Original source · versioned page text
Reference Document - MCU25 0101 (As Published)
Project No. PG-13872 Page | 11 August 2025 Ref: PG-13872, 2025-08-14, GR VER 1 Stephen & Jane Struss – Geotechnical Investigation - Proposed Residence, 28 Kingfisher Drive, Peregian Beach 14.0 SITE MANAGEMENT To maintain the long term performance of the structure, good management of the soil conditions and the development is vital throughout the life of the development. The following are some specific comments with respect to site management. The ground surface around the perimeter of the buildings should slope away from the structure and fall to the stormwater system. Water should not be allowed to pond adjacent to the buildings. Founding soils should not be allowed to become saturated. Saturation of the on-site material will result in an increase in settlement potential. Service trenches under the buildings should be kept to a minimum. Footings should be poured immediately after excavation. If footings cannot be poured on the same day as excavation, a blinding layer of 50mm thickness is recommended. 15.0 LIMITATIONS We have prepared this report for the Proposed Residence at 28 Kingfisher Drive, Peregian Beach. The report is provided for the exclusive use of Stephen & Jane Struss, for this project only and for the purposes outlined in the report. It should not be used by, or relied upon, for other projects on the same or different sites or by a third party. In preparing this report, we have relied upon information provided by the client or their agents. The results are indicative of the subsurface conditions on site only at the specific testing locations. Subsurface conditions can change between test locations and the design and construction should take the spacing of the testing and testing methods adopted and the potential for variation between the test locations. It is recommended that Pacific Geotech be engaged to provide advice and ensure the development is undertaken in accordance with the assumptions made in writing this report. This is not to reduce the level of responsibility accepted by Pacific Geotech, but rather to ensure that the parties who may rely on the information contained in this report are aware of the responsibilities they assume in doing so. B. ELSMORE (RPEQ 19656) For and on behalf of PACIFIC GEOTECH PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.