14. All buildings shall be finished in natural, muted tones and include a mix of materials as
depicted on the Approved Plans.
15. Any advertising sign or device is to comply with Council’s policies on advertising.
Access and Driveways
16. A sealed access must be provided from Sandpiper Court to all parking and manoeuvring
areas of the development. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
(a) improvements to the existing access to Sandpiper Court. The improvements must
be sufficient to cater for the existing commercial use and the additional traffic and
vehicle types (passenger, service, refuse and emergency services) generated by
the proposed development
(b) internal access roads that are generally in accordance with the approved plans
(c) driveways to each residence that are in accordance with Council’s Standard
Drawings RS-049, RS-050 and any associated addendums
(d) a driveway to the multi-unit building that is in accordance with Council’s Standard
Drawing RS-051 and any associated addendums
(e) suitable safety measures, including warning signage, to improve driver awareness
of pedestrians and enhance safety. Warning signage must be provided near the
exit from the development site to warn motorists of pedestrian movements and
other vehicles at the Sandpiper Court entrance
(f) clearly visible signage must be erected at the threshold of the internal road, which
clearly indicates to motorists and pedestrians that they are entering a private road
system
17. If the development is to be staged a temporary sealed turnaround facility must be
constructed at the end of each road left temporarily incomplete as a result of the
development staging. The temporary turnaround facility must be in accordance with an
Operational Works approval and must be of sufficient size to accommodate the 3-point
turn manoeuvre of a refuse collection vehicle
Car Parking
18. Car parking spaces must be provided in accordance with the approved plans and
marked on the site and made available and accessible at all times while the use is
operating. The works must be undertaken in accordance with an Operational Works
approval.
Service Vehicles
19. Service vehicle parking, manoeuvring and standing spaces must be provided for the
Visitor accommodation Type 4 motel building on the site in accordance with the
approved plans. The works must be undertaken in accordance with an Operational
Works approval.
Pedestrian Facilities
20. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
(a) the internal pathway network generally in accordance with the approved plans
(b) a 2m wide pathway connection to the existing pathway network located in the
reserve to the north of the site
Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.