Original source · versioned page text
Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
All excess stormwater collected around the proposed development area, including the effluent disposal area, must be directed by pipes or surface channels (e.g. rock lined ‘dry creek’ beds) to discharge at least 10 m away from and downslope of any structure or embankment, and not towards the effluent disposal areas. Discharge should be directed towards the natural drainage lines, where possible. A surface dissipation device such as rock weir or rock lined contour drain must be installed at the stormwater outlet(s). Subsurface disposal of stormwater must not be undertaken (including infiltration pits). 6.6 Pavement Design Parameters Laboratory testing of the clayey silt from test pit TP8 indicated a CBR value of 6 %. Pavement design will be dependent upon the subgrade materials present after earthworks. Following preparatory earthworks, we anticipate the pavement subgrades in the centre and southern end of the site will likely comprise mostly stiff (or stiffer), high plasticity silty clays or high liquid limit clayey silts; or weathered siltstone in areas of deeper cuts. Pavement subgrades at the northern end of the site are likely to comprise clayey sands/sandy clays or weathered sandstone in deeper cuts. Due to the high silt/clay content, the natural soil subgrades would be susceptible to poor engineering qualities if they become significantly wet of OMC. Earthworks planning would be prudent to avoid saturation of the natural subgrades. Provided removal of any unsuitable materials is undertaken as outlined within this report, preliminary pavement design could be carried out adopting a design CBR value of 3% for the natural clay and silt subgrades and design CBR value of 5 % for the natural clayey sands. Should significant ‘wetting’ of the natural subgrade occur, over-excavation of the silts and replacement with select, granular materials may be required during construction to achieve a design CBR value. Where future fill provides at least 500 mm deep coverage across the natural soils, pavement design may be based upon the CBR value of those materials. In sections of the alignment where very low strength (or stronger) weathered rock is exposed consistently over the full width of the road, a presumptive CBR value of 10 % could be adopted for design. All pavement subgrades must be ‘proof rolled’ and visually assessed by an experienced RPEQ engineer to ensure no heaving or unacceptable subgrade deflection occurs. Should heaving or deflection occur, excavation of ‘soft spots’ may be required, followed by reinstatement with compacted select granular fill. Subgrades should be compacted to 100% DDR (standard) at optimum moisture content with confirmatory testing carried out prior to pavement construction. The recommended design CBR values are applicable to properly drained subgrades only and must be confirmed by subgrade inspection and testing (if required), following earthworks. ‘Properly drained subgrades’ require open graded drains, site grades that shed water and prevent ponding, and subsurface drains adjacent to pavements. 6.7 Geotechnical Certification of Operational Works NC generally requires subdivision Operational Works on hillside sites to be certified by a geotechnical RPEQ prior to Plan Sealing. Should Tectonic be required to certify the Operational Works, inspections must be completed by Tectonic at various stages during construction (e.g. following site stripping, post completion etc.) to ensure the recommendations provided within this report have been adhered too. Tectonic should be contacted prior to commencement of Operational Works to confirm specific inspection requirements. Geo-Environmental Investigation for Proposed Subdivision 7 February 2025 | 24386-001-Rev0 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.