(d) maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures.
(e) works programme identifying key components of the works and their respective
durations.
(f) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues.
(g) identification of complaint management procedures including:
(i) contact details for the on-site manager;
(ii) dispute resolution procedures.
(h) details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be fully
repaired at the applicant’s expense.
(i) it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Private Infrastructure
76. All private infrastructure for the development must be designed to meet the planning
scheme requirements unless otherwise agreed by the relevant authority.
77. For the purpose of preparing a Landscape Plan, a qualified person is considered to be
a landscape architect, landscape designer and/or horticulturist with a minimum of 3
years current experience in the field of landscape design.
78. For the purpose of preparing a Fauna Management Plan, a qualified person is
considered to be an ecologist with a minimum of 3 years current experience in the field
of fauna assessment and management.
79. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered
to be an ecologist with a minimum of 3 years current experience in the field of bushfire
assessment and management.
80. For the purpose of preparing a Hydrological plan, and for certifying compliance with the
hydrological requirements of this Decision Notice, a qualified person is considered to be
a hydrologist with a minimum of 3 years current experience in the field of hydrological
assessment and management.
Infrastructure Charges
81. This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued
in accordance with Council’s “Charges Resolution” made pursuant to the planning
legislation and regulations current at the time of issue.
ENVIRONMENTAL HEALTH ADVICE
Building Works
82. Noise from residential building works shall comply with the following:
(a) Limited to between 6:30am to 6:30pm Monday to Saturday.
(b) All reasonable measures are taken to minimise noise emissions
Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.