_6-. 2.1. Ensure that relevant checklist/s have been completed with regard to referrals _

 

 

sunshine Coast Checklist - Applications Involving Planning
Regional Council Assessment and Operational Works Assessment

 

RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly mate. (This may not always be possible and can be further checked)

 

1. APPLICATION FORMS. :

 

 

 

 

J
1.1. Form 1 required for all application & Forms 2-32
1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include J
payment of appropriate fee. (Do not receipt at this stage)
1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owner's consent is required. Y

1.1.2.1 If there are multiple owners, the consent of each owner is required,

 

 

 

1.1.2.2 If the owner of the land is a company, either ACN No, Company name (clearly indicated by

signatory) or Company Seal required.

 

IDAS., ASSESSMENT CHECKLIST _* : we . oe

 

~~ (if applicable; hot mandatory)

2.2 Ensure correct IDAS Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works)

 

 

 

 

 

 

 

 

 

 

         

 

 

 

 

 

(3. - ENVIRONMENTALLY. RELEVANT, ACTIVITIES catt “4
3.4 Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees) a
(4. FORM.2- REQUEST TO CHANGE APPROVAL. ee ee, 5, ka
4.1 Ensure that relevant items have been checked and/or completed including information regarding
s applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
(Beg PLANS occas : . Bema dag ick Ts

 

 

5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and [email protected]

(6222 SUPPORTING INFORMATION":

   

 

 

 

 

 

6.1. Ensure. that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping

 

 

 

 

 

 

 

a 1 Se : wk .
7.1 Ensure that the application fee, as determined from the Council's adopted scale. of fees,
accompanies the application or has been paid.

 

 

 

 

 

¢ Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
« Operational Works Assessment Operational Work not including Jetties

 

 

 

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

T g:Manduse\administrative processes\application checklist.doc
Full text of the other 22 pages

Page 2

  

 

 

— Main Roads (Concurrence or Advice)

e State Controlled Road
Dept Environmental Resource & Management

Advice
e Acid sulphate soils
e Wetlands
* Conservation estate
Concurrence
¢ Clearing of native vegetation on freehold land :
* Environmentally Relevant Activity (for non-devolved Council as EPA)
* Contaminated land
* Environmental Management/Contaminated Land Register
= UXO
« Land recently used as a ‘notifiable activity’
= Industrial land changed to sensitive uses (eg school)
« Coastal related development.

 

 

e Koala habitat @
Queensland Transport (Concurrence)
° Railway
° Public Passenger Transport

 

Energex or other responsible entity (Advice)
. Electricity Easements/Substations

 

DIP (Concurrence)

. SEQ Regional plan *

 

VARIOUS

 

 

 

 

 

Department of Environmental Resource Management

 

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

T g:Vanduseladministrative processes\application checklist.doc

Page 3

 

 

 

4

ct

 

-

 

 

 

 

 

 

 

 

 

Deve opment G

Gay fel

 

Application Details - IDAS form 1 » © 5 MAR 2010

e
°
{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) . g io]

Tewantin

 

You MUST complete ALL questions unless the form indicates otherwise. lncomplete forms or forms without all

 

necessary information and documentation will result in your application not being a properly made application.

For alt development applications, you must:
. complete this form (Application details - IDAS form 1)

. complete any other forms relevant to your application

application.

_ Alt terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable

Planning Regulation 2009.

 

 

¢ provide any mandatory supporting information identified on the forms as being required to accompany your

 

Applicant details (note: the applicant is the person responsible for making the application and need not bé the -

owner of the land. The applicant.is responsible for ensuring the information provided on ail IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will

be issued to the applicant.) / ,

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another

applicant" button below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name!s (individual or company name in full) PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS
For companies, contact name EMMA REED

Postal address PO BOX 299 NOOSAVILLE 4566

Contact phone number 107 5474 3480

Mobile number (non-mandatory) 10408 137 526

Fax number (non-mandatory) 107 5474 3480

e-mail address (non-mandatory) noosajetty [email protected]

 

 

 

