Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
As indicated by toothed bucket very slow digging terminations at depths of about 2.3 m and 2.7 m BGL, low to medium strength (or stronger) sedimentary rock could be expected in deeper excavations. Excavations into any low to medium strength (or stronger) sedimentary rock would likely require the use of ripper and/or hydraulic rock breaking attachments with large equipment (e.g. 20 to 40 tonne excavator(s)), particularly in any confined excavations (e.g. service trenching). If high strength (or stronger) rock requires excavation, other specialised excavation methods (e.g. pre-splitting the rock using expansive grout etc.) may be required. Should vibratory excavation techniques be adopted (e.g. rock hammering), ground vibrations should be monitored, and excavation methods may need to be altered should adverse impacts be anticipated or encountered on neighbouring structures. Should groundwater seepage be encountered during construction, such seepage should be readily removable using gravity drainage at a low point in the excavation. 6.2.3 Batter Slopes Unsurcharged cut batters to a maximum of 2 m deep may be temporarily formed at 1V:1H in stiff/medium dense (or stronger) residual soils and very low strength sedimentary rock, provided groundwater is not encountered. Steeper temporary batters may be permissible in low strength (or stronger) rock subject to an assessment during construction by a geotechnical RPEQ. Where space limitations occur or the above temporary batter slopes are not achievable, installation of temporary retention would be required. Permanent batters in medium dense/stiff (or stronger) natural soils and very low strength sedimentary rock up to 2 m deep may be formed at 1V:2H. Steeper and higher batters may be permissible in low strength (or stronger) weathered rock subject to an assessment during construction. Permanent batters up to 1.5 m high in future controlled fill on slopes <20° may be formed no steeper than 1V:2.5H. Fissured clays were noted in the test pits and so it is recommended that a geotechnical RPEQ inspect all batters at the time of construction. Permanent batter slopes will require some form of erosion protection such as revegetation by landscaping (e.g. topsoil, Jute matting and planting). 6.2.4 Filling Future Building Works must consider the limitations on earthworks given in Section 6.1 above. The site soils, where free of deleterious materials (e.g. organics, oversize etc.), could be reused as structural fill, or as non-structural fill (e.g. in landscaping areas, batters, etc.). The weathered rock could be used as structural fill provided the materials can be broken down to suitable particle sizes (<100 mm). Should importation of fill be required, it is recommended that such fill should comply with the following: Minimum CBR of 10% Maximum plasticity index of 15% Maximum particle size of 100 mm All structural fill should be compacted at moisture contents within the range of ±2% of OMC for Standard Compaction. Fill should be placed in 250 mm thick (loose thickness) layers and be compacted by repeated rolling to achieve 75% of the Density Index for cohesionless fills (e.g. sands) or a dry density Geo-Environmental Investigation for Proposed Subdivision 7 February 2025 | 24386-001-Rev0 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.