Martoo Planning Statement · MCU13/0211.01
Attached to the e-mail Extension to Currency Period Application- MCU13/0211.01, REC13/0136.01 & OPW15/0185.01.
Council Reference: MCU13/0211, REC 13/0136 and OPW15/0185 Our Reference: 01293 L08 NG st 31 August 2017 Chief Executive Officer Noosa Council Po Box 141 TEWANTIN QLD 4565 Attention: Planning & Infrastructure Confidential Email Transmission: [email protected] Original in Post: No Dear Sir/Madam RE: EXTENSION APPLICATION ______________________________ Development Permit for Material Change of Use for a Multiple Dwelling Type 2 Duplex x 4, Reconfiguring a Lot (boundary realignment and easement) and Operational Works (Roadworks, Earthworks, Stormwater, Access, Carparking & Landscaping) for Premises located at 126 -132 Gympie Terrace, Noosaville and described as Lots 1,2,3 & 9 on MCH3881 Martoo Consulting has been engaged by NC Oliver Properties Pty Ltd being the owner of the above sites, to request an extension to the currency period for the above development approvals. The applicant seeks to extend the relevant period by an additional 2 years. A number of development approvals have been issued over the site including a development approval for 4 duplex buildings and reconfiguration of the lots approved by Council in 2005. This approval was extended on a number of occasions, however lapsed in 2011. The applicant lodged a new application for 4 duplex buildings, reconfiguration of a lot and operational th works in 2013 which was subsequently approved by Council on 10 February 2014 under MCU13/0211, REC 13/00136 and OPW13/0862. The approval indicated a four year relevant period th from 10 February 2014 for the duplexes and reconfiguration and 2 years for the operational works. A separate application for Operational works was subsequently submitted to Council for Roadworks, Earthworks, Stormwater, Access, Carparking & Landscaping and approved by Council under th OPW15/0185. The approval indicates a two year relevant period from 4 December 2015. Due to a number of factors, the owner of the site has not been able to set aside the necessary funds for the construction of the duplexes. The owner therefore requests an extension of time for the MCU, Operational Works and Reconfiguration of a lot for a further 2 years noting: • The Noosa Plan includes the site in the Attached Housing zone which supports the development of a duplex dwellings across the sites; • The current approval was assessed under the 2006 Noosa Plan which is still relevant over the site and local area; and • The Natural Resources Overlay is relevant for the site and the development is consistent with the development provisions for this Overlay.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Page 2
STATUTORY REQUIREMENTS:
In accordance with Section 87 of the Planning Act 2016, in assessing an extension application, the
assessment manager may:
87(1) When assessing an extension application, the assessment manager may consider any
matter that the assessment manager considers relevant, even if the matter was not relevant to
assessing the development application.
ASSESSMENT:
The current development approval was assessed under the current Noosa Plan and is therefore
consistent with the current laws and policies. There are no new referral agencies and the conditions
are still appropriate. The proposed extension is considered to meet the criteria of the Act and the
applicant requests for an extension of the currency period as detailed below:
•
th th
MCU13/0211: approval lapses 10 February 2018. A further 2 years until 10 February 2020
is requested.
•
th th
REC13/0136: approval lapses 10 February 2018. A further 2 years until 10 February 2020
is requested.
•
th th
OPW15/0185: approval lapses 4 December 2017. A further 3 years and 2 months until 10
February 2020 to be consistent with the MCU and REC approvals.
This development application has been prepared in accordance with the Planning Act 2009 and is
being submitted with the following attached completed Council form. Councils application fees will be
paid upon receipt of Council file reference and fee link.
Please contact me if you require any further information and/or clarification.
Yours sincerely,
Nadine Gorton
Senior Planner
martoo consulting pty. ltd.
Used in these records
Martoo Planning Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 378 KB (small file)
- File type
No other editions are linked here.