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

 

material change of use of premises
building work

operational work

OwWOO

reconfiguring a lot

 

 

 

Department of Infrastructure and Planning} =e

 

 

 

Page 4

Te errr

OI

 

 

2. What type of approval is being sought?

 

 

—X] development permit
[1 preliminary approval
[1 both - provide details below

 

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

x] No

{[]_ Yes - complete table A and then go to question 5

 

4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

 

 

Lot on plan
Street Address se
description Local government area
Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code “| and plan no.
THE PROMONTORY Sunshine Coast Regional
1 1 NOOSAVILLE 4566 |814 SP102579 Council

 

 

 

 

 

 

 

{J Street address / lot on plan

x Street address / lot on ptan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
Channe! dredging in Moreton Bay)

 

 

Coordinates (note: place each set of

coordinates in a separate row) Zone Datum Local government
reference area (If applicable)

 

Easting .| Northing | Latitude | Longitude

 

(J Gpas4
(] wessa
_] other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m?)
997m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

 

 

 

1 |House

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

new timber jetty and aluminium boat storage device

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

Page 5

e° E

,

OOO

 

[s.ts owner’s.consent required for this application? (refer to notes at the end of this form for more information)

 

 

LJ No
—X} Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s of the land =j|ANTHONY RAYMOND OSBORN & LISA JOY PRICHARD

 

We, the above-mentioned owner/s of the land. een fie faking of this application.

 

  

 

Signature of owner/s of the tand| Ee

 

 

Date S$ |3lio-

 

 

 

 

Name of owner/s of the land

 

 

[[] The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F

 

 

Name of owner/s of the land

 

 

Oo By making this application, I, the applicant, declare that the owner has given written consent to the making of
the application. ~

 

 

9. Does the-application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

 

[x] No {Yes - complete table G

 

 

10. Identify if any of the following apply to the premises (tick applicable box/es)

 

—] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[1 _ on strategic port land under the Transport Infrastructure Act 1994 - complete table |
[J _ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 |NOOSA WATERS CANAL

 

 

 

 

11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)

 

 

[X]No_ [_]Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

 

Page 6

OOO

 

12. Does the proposal include new building work or operational work on the premises? (including any
services)

 

[No {KJ Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)

 

 

 

{X] No - Go to question 15 LJ Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

 

 

—] No

[1 Yes - provide details below

 

16. List below all of the forms and supporting information that accompany this application (include ail IDAS
orms. checklists, maridatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

 

 

Method of lodgement to

Description of attachment or title of attachment
. assessment manager

 

 

 

 

 

 

4 |FORM6 over the counter
2 |CHECKLIST over the counter
3. |JOHN NORDEN PLANS over the counter

 

 

17. Applicant’s declaration

 

 

X] By making this application, | deciare that all information in this application is true and correct (note: it is
unlawful to provide false or misteading information).

 

 

 

i . Application Details - IDAS form 1
: Version 1.0 18 December 2009

 

 

Page 7

 

 

Ooo

O

Notes for completing this form

Question 8:

¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the fand is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 9:

* Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service teave levy is payable.

e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14: :

¢ The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.

Privacy -the information collected in this form wil! be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

 

Date received | 3 ire) Reference numbers [ce | 338V

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.

Date of Name BSA Certification Building

engagement license number classification/s

 

 

 

 

 

 

 

 

Application Details - IDAS form 4
Version 1.0 18 December 2009

Page 8

Ooo

QLEAVE NOTIFICATION AND PAYMENT (for compietion by assessment manager or private certifier if applicable)

 

Date receipted

age QLeave Project [Amount ., |form sighted by|Name of officer who
Description of the work Number Paid ($) Date paid assessment sighted the form
manager

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and ail other required application materials should be sent to your assessment manager and any referrat
agencies.

 

Application Details - IDAS form 1
oe : Version 1.0 18 December 2009

 

Page 9

 

 

 

 

 

 

 

 

 

integrated Development Sone ee (iD

 

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. meen f wmerutiter
necessary information and documentation will result in your application ndt b eMelen plication.

