Skip to the record
Accept no substitutions.

Original source · versioned page text

engineering drawings

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                              EARTHWORKS NOTES
                                                                                                                                                                                                                                                                                                                                                              1.  FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT
                                                                                                                                                                                                                                                                                         CUT/FILL VOLUMES:                                                        SUPPLIED.
                                                                                                                                                                                                                                                                                                                                                              2. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. IT IS RECOMMENDED THAT THE
                                                                                                                                                                                                                                                                                         (VOLUMES TO FINISHED SURFACE LEVEL)                                      GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.
                                                                                                                                                                                                                                                                                                                                                              3. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE
                                                                                                                                                                                                                                                                                         TOTAL CUT:                                           668m³               AND STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.
                                                                                                                                                                                                                                                                                                                                                              4. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING
                                                                                                                                                                                                                                                                                                                                                                  SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                                                                         TOTAL FILL:                                          78m³            5. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION
  TEMPORARY SHORING AND/OR                                                                                                                                                                                                                                                                                                                                        EQUIPMENT(E.G VIBRATING PLATE OR MINIMUM 4 TONNE VIBRATING SMOOTH DRUM ROLLER). CARE MUST BE TAKEN TO ENSURE THERE ARE
 BATTERS IN ACCORDANCE WITH                                                                                                                                                                                                                                                              BALANCE:                                     590m³ CUT                   NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND AS1289.
                                                                                                                                                                                                                                                                                                                                                              6. TEMPORARY SWALE DRAINS TO BE PROVIDED ALONG CREST AND TOE OF ANY CUTS AND ABOVE FILL BATTERS GRADING DISCHARGE TO A
  GEOTECHNICAL CONSULTANTS                                                                                                                                                                                                                                                                                                                                        CONTROL POINT FOR DISCHARGE TO EXISTING STORMWATER INFRASTRUCTURE IN ROAD RESERVE.
              SPECIFICATIONS                                                                                                                                                                                                                                                                                                                                  7. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS




                                                                                                                                                                                                                                                                                                BE
                                                                                                                                                                                                                                                                                                                                                                  TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY
                                                                                                                                                                                                                                                                                                                                                                  MOBILE PLANT ON THE SITE.




                                                                                                                                                                                                                                                                                                   R
                                                                                                                                                                                                                                                                                                                                                              8. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS




                                                                                                                                                                                                                                                                                                        RI
                                                                                                                                                                                                                                                                                                                                                                  OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL




                                                                                                                                                                                                                                                                                                           M
                                                                                                                                                                                                                                                                                                                                                                  FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO COHERENT




                                                                                                                                                                                                                                                                                                            A
                                                                                                                                                                                                                                                                                                                                                                  FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF LESS




                                                                                                                                                                                                                                                                                                                   RO
                                                                                                                                                                                                                                                                                                                                                                  THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                                                                                                                                                                                                                                                                                                                                              9. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT FOR STANDARD COMPACTION.




                                                                                                                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                              10. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                                     CH28.0                                                                    CH27.7                                                                                                                                                                             RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                                                                                                                                                                                                                                                                                                                                                  STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.
                                                                                                                                                                                                                                                                                                                                                              11. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.
                                                                                                                                                                                                                                                                                                                                                              12. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B
                                                                                                                                                                                                                                                                                                                                                                  OF AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS
                                                              2m                                                                                                                                                                                                                                                                                                  OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE
                                                             4
                                                         -3.                           1 m                                  . 53m
                                                                                                                                                                  . 0 8 m                                                                                                                                                                                         FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.
                                                                                     8                                                                                                                                                                                                                                                                        13. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX
                                                                                 -2.                                     -2                                    -3                                                                                                                                                                                                 OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                                                                                                                                                                                                                                                                                                                              14. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
                                                                                                                                                                                                                                                                                                                                                                  300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
                                                                                                                                                                                                                                                                                                                                                                  ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                                                                                                                              15. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE DRAWINGS.
                                                                                                                                                                         7    m                                         m
                                                                                                                                                                                                                   29
                                                                                                                                                                                                                                                                                                                                                              16. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
                                                               m                                                                                                       9
                                                             76                         6m                                                8m                        2.                                         0 .                                                                                                                                            17. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
                                                         -2.                      -2.
                                                                                      5
                                                                                                                                   -2.
                                                                                                                                         4                      -                                             -                                                                                                                                               18. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT
                                                                                                                                                                                                                                                                                                                                                                  FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                                                                                                                                                              19. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER
                                                                                                                                                                                                                                                                                                                                                                  RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
                                                                                                                                                                                                                                                                                                                                                              20. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
                                                                                                                                                                                                                                                                                                                                                                  LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                                                                                                                                                                                                                                                                                                                                                                  PRACTICAL TO RESTRICT DUST MOVEMENT.
                                                                                                                                                      m                        m                                          3 m
                                                                                                                                                                         75
                                                                                                                                                                                                                                                                                                                                                              21. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                                               m                              3m                                                 .0 0                  .                                            1 . 6                                                                                                                                         WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                                                                     1
                              31




                                                              4                              9                                               -2                     -
                              A




                                                             8                         -1.
                                                                                                                                                                                                                                                                                                                                                              22. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN




