
DA RFI RESPONSE
BB
BB
W New Garden W
1 G.06 G.07 1 5 15/05/18 DA RFI RESPONSE BB
6 01/11/18 PRELIMINARY ISSUE JM
D03 Ne
P1 w 7 21/01/20 CLIENT REVIEW RT
line of skylight above
G.03 Ga BO
Proposed D13 rde Existing garden & UN 8 03/02/20 CLIENT REVIEW JM
Footpath
VESTRY 1 G.20 W18
P2 n DA
RY 9 11/02/20 CONSULTANT ISSUE BB
9 m² G.26 VESTRY 2 tree's to remain
10 03/03/20 ISSUE FOR QS PRICING BB
cpt/t 9 m² 11 01/07/20 VE CHANGES FOR CLIENT SIGN-OFF BB
W04 SANCTUARY
5190
19
5190
cpt/t
0
G.05 D04 12 29/07/20 VE UPDATES BB
P1 59 m²
800 cpt/t 800 G.04 RL 15.340 13 18/08/20 DRAFT MINOR CHANGE DRAWINGS BB
en 14 24/08/20 CONSULTANT COORDINATION BB
scre
18
FFL 15.370 250
0 0
10
D02 250 scre ST 15 28/08/20 CONSULTANT COORDINATION BB
1
BAND en A
90
G.02 P2 16 03/09/20 CONSULTANT COORDINATION BB
PIANO 5
4 IR
4
P4 13 m² 13 m² 3
2
hr 17 15/09/20 MINOR CHANGE BB
col2 col2 1
2 UP 2
dp dp sn1
STAIR 5
Prop
W07 RL 14.445
G.08
o se
New
4000
4000
W03
d Fo
Garden
1:21 walkway
G.04
otpa
ht
dp ABBREVIATION LEGEND
3 col2 col2 3
dp ABBV DESCRIPTION
Existing Access Road
WORSHIP
a/c air conditioning unit, refer to
conc CENTER
256 m² New mechanical engineers
Garden documentation
4000
conc
4000
W03 cpt/t
G.03
SRL 14.770 W07 bal1 Balustrade, type 1, refer to 11
2 2 series details
G.09
05-01 Proposed NEW WORSHIP CENTRE GROUND Existing 05-01
New Garden col1 column, 150 steel RHS, refer to
Footpath FLOOR ENCLOSED AREA 437m² Tree structural engineers documents
dp
4 col2 col2 4 col2 column, reinforced concrete
dp column, refer to structural
Line of Roof Over
W02 RL 14.740
G.02
New
EXISTING CAR PARK col6
engineers documents
column, 89 steel RHS, refer to
new
thr Garden structural engineers documents
4000
P2
crossover
4000
W08 2
G.10 bal1 05-02 conc concrete
cpt/t carpet tile, refer to finishes
RY
schedule
NDA
AV CONTROL KIDS CORNER thr
Proposed duct as per mechanical engineers 4 m² col6 col1 RL 13.870 ctb change table, baby, refer to fitout
BOU
col1
documents, size to be confirmed. 5 5 and finishes schedule.
n
dp
rde
col2 col2 dp downpipe, refer to hydraulic
Ga
D01 fhr hr engineers documents
2000 320
w
2000 320
RL 14.715
Ne
G.01
5 4 3 2 1
300 em entry mat - recessed
FOYER
4028
matt
W01 W01
matt
CHURCH Personel pass-through door Proposed Footpath
4028
3953
G.01 56 m² Operable Wall Stacked G.11 fhe fire hydrant, existing
1 ENTRY UP 1
em cpt/t Doors when open em fhr fire hose reel
05-02 15 m² 05-02
3748 thr STAIR 1 hr SS handrail, mirror finish
conc thr New
D05 RL 14.715 sn1 sl-o sky light, dashed line represents
RL 14.730 G.05 hr Garden
Operable wall face 1 sky light over.
75
6 6 sn1
Operable wall face 2 col2 col1 dp
04-02
04-01 41 Existing P4 P4 tgsi
4283
a/c Garden
Line of Roof Over
a/c thr
STORE
PLANT 1 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 1 - Amended Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.