For all development applications, you must:
if , 5 MAR 2010

    
 

 

* complete Applicant details - IDAS form 1 « le
*
° complete any other forms relevant to your application

° provide any mandatory supporting information identified on the form:

oO application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

Tewantin

as ’. * Jey acc

  
  

 

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

1, What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

 

 

{CJ building work - complete table A &X] operational work - complete table B

 

Table B

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

(] road works CJ stormwater (JJ water infrastructure
(J drainage Works {([] earthworks ([] sewerage infrastructure
(2 landscaping LD signage [ clearing vegetation under the planning scheme

X) other - please specify below

 

NEW TIMBER JETTY AND ALUMINIUM BOAT STORAGE DEVICE

What type of approval is being sought? (if you have indicated multiple works in the above question, please _
use an attachment to this form to detail each approval request)

 

development permit CO preliminary approval L both - specify below

Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

>] No (1 Yes - specify the number of lots being created

Are there any current approvals associated with this application? (e.g. material change of use)

{X] No (1 Yes - provide details below

 

 

 

 

 

Department of Infrastructure and Planning ’

 

 

 

 

Page 10

LLC)

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 20,000

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
, Version 1.0 18 December 2009

 

Page 11

LiL

 

3. Confirm-the following mandatory supporting information accompanies this application

 

Confirmation

of lodgement Method of lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following:

¢ the location and site area of the land to which the application relates
(relevant land)

« the north point

e the boundaries of the relevant land

« the allotment layout showing existing fots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, [X]confirmed | over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)

e any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points on the relevant land

 

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents []confirmed
relevant to the application

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:

¢ existing and proposed contours

« areas to be cut and filled

e the location and level of any permanent survey marks or reference
stations used as datum for the works [confirmed

¢ the location of any proposed retaining walls on the refevant land and
their height
the defined flood level (if applicable)

e the defined fill level (if applicable)

 

Applications for operational works involving roadworks

 

drawings showing:
existing and proposed contours
the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points

¢ information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)

e kerb lines including kerb radii (where not paralle! to centreline) and

tangent point changes (where not parallel to centreline)

edge of pavement where kerb is not constructed [_]confirmed

position and extent of channelisation ,

location and details of all traffic signs, guideposts, guardrail and other

street furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

changes in surfacing material

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

 

Page 12

CID

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

e existing and proposed contours

* drainage locations, diameters and class of pipe, open drains and
easements

*® manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

e inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

Li confirmed

 

Applications for operational works involving water reticulation

 

drawings showing:

kerb lines or edge of pavement where kerb is not constructed
location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments

water supply pump station details (if applicable)

minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)

location of bench marks and reference pegs

J confirmed

 

Applications for operational works involving sewerage reticulation

 

drawings showing:
location of all existing and proposed services

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert tevels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

eoeeneveoeestv ee

location of all existing and proposed sewer lines and manhole locations

(confirmed

 

Applications for operational works involving street lighting

 

drawings showing:

location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

 

(confirmed

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 13

LO

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving public utility services

 

°
e
°

drawings showing:

any existing light poles and power poles
any existing underground services
details of proposed services

alternation to existing services

(confirmed

 

Applications for operational works involving landscaping works

 

 

drawings showing:

the focation of proposed plant species

a plant schedule indicating common and botanical names, pot sizes
and numbers of plants

planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences

the proposed maintenance period

irrigation system details

[eonfirmed

 

 

 

Notes for completing this form:
® This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.

 

OFFICE USE ONLY

Date Received , Reference Numbers

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 14

 

 

 

 

 

 

 

 

 

 

 

 

integrated; Development ‘Assessment System checklist

 

Operational Works - IDAS Checklist 4

(Sustainable Planning Act 2009, version 1.0, 18 December 2009)

This checklist only applies when the development application seeks approval for operational works.

 

 

 

You should complete ali questions unless the checklist indicates otherwise
All planning and development applications require applicants to complete tne Rane lop ment Counter
° Applicant details -IDAS form 1

  

MAR 2010

If you are unsure of any answers to questions, phone or visit your local go’ ernfient., or gore the De en
ren or ooreWwanth

t
« any forms or mandatory supporting information identified as forming part Sf your applica

Infrastructure and Planning's website, www.dip.qid.gov.au.

