Original source · versioned page text
2019-08-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 AUGUST 2019
2. The proposal is contrary to the provisions of the Planning Scheme in that it
proposes development:
a. in the Landslide Hazard Area thereby placing people and property at risk and
does not maintain the natural processes and protection function of land forms
and vegetation contrary to the provisions of the Building Works Code.
b. that is not sited to minimise risk to users, contrary to the Building Works
Code.
c. in the Coastal Protection Area extending seaward of the Coastal Building
Line and is likely to adversely impact upon natural coastal processes contrary
to the requirements of Schedule 1 of Noosa Plan and the Natural Resources
Code.
d. which does not protect the dunal area and natural environmental nor
maintain the safety of people and works contrary to the Overall Outcomes
for the Eastern Beaches Locality.
3. The proposal is contrary to the provisions of the draft Planning Scheme in that it
proposes development:
a. in the Coastal Protection Area extending seaward of the Coastal Building line
and does not allow for natural fluctuations of the coast and foreshore to
occur, including allowance of climate change.
b. which has not been sited to minimise the risk from coastal processes as the
development has not been located as far landward as practicable to ensure
people and property are not at risk from coastal hazards and avoid the need
for additional coastal protection works.
4. Recent modelling carried out by the Council indicates significant erosion is likely to
occur in the future which may threaten life and property should the proposed
development proceed.
5. Given the site is affected by the Coastal Building Line and is located in a highly
vulnerable erosion prone area, the proposed 6m setback is not sufficient to
minimise the risk of erosion.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
11 BUDGET REVIEW 1 (BR1) FOR THE 2019-20 FINANCIAL YEAR
Committee Recommendation
Moved: Cr Pardon
Seconded: Cr Jurisevic
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 12 August 2019 and approve the proposed changes to the budget for the
2019/20 financial year as outlined in the Revised Budget Financial Statements attached to the
report.
Carried.
Page 18 of 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.