                                                                                                                                                                                                                                                                                                                                                     CH42.8
                                                         -1.
                                            CH0.0




                                                                                                                                                                                                                                                                                                                                                                  THE GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE
                                                                                                                                                                                                                                                                                                                                                                  FORMED AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE
                                                                                                                                                                                                                                                                                                                                                                  GEOTECHNICAL ENGINEER. PERMANENT CUT AND FILL BATTERS TO BE A MAXIMUM 1V:2.5H.
                                                                                                                                                                                                                                                                                                                                                              23. EARTHWORKS FILL BATTERS TO BE MAXIMUM OF 1M IN HEIGHT, OR OTHERWISE RETAINED.
                                                                                                                                                                                   5m                                                                                                                                                                         24. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
                                                                                                                                                    m                         1. 5                                                                                                                                                                                SPECIALIST SHORING CONTRACTOR.
                                                              0m                             6m                                               29                          -                                                   m                                                                                                                               25. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                                             0                              2                                               .                                                                            4
                                                         -1.                              .                                               1                                                                                                                                                                                                                       CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL ENGINEER.
                                                                                       -1                                                -                                                                           0.0                                                                                                                                      26. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES
                                                                                                                                                                                                                                                                                                                                                                  ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
                                                                                                                                                                                                                                                                                                                                                                  SATISFACTION.
                                                                                                                                                                                                                                                                                                                                                              27. EARTHWORKS LEVELS SHOWN ARE FINISHED DESIGN SURFACE LEVELS LOWERED BY NOMINAL 200mm TO ALLOW FOR SLAB AND SURFACE
                                                                                                                                                                                                                                                                                                                                                                  WORKS. CONTRACTOR TO CONFIRM FINISHED EARTHWORKS LEVLS BASED ON STRUCTURAL ENGINEERING DRAWINGS FOR BUILDING SLAB
                                                                                                                                                                                                                                                                                                                                                                  THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR DRAINAGE TO CONFIRM FINAL EARTHWORKS SURFACE LEVEL.
                                                                                                                                                                                                                                                                                                                                                              28. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                                                                                                                                                      m                            m                                        5 m                                                                                                                                   FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE THE PRELOADING OPERATIONS.
                                                              m                            m                                                                                     2                                        7
                                                             9                          .21                                                       .02                         .1                                      0 .
                              31




                                                                                                                                                                                                                                                                                                                                                              29. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                                            1                                                                                                          -0
                              B




                                                         0.                        -0                                                        -1




                                                                                                                                                                                                                                                                                                                                                     CH42.8
                                                     -
                                           CH0.0




                                                                                                                                                                                                                                                                                                                                                                   DEPTH LEGEND

                                                                                                                                                                                                                                                                                                                                                                        -3.8 to -3.6
                                                                                                                                                                                                                                                                                                                                                                        -3.6 to -3.4
                                                                                                                                                                                                                                                                                                                                                                        -3.4 to -3.2
                                                                                                                                                                                                                                                                                                                                                                        -3.2 to -3.0
                                                                                                                                                                                                                                                                                                                                                                        -3.0 to -2.8
                                                                                                                                                                                                                                                                                                                                                                        -2.8 to -2.6
                                                                                                                                                                                                                                                                                                                                                                        -2.6 to -2.4
                                                                                                                                                                                                                                                                                                                                                                        -2.4 to -2.2
                                                                                                                                                                                                                                                                                                                                                                        -2.2 to -2.0
                                                                                                                                                                      CH0.0                                                                                                                                                                                             -2.0 to -1.8
                                                                                                 CH0.0                                                                                                                                                                                                                                                                  -1.8 to -1.6
                                                                                                                                                                                                                                                                                                                                                                        -1.6 to -1.4
                                                                                                                                                                                                                                                                                                                                                                        -1.4 to -1.2
                                                                                                                                                               31
                                                                                                                                                               D
                                                                                       31
                                                                                       C




                                                                                                                                                                                                                                                                                                                                                                        -1.2 to -1.0
                                                                                                                                                                                                                                                                                                                                                                        -1.0 to -0.8
                                                                                                                                                                                                                                                                                                                                                                        -0.8 to -0.6
                                                                                                                                                                                                                                                                                                                                                                        -0.6 to -0.4
                                                                                                                                                                                                                                                                                                                                                                        -0.4 to -0.2
                                                                                                                                                   BOTTLEBRUSH AVE
                                                                                                                                                                                                                                                                                                                                                                        -0.2 to -0.0
                                                                                                                                                                                                                                                                                                                                                                        0.0 to 0.2
                                                                                                                                                                                                                                                                                                                                                                        0.2 to 0.4
                                                                                                                                                                                                                                                                                                                                                                        0.4 to 0.6
                                                                                                                                                                                                                                                                                                                                                                        0.6 to 0.8
                                                                                                                                                                                                                                                                                                                                                                        0.8 to 1.0
                                                                         North Point         Approved                                                                                                                                                                                                                        Project Address                                     Title
                                                                                                                                                                                                                                                                                                                             37 BOTTLEBRUSH AVENUE                               BULK EARTHWORKS PLAN
 E    14.11.24   OPW AMMENDMENT                               TS   MP    N                                                                                                                                                                                                                                                   NOOSA HEADS
 D    15.03.23   RFI UPDATE                                  BRP   NW                        For and on behalf of RECOR Pty Ltd.
 C    29.11.27   RFI UPDATE                                  BRP   NW                        Scale                                                                                                                          ENGINEERING & PROJECT SERVICES                                                                   Client Details                                      Project Name                                                                                Sheet Size
                                                                                                                                                                                                                               SUNSHINE COAST | BRISBANE
 B    10.10.22   RFI UPDATE                                  BRP   NW                                        1:100      0      1             2       3    4m                                                                  www.recor.au | ABN 89 647 469 707                                                              S & J KNOBEL                                        RESIDENTIAL UNIT DEVELOPMENT                                                                   A1
 A    12.05.22   MCU / OPW ISSUE                             BRP   NW                                                                                                                   COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                      Project Number                                    Drawing Number                             Revision

Rev   Date                    Revision Description         Drawn Check                                               DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                        client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
                                                                                                                                                                                                                              'Issued For Construction' in the revision description.                                                                                              20220051                                         C30                                           A
Log in to download the original file

engineering drawings.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.