The checklist and relevant sections do not need to be completed for applications rératng only to bunding werk ==
requiring assessment against the Building Act 1975.

 

 

Part 1 - General questions

 

 

1.4 Is the proposed operational work assessable under the planning scheme?

 

 

[-] No

 

. You must complete Building and operational work assessable against a planning scheme - IDAS
Yes form 6
. Continue on to question 1.3

 

 

1.3 \s any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?

 

 

i] No ° tt is recommended that you complete part 2 (starting from question 2.1) of this checklist.

 

(1 Yes . {tis recommended that you complete part 2 (starting from question 2.2) of this checklist.

 

 

 

1.4 Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils
apply to the development?

 

 

 

 

 

 

 

 

 

 

x] No

(Yes . It is recommended that you complete part 3 of this checklist.

4.6 ; is there any proposed operational work for filling or excavation?

XX No . It is recommended that you complete part 4 (starting from question 4.5) of this checklist.
(1 Yes ° It is recommended that you complete part 4 (starting from question 4.1) of this checklist.

 

 

 

 

Department of.infrastructure and Planning a . Gin

 

 

 

 

 

Page 15

 

:

OO

 

 

 

 

 

 

 

 

 

 

 

 

 

1.6 \s.any of the. proposed operational. work listed in schedute 12 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?

No

oy : This application requires assessment by the Department of Transport and Main Roads as a

p yes concurrence agency :

Section reference:

° Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

17 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold? —

[—X] No

Cres This application requires assessment by the Department of Transport and Main Roads as a

. concurrence agency

Section reference:

Sustainable Planning Regulation 2009, schedule 7, table 3, item 15

 

1.8

Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensiand Koala state planning regulatory provisions. (SEQ Koala SPRP)?

 

 

BX] No

 

(J Yes

. itis recommended that you complete part 5 of this checklist.

 

 

1.9

Is any of the proposed operational work associated with reconfiguring a lot and the reconfi iguration is
also assessable? --+~ > ~~~ oe nna

 

 

[—X] No

 

C1 Yes

. It.is recommended that you complete part 6 of this checklist.

 

 

1.10

Does the Vegetation Management Act 1999 ‘apply to any of the proposed operational work for the
clearing of native vegetation? .-

 

 

J No

 

(1 Yes

 

. it is recommended that you complete part 7 of this checklist.

 

 

 

 

 

 

 

 

 

 

 

 

1.11 ts any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
or from a dam constructed on a watercourse or lake?

—X] No . It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

(Yes . it is recommended that you complete part 8 (starting from question 8.1) of this checklist.

4.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 20097

—X] No

[Yes . It is recommended that you complete part 9 of this checklist.

 

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

 

 

Page 16

 

OO

 

1.13 ts-any of the-operational work proposed to be carried out within a coastal management district?

 

 

K] No

 

J Yes . It is recommended that you compiete part 10 of this checklist.

 

 

1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?

 

 

[{K] No

 

(Yes ° It is recommended that you complete part 11 of this checklist.

 

 

4.15 Is.any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 19947 . . of

 

 

x] No

 

(Yes ° It is recommended that you complete part 12 of this checklist.

 

 

 

1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 19947 : :

 

 

DX] No

 

 

(Yes ° It is recommended that you complete part 13 of this checklist.

 

 

1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
: Rivers Act 2005? / :

 

 

>] No

 

[] Yes . It is recommended that you complete part 14 of this checklist.

 

 

1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?

 

 

KX] No

 

LL] Yes ° It is recommended that you complete part 15 of this checklist.

 

 

 

Part 2 - State-controlled roads

 

 

2.1 ls the proposed operational work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?

 

 

 

 

 

XX No . End of part 2 of this checklist.
J Yes . This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency.

 

 

. End of part 2 of this checklist.

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2

 

[Part 4 - Easements and Substations.

