2008/1128 Concurrence and Advice Agency Response DERM · 132008.1128
DERM Wetlands & Conservation Estate Referral Agency Response
Sunrise Beach QLD 4567 RP901384
Material Change of Use for urban purposes if any part of
the lot is situated in, or within 100m of, any of the
following-
(a) protected area, forest reserve, critical habitat or area
of major interest under the Nature Conservation Act
1992
Reconfiguring a Lot if-
(a) any part of the lot is situated in, or within 100m of,
any of the following-
(i) a protected area, forest reserve, critical habitat
or area of major interest under the Nature
Conservation Act 1992; and
(b) the reconfiguration results in more than 10 lots, or
any lot created is less than 5ha
Recommendation
The Chief Executive, Department of Environment and Resource Management (DERM), makes the following
recommendation to the assessment manager.-
Wetland:
The Assessment Manager should consider the potential impacts of the proposed development on wetland
values, including the water quality, natural hydrological flows and ecological functioning of the wetland.
Development should meet the following outcomes:
• Maintain ecological values of the wetland. There is no loss of wetland habitat and adverse impacts on
the functioning and integrity of a wetland from development are avoided. A report prepared and certified by
an appropriately qualified professional may assist the Assessment Manager to consider the impacts of the
development on the ecological values and functioning of the wetland. If adverse impacts are unavoidable,
the Assessment Manager is encouraged to ensure that the values lost are offset in order to achieve an
environmental outcome equal or better than the wetland values that are impacted.
Where a wetland management area is mapped as a 'significant coastal wetland' under a Regional Coastal
Management Plan it should be assessed against the policy for areas of state significance (natural
resources). An Implementation Guideline should be consulted:
http://www.derm.qld.gov.au/services resources/item details. php?item id=202304&topic id=54.
For areas where a regional coastal management plan does not exist, where the wetland management area
is also defined as a 'significant coastal wetland' under the State Coastal Management Plan - Queensland's
Coastal Policy 2001 (SCMP), any approval is consistent with SCMP policy 2.8.1, Areas of state significance
(natural resources).
• Maintain wetland water quality. The water quality of any waters in and linked to the wetland is maintained
and managed to protect the environmental values of the wetland, and to ensure that the water quality
objectives listed under Schedule 1 of the Environmental Protection (Water) Policy 2009 are achieved.
• Maintain wetland water regime. The existing water regime (including surface and groundwater) within and
linked to the wetland is maintained and managed to protect existing natural hydrological processes within
the wetland ecosystem. This includes safeguarding natural fluctuations in size and location of the wetland,
and retaining and allowing for regeneration of native vegetation.
To ensure that the proposed development is able to meet the above outcomes, the Assessment Manager is
encouraged to consider the requirement for a buffer area between any proposed works and the wetland. A
wetland buffer has two components:
Page 2 of 4 • 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/1128 Concurrence and Advice Agency Response DERMRelated documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.