 

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

dena ih

Page 17

LIL

 

4.5

\s-any part of the premises subject: to an easement in favour of the holder of Pipeline Licence Number
4 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
strategic pipeline?

 

 

[X] No

. End of part 4 of this checklist.

 

(Yes

 

This application requries assessment by the pipeline licence holder as an advice agency.

 

Section
e

reference:
Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9{b) and 17

 

Part 8 - Taking or interfering with water

 

 

 

 

8.8 __Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)? oe oo - .

[X]No

 

 

 

. You must complete Taking artesian or sub-artesian water - IDAS form 12.
C1Yes . This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the

Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?

 

 

—X] No

. Go to question 8.12.

 

CJ Yes

 

 

 

8.12-

Is any of the proposed operational work for any.thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)? : .

.

 

 

No

. Go to question 8.14

 

CO Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?

BX] No ° Go to question 8.19

(1 Yes

8.19 Is the proposed operational work for the following?

for the construction of a referable dam as defined under the Wafer Supply (Safety C1 Yes 5 No

and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent O] Yes {) No

 

 

If yes to any of the above you must complete Referable dam - IDAS form 16.

This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Page 18

HOO

Section reference:

Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4

Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4

Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11

Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)

Wild Rivers Act 2005, section 434

Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)

Relevant wild river declarations

Notes for completing this form:

se

Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be

completed for all development applications to be considered.
The Sustainable Planning Act 2009 is administered by the Department of infrastructure and Planning.

: Privacy - please refer to the assessment manager for further details on the use of information recorded in
.this form.

Disclaimer:

O While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

 

Operational works - IDAS checklist 4
, Version 1.0 December 2009

En

Page 19

 

Sunshine Coast ano use section FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 110

The Noosa Plan Documentation 111

APPLICATION FEES
Material Change of Use - Code/Impact MCU

Consistent §21
Inconsistent 521
Assessment under Superseded Planning Scheme : 521
Modification to a Development Permit MOD DP : 521
. Extension of a Currency Period . 521
e Lot Reconfiguration RECONFIG ~ 524
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW .
Half Hour 522
One Hour 522
ADVERTISING 4
. Purchase Advertised Applications 523
JETTIES ’ ,
” Jetty Application Fee q 2 524
Jetty Bond . Joo 51
(Category 4)
BONDS :
Performance Bond 51
(Category 9)
RCH FEE
Search of Land Use Section file 112
Liquor Licensing Request 113

total $$ [t4+20

NAME: C2. baal 2 Pog [tof ( Core, ten herr)
appress: fo Bee 1297 Vv

 

 

 

NIQOSA PEP S esGs)
FILENO: /(O/ 228 DATE: Y>/to
RECEIPT No: | 6iiGaz3 "Signature of TP Officer: / J dom,
AUTHORITY NO: “ a

 

Page 20

CALCULATION OF FEES

 

APPLICATION FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

’

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

 

TOTAL FEES

 

 

Page 21

 

1-€9/50__

 

 

 

ONDROM

 

 

NV1d ALIS

he J ce

 

Nee

 

 

 

 

9008 adv HOYVW ALNNOO
V8ARM HSIevd

alive waved
9957 6Z2SZOLdS.
SNNBAV vb8 LOT
Penal swyegVZV el MINN NOLLETUDS30
ZLb2 O99 - £0 X35 m0 XOG Od ALwad0Oud Tyv3au

2242 0999 - 40 Hd 91 BLS

euneutug uUdseq)
_ eee
—o— IAT
Soueessy
uopieneqes = if

W/L. QL1 ALA SNIUGVE

 

SYALVM VWSOON
AYOLNOWOdd SHL
vl8 LOT

ADVYOLS LVOE 3
ALLSr GaSOdOdd
NYOgSO “L

 

 

YPOBPL £190 2900 PRO
P2SLC BOPO SECON Spee}{ SECON
RLVI909 10 KOI @aug weUNG OZ

904 SCO 680 99 NEV

INOAV1 ONINVYS

 

 

 

  

 

I

 

i

 

 

 

 

 

 

     

 

' ON3 HOV3 SM3Y8OS
T33LS SSTINIVLS OML
HUM SYseVvag OL

G3XI4 GMH vb SZb X Se
“ONDIO30

 

ondavs FWXSLOZO
IN GALVIDOSSV GNV ONIHO Lid
: SNOLS 40 HVS) 38 OL SAN

 

 

 

OZLEZL ON eousOT)

 

SYsqTING
ALLSr VSOON

QL Ald Lraid

 

 

 

 

& NOILVASA 1A

  

3QO09 ONMid - 6542 SV HLIM
JONVIYOOOV NI

GS3TIVLSNI 38 TIVHS S3Tld TIV
9 CUVZVH OL
CGALVSULL GNY COOMCYWH
QSA0UddY 38 TIVHS SI Hd TV
SAN

 

 

 

 

 

ONIHO Lid SNO.LS

 

RA

L

| '
sk, 2 * ~~ 4a. s\
\ 0! Alar

4 LON Od ".LON

Ors

NOILVAS 14
a

OALVaUL NIN LMP 002 @ @

‘Sad

RRRRORC ROLE

 

 

 

” GHV 90 TH BSLVM WNWININ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GHv 0+ Ty
TIWM 30 dOL

 

 

QHv 0°b Ta
930

 

OHV 00°2 Td THAT] GOO1S GSqYO0SY WNNIXWW

 

 

 

Page 22

76 x 38 HWO

1/76 x No14 TYPE 17
STAINLESS STEEL
SCREWS @ 450 CRS

   
  

PLES:

@ 200 H8 MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY
WATH AS 2180 - PILING CODE

SECTION A.
= Ne

  
     

  

JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS

WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec

180 x 75 HWO:

PLES:
© 200 HO MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY

WITH AS 2158 - PLING CODE
200 x 75 HWO

2688

8§ 160 x 76 HWO

180 x 75 HWD

Be TAILS ; \

 

NOTES:

1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.

2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.

3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.

4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.

5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.

 

" 05/63-2

Page 23

 

__] e€9/S0__ re —

 

 

 

 

 

 

 

 

LONOAV ONINVY
SYG ONDRIOM 4
CALL Ova - 20 XV 02 X08 Od
AENL GYR - 10 Hd  SLINS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

woes nonas
—o— BT
Seeppessy 3
) £

V/5. GL Ald SNTWEVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SYALVM WSOON
AYOLNOWOWd SHL
vl8 LOT

AODVYOLS LVOS 8
ALLSar GaSOdOud
NYOsSO “1

 

 

 

 

SY30Ting
ALLar VSOON

GLI Ald braid

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X - X NOILOSS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LHSISM LVO8
WLOL WNWIXVA

 

 

 

 

 

3009 ONMid - 6842 SV HLLIM
ZONVOYOOOV NI CATIVISNI 38 TIVHS Said TIV
9 OUVZVH O1 CALV3UL ONY

QOOMGeWH GaA0udd’ 38 TIVHS SSTid TIv
‘Sad

 

 

 

“B46 UO HOE ACTIV 38 TIVHS ‘CRLVNINON 22M “HES SESINIVLS “)

ATI AOTI 9969 36N ‘TROIEEO? OL 1900 ONITEM NEHA
WITHA AOTW Cr0P 3EN *1909 OL 1900 ONICTEA NSMAA
“OLL UO ONT SV HONS SSIOOUd SSSTITT V 3SN TWHS ONKTTSM Tv 6

 

 

 

 

 

 

’ “GHV 9F'0 TH UBLVM WNWININ,

 

 

 

6809 YO 9909 HLIM AOTIV @1/1909 38 TIVHE SNOLLIIG POININTTV Tv % |
ATRAITV, - sea. ey 3000 SBUNLOMMLLS PINBAPEYV.- seetSY SH Has OHV 0'F Ta
AISNOO TIVHE NOLLOTRILSNOD TTy "SSUANSHLO CELLON SSN“ TIWM 4O dOl

 

” GHv 002 Ta TSAT1 GOO14 GSdUOOSY WANN

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0338 - Op works - Jetty [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.